| Course | ACC 691 Detection and Prevention of Fraudulent Financial Statements |
|---|---|
| Module | Module 5 |
| Paper type | graduate assignment analyzing asset overstatement schemes |
| Length | About 1,080 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MS Accounting |
| Updated | October 2026 |
Free sample paper for ACC 691 Module 5
Analysis of Capitalized Engineering Costs and Inventory Overstatement, 2024-2025
[Student Name]
Southern New Hampshire University
ACC 691: Detection and Prevention of Fraudulent Financial Statements
Module Five Assignment
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Analysis of Capitalized Engineering Costs and Inventory Overstatement, 2024-2025
Introduction
After the revenue schemes of late 2024, the company's managers needed additional profit that would not show up as unusual sales. They found it on the balance sheet. This paper analyzes two asset schemes uncovered by the 2026 investigation: the capitalization of engineering costs that did not qualify, and the double counting of finished goods moving between the main plant and a second assembly plant forty miles away. For each, it explains the scheme, identifies the requirement it violated, measures the effect on assets and pretax income for 2024 and 2025, describes concealment and recommends controls.
Scheme One: Engineering Costs Recorded as Software
In 2023 the company began developing controller software that would let restaurant chains monitor ovens remotely, a product it planned to sell. Under the software guidance for products to be sold, costs incurred after technological feasibility is established may be capitalized, while earlier costs, and all other engineering work, fall under ASC 730 and are expensed as incurred (Kieso et al., 2019). The project reached feasibility in March 2024, so a limited amount of coding and testing after that date could be capitalized.
From the third quarter of 2024, the vice president of engineering, at the CFO's request, told staff to charge their hours to the software project code regardless of the work. Time records later showed that about 70 percent of hours charged to that code went to redesigning fryer baskets, heating elements and door seals for existing equipment. Those activities are research and development or ordinary product maintenance; neither qualifies for capitalization.
The distinction is not a technicality. Capitalization is allowed for software after feasibility because, at that point, the company has shown that a saleable product exists and that the remaining costs build an asset with future revenue behind it. A redesigned fryer basket has no such separate future benefit; it keeps existing products competitive, which is what ordinary engineering is for. By moving those hours onto the software code, managers created an asset that represented nothing the company could sell, license or use apart from its existing product line.
Engineering costs capitalized versus qualifying, in millions
| Year | Capitalized | Qualifying | Improperly capitalized | Amortization recorded on excess |
|---|---|---|---|---|
| 2024 | $11.4 | $2.0 | $9.4 | $0.0 |
| 2025 | $9.8 | $1.1 | $8.7 | $1.3 |
Amortization began in 2025 when the first module was released, so the 2025 income effect is the improperly capitalized amount less the amortization already recorded on it.
Scheme Two: Inventory Counted at Both Plants
Finished ovens moved daily between the second assembly plant and the main plant's warehouse. At the 2024 and 2025 year ends, the plant controller recorded truckloads sent in the last three days as goods in transit, keeping them on the shipping plant's books. The receiving warehouse, however, had already unloaded and counted many of the same units in its physical count. The result was that $7.6 million of finished goods at the end of 2025, and $3.6 million at the end of 2024, appeared twice. Inventory must be measured once, at cost, by whichever location has it, and goods in transit are recorded only until they arrive (Kieso et al., 2019).
Since a larger closing stock figure shrinks the cost charged against sales, each dollar of overstated ending inventory raises gross profit by a dollar in that year, and lowers it by the same amount the following year when the overstated balance becomes opening inventory. To keep 2025 profit up, the scheme had to grow, which is why the overstatement rose from $3.6 million to $7.6 million.
Quantifying the Effects
Overstatement of pretax income by year, in millions
| Item | December 31, 2024 | December 31, 2025 |
|---|---|---|
| Capitalized engineering, net | $9.4 | $16.8 |
| Finished goods inventory | $3.6 | $7.6 |
| Total assets overstated | $13.0 | $24.4 |
| Item | 2024 | 2025 |
| Engineering costs not expensed | $9.4 | $7.4 |
| Inventory, change in overstatement | $3.6 | $4.0 |
| Total pretax income overstated | $13.0 | $11.4 |
The 2025 engineering figure is the $8.7 million of improper capitalization less $1.3 million of amortization on the excess. Combined with the revenue schemes analyzed in Module Two, the asset schemes made the difference between missing and meeting guidance in both years.
Concealment
The engineering scheme was concealed in plain sight. The project code was legitimate, so charges to it raised no automatic alert, and the capitalization memo prepared each quarter by the controller simply multiplied hours on the code by a standard rate. No one compared the code with project descriptions or engineers' weekly reports. The inventory scheme relied on timing. The in-transit list was prepared by the shipping plant's controller after the count, and the warehouse count sheets were not reconciled with shipping records until mid-January, after the auditors had completed their inventory procedures. Count sheets at the second plant were later found to include handwritten additions in a different ink.
Red Flags
Several signs appeared in the records. Other noncurrent assets rose by more than a third in 2024, which the company attributed to software investment, although its research spending reported in the notes fell by a similar amount. Days inventory rose from 64 to 72 in 2025, without a production slowdown, and the in-transit balance at year end was about four times its average at quarter ends. The COSO study of fraud cases by Beasley et al. (2010) found that overstated assets, including capitalized expenses and inventory, were among the most common methods after improper revenue recognition. Dechow et al. (2011) similarly found that growth in soft assets helped predict misstatements.
Recommended Controls
For capitalization, the company should adopt a written policy listing the criteria and require the controller and an engineering manager outside the project to approve each quarter's capitalized amount with a sample of time entries traced to work descriptions. Internal audit should test the policy annually. For inventory, every interplant shipment should carry a transfer document matched at receipt, the in-transit list should be prepared before the count by someone independent of both plants, and the count should be reconciled with transfers within two days. External auditors should observe counts at both locations at the same time, since staggered counts allow goods to be counted twice.
Conclusion
The engineering scheme violated the requirement to expense research and development, and the inventory scheme violated the rule that inventory is counted once, by the location that has it. Together they overstated assets by $24.4 million at the end of 2025 and pretax income by $13.0 million and $11.4 million in the two years. Both were hidden in records that no one reconciled, which makes reconciliation the central control.
References
Beasley, M. S., Carcello, J. V., Hermanson, D. R., & Neal, T. L. (2010). Fraudulent financial reporting: 1998-2007: An analysis of U.S. public companies. Committee of Sponsoring Organizations of the Treadway Commission.
Dechow, P. M., Ge, W., Larson, C. R., & Sloan, R. G. (2011). Predicting material accounting misstatements. Contemporary Accounting Research, 28(1), 17-82. https://doi.org/10.1111/j.1911-3846.2010.01041.x
Kieso, D. E., Weygandt, J. J., & Warfield, T. D. (2019). Intermediate accounting (17th ed.). Wiley.
What the ACC 691 Module 5 instructions ask for
The Module Five assignment in ACC 691 moves from revenue to the balance sheet. It typically describes one or more asset schemes, such as improper capitalization, fictitious or overstated inventory, or overvalued receivables and investments, and asks you to analyze each. You explain how the scheme worked, cite the accounting requirement it violated, quantify its effect on assets and income for each period, describe how it was concealed and recommend controls. Graders expect you to see that inflating an asset almost always inflates income too, because the other side of the entry is an expense that was avoided. Plan on a paper of several pages with tables for the numbers.
How this ACC 691 Module 5 asset overstatement assignment example is built
The paper takes two schemes. In the first, engineering managers charged $11.4 million in 2024 and $9.8 million in 2025 to a project code for connected-oven controller software, though time records show most of the hours went to redesigning fryer baskets, heating elements and door seals. Only $3.1 million qualified for capitalization; the rest was research and development that must be expensed. In the second, plant accountants recorded $7.6 million of finished goods shipped between two plants as in transit while the receiving plant also counted them. A table measures the combined overstatement of pretax income at $13.0 million in 2024 and $11.4 million in 2025, and the paper names the time records, count sheets and reconciliations that exposed each scheme.
Where the ACC 691 Module 5 rubric puts the points
The rubric for this assignment usually scores the explanation of each scheme, identification of the violated requirement, quantification by period, analysis of concealment, red flags, recommended controls and writing. Top papers cite the specific guidance, such as ASC 730 for research and development or the capitalization criteria for software, explain why a particular cost does or does not meet it, and show the effect on both the balance sheet and the income statement. They also recognize that an overstatement carried forward affects later periods, either by reversing or by growing. Common deductions come from describing a scheme without numbers, treating all capitalization as improper or forgetting amortization when computing the effect.
ACC 691 Module 5 help: the mistakes that cost points
Students sometimes compute the asset overstatement correctly and then forget that the same entry overstated income, or they double count by adding both to a single total. Keep one table for the balance sheet at each year end and another for income by year. If your case involves software, check which standard applies; internal-use software and software to be sold follow different rules, and the distinction often decides the case. For inventory schemes, show how the count or reconciliation was manipulated, not only the amount, because concealment is part of what the course grades. A short paragraph on how an auditor's observation could have caught it adds depth.
Get ACC 691 Module 5 written to your instructions
Send the ACC 691 Module 5 case and its questions. The paper will test each asset scheme against its standard, quantify assets and income by year, trace the concealment and propose controls. You should have it within two days or so, and the first one is written free. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More ACC 691 papers and related MS Accounting samples
- ACC 691 Module 1 Discussion: Why Executives Misstate Results
- ACC 691 Module 2 Revenue Schemes Assignment: Bill-and-Hold and a Stuffed Channel
- ACC 691 Module 3 Milestone One: Reading the Red Flags and the M-Score
- ACC 691 Module 4 Discussion: Cookie Jars and a Big Bath
- ACC 691 Module 6 Milestone Two: How the Board and Audit Committee Failed
- ACC 691 Module 7 Discussion: Why the Auditors Missed It
- ACC 691 Module 8 Concealed Liabilities Assignment: A Guarantee Nobody Disclosed
- ACC 691 Module 9 Milestone Three: Quantifying the Restatement
- ACC 691 Module 10 Final Project: A Program to Prevent It Happening Again
- SPT 620 Module 2 Financial Statements Assignment: Reading Salt Creek's Books
- OL 610 Module 10 Discussion: The Future of Employee Voice
- OL 630 Module 5 Milestone Two: Marketing, Operations and Management Plan
- ACC 610 Module 9 Milestone Three: The Statement of Cash Flows and Key Disclosures
ACC 691 Module 5 questions, answered
Where can I find a free ACC 691 Module 5 Asset Overstatement sample?
This page includes a complete ACC 691 Module 5 assignment on improperly capitalized engineering costs and double-counted inventory at a kitchen equipment maker.
Why does capitalizing an expense overstate income?
Because a cost that belongs on the income statement now is placed on the balance sheet as an asset and spread over later years through amortization, so current profit rises by the amount not expensed.
Which engineering costs must be expensed?
Under ASC 730, research and development costs are generally expensed as incurred, while certain software costs can be capitalized only after specific criteria are met.
How is inventory overstated in a fraud?
Common methods include fictitious count sheets, counting goods twice at different locations, failing to write down obsolete items and recording goods in transit that were never shipped.
What controls prevent improper capitalization?
A written policy with criteria, review of project codes by someone outside engineering, comparison of time records to project descriptions and periodic testing by internal audit.