| Course | INT 620 International Corporate Finance |
|---|---|
| Module | Module 6 |
| Paper type | graduate discussion post on country risk and the cost of capital for foreign projects |
| Length | About 380 words, 3 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MS Finance |
| Updated | October 2026 |
Free sample paper for INT 620 Module 6
Module Six Discussion
A Flat Four Percent Is Not an Analysis
Kettle Moraine Process Systems values projects in the United States at a dollar discount rate of 9 percent. For any emerging market, the finance team adds 4 percent. For the Gujarat plant, that means 13 percent. Nobody I asked could say where the 4 percent came from; it was set during a Brazilian project fifteen years ago.
Stulz (1999) made the case that once investors can hold assets worldwide, a project's required return should depend on how it moves with the world market, not on how volatile its host economy looks in isolation. Much of India's country-specific risk, from a regional drought to a state tax change, is diversifiable for Kettle Moraine's shareholders and should not raise the discount rate. Some risk, such as India's sensitivity to global downturns, is systematic and may justify a premium.
Erb et al. (1996) reported that composite ratings of a country's risk covering political, economic and financial risk were related to expected equity returns across countries, which gives one basis for sizing a premium. Bekaert et al. (2016) isolated the slice of government bond yields that compensates for political danger and showed it weighs on what foreign investments are worth, and that political risk insurance could reduce them. India's sovereign spread over U.S. Treasuries is a market measure of default and political risk; a premium near that spread, perhaps 1.5 to 2 percent, is more defensible than an inherited 4 percent.
Specific risks, a delayed land approval, a change in import duties on stainless steel or a year of slow dairy investment, are better handled by adjusting expected cash flows and running scenarios. Adding them to the rate as well would count them twice.
Use about 11 percent for Gujarat, the parent's rate plus a premium near India's sovereign spread, and build specific risks into the cash flow scenarios. The difference is not academic: at 13 percent the plant's estimated value is roughly half what it is at 11 percent, enough to push it below other projects competing for the same capital. An inherited rule should not decide a $160 million investment.
How does your employer set discount rates for foreign projects, and could anyone explain where the premium came from?
References
Bekaert, G., Harvey, C. R., Lundblad, C. T., & Siegel, S. (2016). Political risk and international valuation. Journal of Corporate Finance, 37, 1-23. https://doi.org/10.1016/j.jcorpfin.2015.12.007
Erb, C. B., Harvey, C. R., & Viskanta, T. E. (1996). Political risk, economic risk, and financial risk. Financial Analysts Journal, 52(6), 29-46. https://doi.org/10.2469/faj.v52.n6.2038
Stulz, R. M. (1999). Globalization, corporate finance, and the cost of capital. Journal of Applied Corporate Finance, 12(3), 8-25. https://doi.org/10.1111/j.1745-6622.1999.tb00027.x
What the INT 620 Module 6 instructions ask for
The country risk discussion in INT 620 usually asks how multinationals should incorporate political, economic and currency risks of foreign countries into investment decisions and the cost of capital. Prompts may ask about country risk premiums, sovereign spreads, adjusting discount rates versus adjusting cash flows or how global market integration affects the cost of capital. A good graduate post applies these ideas to a specific project, explains which risks are diversifiable and which are not, uses empirical research on country risk and valuation, takes a position on method and asks classmates about practice in their own organizations. Some instructors also ask how political risk insurance would change the analysis.
How this INT 620 Module 6 discussion example is built
The sample describes how Kettle Moraine Process Systems' finance team values every emerging-market project by adding a flat 4 percent to the parent's dollar discount rate, and asks whether that is right for the Gujarat plant. Using Stulz's argument that in integrated capital markets only risks investors cannot diversify should raise the cost of capital, Erb, Harvey and Viskanta's evidence linking country risk ratings to expected returns and Bekaert, Harvey, Lundblad and Siegel on how political risk spreads affect valuation, the post argues for a smaller premium based on evidence for risks that cannot be diversified, with explicit cash flow adjustments for specific risks such as delayed approvals or currency convertibility, and asks peers how their firms do it.
Where the INT 620 Module 6 rubric puts the points
Country risk discussions in INT 620 are usually judged on understanding of how country risk affects the cost of capital, the distinction between diversifiable and systematic risk, application to a project, the evidence used and the substance of replies. Posts at the top take a clear position on discount rate versus cash flow adjustments, justify the size of any premium with evidence and identify specific risks for the project. Credit is lost for arbitrary premiums, for penalizing one risk twice, once in the hurdle rate and again in the forecast, for ignoring currency convertibility or expropriation risk, when citations are missing, and when replies accept a premium without asking where the number came from.
INT 620 Module 6 help: the mistakes that cost points
Begin with the method your organization or case uses and ask what risk the extra percentage points are meant to cover. Then separate risks: some, such as a broad slowdown in a country correlated with world markets, cannot be diversified and may belong in the discount rate; others, such as a permit delay or a specific tax change, are better handled by adjusting cash flows or scenarios. Use research on market integration, country risk ratings and political risk spreads to size any premium. Avoid counting the same risk twice. End by asking classmates how their employers set discount rates abroad, which brings real practices into the thread.
Get INT 620 Module 6 written to your instructions
Send the INT 620 Module 6 prompt and the foreign project you are valuing. We separate risks that belong in the discount rate from those that belong in the cash flows, ground the choice in country risk research and close by inviting classmates to describe how hurdle rates abroad get set at work. Two days, give or take; opening posts are on us. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More INT 620 papers and related MS Finance samples
- INT 620 Module 1 Discussion: When Cash Arrives in Four Currencies
- INT 620 Module 2 Parity Conditions Assignment: Do Interest and Price Parity Hold for the Euro, Kiwi and Real?
- INT 620 Module 3 Discussion: Should Kettle Moraine Hedge at All?
- INT 620 Module 4 Transaction Exposure Assignment: A Kiwi Receivable and a Euro Payable
- INT 620 Module 5 Milestone One: Economic and Translation Exposure Across the Group
- INT 620 Module 7 Capital Budgeting Assignment: Valuing the Gujarat Plant
- INT 620 Module 8 Milestone Two: Financing the Plant: Rupees, Dollars or Euros
- INT 620 Module 9 Discussion: Cash Pools, Dividends and Transfer Prices
- INT 620 Module 10 Final Project: The International Financial Strategy
- ACC 640 Module 3 Milestone One: Materiality and the Risks That Matter
- FIN 700 Module 7 Discussion: Should the Company Hedge Natural Gas for Its Kilns?
- FIN 610 Module 7 Discussion: Where to Park the Autumn Surplus
- ACC 691 Module 5 Asset Overstatement Assignment: Capitalized Costs and Missing Inventory
INT 620 Module 6 questions, answered
Where can I find a free INT 620 Module 6 Discussion sample?
The full INT 620 Module 6 post is on this page, showing how to reflect India's country risk in valuing a new plant.
What is a country risk premium?
An addition to the discount rate for investments in a particular country, intended to reflect risks such as political instability, economic volatility or currency problems.
Does country risk belong in the hurdle rate or in the forecast?
Risks investors cannot diversify may justify a higher discount rate, while specific, diversifiable risks are usually better handled by adjusting expected cash flows or using scenarios.
How does capital market integration affect the cost of capital?
In integrated markets, investors can diversify internationally, so only risks correlated with the global market should raise required returns, generally lowering the cost of capital.
What is political risk in valuation?
The possibility that government actions, such as expropriation, regulation or capital controls, reduce a project's value, which can be measured using sovereign spreads or risk ratings.