| Course | MBA 687 Leading Organizational Change |
|---|---|
| Module | Module 4 |
| Paper type | Change model diagnostic report |
| Length | About 1,120 words, 7 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MBA |
| Updated | October 2026 |
Free sample paper for MBA 687 Module 4
Diagnosing the One Platform Change With the Burke-Litwin Model and Choosing a Change Model to Lead It
[Student Name]
Southern New Hampshire University
MBA 687: Leading Organizational Change
Module Four Report
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Diagnosing the One Platform Change With the Burke-Litwin Model and Choosing a Change Model to Lead It
Purpose
Veritane US, the Delaware branch of a Singapore supply chain software company, is preparing for the One Platform program: 38 enterprise clients will move from U.S. custom code onto the parent's global configurable platform over 18 months, and branch engineers will join product squads shared with Singapore. The readiness assessment found that employees accept the need for change but doubt this approach and doubt leadership's commitment. Before building a plan, leaders need a structured view of which parts of the organization the change touches and how deeply. This report uses the Burke-Litwin model for that diagnosis and then selects a change model to guide the plan.
Why Burke-Litwin
Burke and Litwin (1992) linked twelve organizational factors in a model intended to explain both performance and change. It separates transformational factors, which, when they change, require new behavior across the whole organization, from transactional factors, which govern day-to-day operations and can often be adjusted without deep disruption. The model suits this case because the branch's leaders have been describing One Platform as a technical migration. If the diagnosis shows that transformational factors are involved, the plan must be built for a transformation, not a systems project.
External Environment
The pressure for change comes from outside the branch. Supply chain software buyers increasingly expect cloud products that update continuously, and competitors release features monthly to all customers at once. Maintaining 38 versions of the product has slowed the branch's release cycle to twice a year and left several clients on versions that lack current security features. Headquarters' decision reflects a market that rewards scale and speed over tailoring.
Mission and Strategy
The branch's working mission has been customer intimacy through tailored solutions. The parent's strategy is one global product configured rather than customized. One Platform replaces the branch's mission with the parent's, which is a transformational change: it alters what the branch is for, not only how it works. Employees sense this, and the drop in agreement between the need for change and the appropriateness of this change reflects it.
Leadership
Leadership is the weakest transformational factor. The general manager is new, and only 27 percent of employees believe leaders will see the change through. Headquarters leaders are distant and associated with the abandoned customer system rollout. Burke and Litwin place leadership among the factors that shape everything below it, so this weakness will surface in management practices, climate and motivation unless it is addressed directly.
Organizational Culture
The branch's core assumption, that it wins by building whatever the client asks, runs against the change. Communication and decision norms also differ between the branch and headquarters, producing mutual misreadings. Culture is therefore both a target of the change and a condition for it.
Transactional Factors
Table 1 summarizes the full diagnosis, including the transactional factors.
Table 1
Burke-Litwin Diagnosis of the One Platform Change
| Factor | Type | Current condition | Touched by One Platform? |
|---|---|---|---|
| External environment | Transformational | Market favors fast, uniform releases | Source of the change |
| Mission and strategy | Transformational | Tailoring for each client | Replaced |
| Leadership | Transformational | New GM; low confidence in follow-through | Must lead it |
| Culture | Transformational | Custom-build assumption; cross-cultural friction | Deeply |
| Structure | Transactional | Client-aligned teams | Reorganized into shared squads |
| Management practices | Transactional | Managers act as client escalation points | Shift to coaching and squad coordination |
| Systems | Transactional | Separate code bases and release process | Replaced by global pipeline |
| Work unit climate | Transactional | Strong team loyalty, low trust in HQ | Strained during migration |
| Task requirements and skills | Transactional | Custom development expertise | Configuration and platform skills needed |
| Motivation and needs | Transactional | Pride in solving client problems | At risk for consultants and senior engineers |
Note. Composite diagnosis based on survey, interview and document evidence. Individual and organizational performance, the model's outcome factors, are omitted.
Diagnostic Conclusion
All four transformational factors are involved, and every transactional factor below them will shift. One Platform is a transformation of the branch presented as a software migration. A plan limited to technical steps and training would repeat the pattern of the customer system rollout. The change model chosen must address leadership, culture and mission as well as structure and skills, and it must reach individuals whose roles change most.
Comparing Change Models
Three models were considered. The account of unfreezing, moving and refreezing offered by Lewin (1947) established that stable patterns must be loosened before change and consolidated afterward; it is clear but general. The eight steps described by Kotter (1995), from establishing urgency through anchoring new approaches in culture, sequence leadership actions for large transformations. ADKAR, developed by Hiatt (2006), tracks five stages each individual passes through: awareness, desire, knowledge, ability and reinforcement. Table 2 compares them against the branch's needs.
Table 2
Change Models Compared Against Branch Needs
| Branch need | Lewin | Kotter | ADKAR |
|---|---|---|---|
| Rebuild confidence in leadership | Implied in unfreezing | Guiding coalition and vision steps | Not addressed directly |
| Address culture and mission | Refreezing | Anchoring in culture | Limited |
| Plan for roles that change most | Not specific | Removing obstacles | Strong: stage by stage for each person |
| Sequence an 18-month program | Three broad phases | Eight steps with short-term wins | Repeated for each migration wave |
| Measure progress | Hard to measure | Milestones and wins | Individual stage assessments |
Note. Assessment by the consultant.
Recommended Approach
I recommend combining Kotter's steps at the program level with ADKAR at the level of individuals and teams. Kotter's sequence answers the diagnosis at the top of the model: it requires a guiding coalition that can repair confidence in leadership, a vision the branch can accept, short-term wins in the first client migrations and deliberate steps to anchor the change in culture. ADKAR answers the diagnosis at the bottom: it lets managers see, for each consultant and engineer, whether the obstacle is understanding, willingness, knowledge or practice, and respond accordingly. Lewin's framing will remain useful in communication, since unfreezing the custom-build assumption is the first task.
Combining models has a cost. Two frameworks can confuse managers if their language is mixed. By (2005) noted that the change management literature offers many frameworks with limited empirical evidence behind them, which argues for using models as practical guides rather than as proof. The plan will therefore use Kotter's steps as the program's structure and ADKAR only as a coaching and measurement tool for managers, with one short guide explaining how the two fit together.
Using the Diagnosis During the Program
The diagnosis should not be filed away once the plan is written. Burke-Litwin factors can serve as a checklist at each phase gate: if climate in the migrating teams deteriorates or managers keep acting as client escalation points instead of coaches, the model points upward to leadership and culture as the likely source, rather than to the teams themselves. The readiness survey will be repeated after the first migration wave, and the results will be mapped back to Table 1 so that leaders can see which factors are moving and which are stuck.
References
Burke, W. W., & Litwin, G. H. (1992). A causal model of organizational performance and change. Journal of Management, 18(3), 523-545. https://doi.org/10.1177/014920639201800306
By, R. T. (2005). Organisational change management: A critical review. Journal of Change Management, 5(4), 369-380. https://doi.org/10.1080/14697010500359250
Hiatt, J. M. (2006). ADKAR: A model for change in business, government and our community. Prosci Learning Center Publications.
Kotter, J. P. (1995). Leading change: Why transformation efforts fail. Harvard Business Review, 73(2), 59-67.
Lewin, K. (1947). Frontiers in group dynamics: Concept, method and reality in social science; social equilibria and social change. Human Relations, 1(1), 5-41. https://doi.org/10.1177/001872674700100103
What the MBA 687 Module 4 instructions ask for
The Module 4 assignment in MBA 687 usually asks you to diagnose the organization with a model and choose a change model to guide the plan. Prompts commonly ask for a diagnostic framework applied to the case, an analysis of the most important factors and a comparison of change models with a recommendation. Expect several APA 7 pages with headings for each factor. Cite the models' original sources. Apply the diagnostic model to evidence from earlier milestones, such as the readiness survey, so each factor rests on data. Weigh change models on what this change needs, not on popularity. The MBA 687 Module 4 guidelines list the models to compare and whether a combination is acceptable.
How this MBA 687 Module 4 change model diagnostic report example is built
The purpose section explains why a diagnostic model comes before a change model. The Burke-Litwin section explains its structure and why it suits a change imposed by a parent. The external environment section covers client demands and the parent's global strategy. The mission and strategy section notes the branch's unclear role after consolidation. Leadership and culture sections draw on the readiness and culture findings. Transactional factors cover structure, systems and management practices. The diagnostic conclusion names leadership and culture as the factors to address first, since systems will follow if they move. A comparison table weighs Lewin, Kotter and ADKAR, and the recommendation combines Kotter with ADKAR.
Where the MBA 687 Module 4 rubric puts the points
MBA 687 grades the diagnostic report on the application of the diagnostic model, the conclusion, the comparison of change models and the recommendation, with every MBA 687 row on SNHU's four levels. Application carries heavy weight; graders reward each factor supported by evidence from the case. The conclusion earns credit when it prioritizes. The comparison scores well when models are weighed on criteria that matter for this change, such as attention to individuals and fit with a parent-led mandate. The recommendation should follow from the diagnosis, factor by factor. Combining models is acceptable when the reason is clear, such as ADKAR's focus on individuals.
MBA 687 Module 4 help: the mistakes that cost points
Diagnostic reports often lose points by describing every Burke-Litwin factor at equal length without saying which matter most. Another common gap is a model comparison copied from a textbook without reference to the case. Some students choose a change model before diagnosing the organization at all. Others combine models without explaining why. Watch the distinction between transformational and transactional factors, which drives the model's logic, and say which group the platform change touches first. Cite Burke and Litwin's original article. Finally, prioritize, because an MBA 687 grader wants the diagnosis to tell the change leader where to start, and a report that ranks leadership and culture first gives the plan a clear starting point.
Get MBA 687 Module 4 written to your instructions
Share the MBA 687 Module 4 prompt and rubric with your organization's situation. A report that applies a diagnostic model and selects a change model comes back within 24 to 48 hours; the first one is free. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More MBA 687 papers and related MBA samples
- MBA 687 Module 1 Correspondence on a Failed Change: Why the last rollout at Veritane failed
- MBA 687 Module 2 Stakeholder Analysis Memo: Stakeholder analysis before One Platform
- MBA 687 Module 3 Milestone One Change Readiness Assessment: Readiness and culture at Veritane US
- MBA 687 Module 5 Milestone Two Change Management Plan: Draft change plan for One Platform
- MBA 687 Module 6 Strategic Considerations Presentation: Rollout waves, owners and gates
- MBA 687 Module 7 Model Leadership Behavior Memo: Behaviors leaders must model
- MBA 687 Module 8 Final Project Change Management Plan: Final change plan for Veritane US
- MKT 610 Module 9 Milestone Three: Measuring Promotional Effectiveness
- QSO 530 Module 4 Confidence Interval Assignment: What Members Think, Within a Margin
- BMB 630 Module 6 Milestone Two: Positioning and Objectives
- INT 620 Module 4 Transaction Exposure Assignment: A Kiwi Receivable and a Euro Payable
MBA 687 Module 4 questions, answered
What is MBA 687 Module 4 usually about?
Around the middle of the course, assignments commonly turn to change models: diagnosing the organization in the scenario and selecting a change management model, such as Lewin, Kotter or ADKAR, with a justification for why it fits.
What is the Burke-Litwin model?
It is a diagnostic model linking twelve organizational factors. Transformational factors, the external environment, mission and strategy, leadership and culture, require fundamental change when they shift. Transactional factors, such as structure, systems, management practices and climate, concern day-to-day operations.
Can a change plan use more than one model?
Yes. Many plans combine an organization-level model that sequences leadership actions with an individual-level model that tracks whether each person is ready and able to change. The important thing is to explain what each model contributes.
Where can I find a free MBA 687 Module 4 sample?
This page holds the full report: a Burke-Litwin diagnosis of a software branch's platform change, factor by factor, and a comparison of Lewin, Kotter and ADKAR with a recommended combination. Use it as a model.
Why combine Kotter's model with ADKAR?
Kotter's steps guide what leaders do across the organization, such as building urgency and a coalition, while ADKAR, from Prosci, tracks whether each person is ready. Using both covers the organization and the individual.