MKT 610 Module 9 Milestone Three Example

Reviewed by Portia Lambrick, MBA

This MKT 610 Module 9 Milestone Three sample plans how every promotional tool will be measured and what decisions the results will drive. SNHU MKT 610 (MKT-610) asks MS in Marketing students to build evaluation into the promotional plan rather than add it at the end. The brand is Roaring Brook birch beer from a composite Scranton bottler entering 180 supermarkets. The memo sets concept tests before production, a repeated shopper intercept, a comparison of 120 stores with the full program and 60 matched stores with less, sampling weeks against ordinary weeks, scan-back results per dollar and a test of search ads on the brand's own name, each with research behind it.

CourseMKT 610 Promotions Management
ModuleModule 9
Paper typegraduate milestone planning how each promotional tool will be evaluated, including pretesting, tracking, experiments and the decisions results will drive
LengthAbout 810 words, 4 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMS in Marketing
UpdatedOctober 2026

Free sample paper for MKT 610 Module 9

1

Memorandum

To: Roaring Brook Bottling Company leadership team

From: Marketing Manager

Date: October 13, 2026

Re: How we will measure the new-region promotional program

 

Purpose

Our new-region program spends $640,000 in its first year on advertising, sampling, coupons, trade promotion and publicity. This memo sets out how we will measure what each part achieves, so that next year's budget goes to what worked. It covers pretesting, tracking, sales evaluation, the limits of each method and the decisions results will drive.

What this page is doingStates what the memo settles.
2

Before Spending: Pretesting

Before any production money is spent, the agency's three rough concepts will go in front of a panel of 60 family shoppers recruited outside new-region stores. After one viewing, each panelist is asked to say what birch beer tastes like, to pick the Roaring Brook can out of a lineup and to rate interest in buying. A comparison panel sees only a photo of the can. The pass mark set in the creative brief applies: the chosen concept must beat the can-only panel by twenty points or more on describing the drink.

What this page is doingTests the creative work.
3

During the Year: Tracking

The six-store shopper intercept from the situation analysis will be repeated with identical questions at months six and twelve, measuring unaided and aided awareness, the ability to describe birch beer and trial. Because intercepts at only six stores carry wide margins of error, changes smaller than about ten points will be treated as noise.

What this page is doingFollows awareness and understanding.
4

Sales: Store Comparison

Gordon et al. (2019) took campaigns that had been run as true experiments and re-estimated them with the matching and regression methods most marketers use; the shortcuts usually missed the experimental answer, sometimes by a wide margin. Sales that rise after a campaign may have risen anyway with summer weather or the chain's own promotions. To separate effects, the 180 stores will be divided into two groups matched on size, location and sales in the first 20 weeks: 120 stores receive the full program, including advertising in their trading areas, sampling and cookout displays, while 60 receive only shelf signs and the chain's scan-back promotions. Weekly scan data will compare the groups across the year. The difference in cases per store per week, minus what the 60 stores show, is our best estimate of what the full program added.

What each comparison measures

ComparisonTool measuredDataReport
120 full-program stores vs. 60 signs-and-trade storesAdvertising, sampling and displays togetherWeekly scan dataMonthly, cumulative
Sampling weeks vs. non-sampling weeks in the same storesSamplingWeekly scan data for 8 weeks after each eventAfter each flight
Taster coupon redemptionsCouponClearinghouse reports by storeMonthly
Scan-back windows vs. preceding four weeksTrade promotionRegister data from the chainAfter each window
Former-resident sign-ups by ZIP codePublicity and social outreachEmail and social sign-upsMonthly
What this page is doingSeparates the program's effect from other causes.
5

After Promotions End

Pauwels et al. (2002), applying persistence modeling to weekly scanner data for a perishable and a storable product, found that permanent effects of price promotions on category incidence, brand choice and purchase quantity were virtually absent, with effects dissipating over an adjustment period. Our scan-back promotions will therefore be measured over the eight weeks after each window, not only during it, to see whether any new buyers stay. For sampling, the question is the same: do sales in sampled stores stay higher after the tables are gone?

What this page is doingMeasures what lasts.
6

Search Ads on Our Own Name

The agency has proposed paying for search ads on "Roaring Brook" and "Roaring Brook birch beer." Blake et al. (2015) switched eBay's paid search ads off and on across regions and found that paying for clicks on the eBay name itself bought essentially nothing in the short run, since those searchers clicked the unpaid result instead, while ads on other terms mostly paid off among shoppers new to the site or rarely on it. We will run brand-name search ads in half of the new region's ZIP codes for eight weeks and compare website visits and store-locator use with the other half before committing any further money.

What this page is doingTests an easy-looking expense.
7

Decision Rules

Decisions tied to results at month twelve

ResultDecision
Full-program stores at least 0.6 cases per store per week above comparison storesExtend the full program to all 180 stores in year two
Difference under 0.2 casesCut paid media by half; keep sampling and trade support
Sampled stores hold at least half their lift eight weeks laterDouble sampling events in year two
Scan-back windows show no lift after eight weeksReduce windows from four to two
Brand-name search ads show no differenceStop brand-name search ads
What this page is doingStates what results will change.
8

Limits

The store comparison cannot separate advertising from sampling in the full-program stores, since both run together; the sampling-week comparison provides a partial answer. Publicity and word of mouth spill into comparison stores and will make the program's effect look smaller than it is. And twelve months may not be long enough to show how many first-time buyers keep coming back. These limits argue for caution in reading small differences, not for skipping the measurement.

What this page is doingNotes what the plan cannot measure.
9

References

Blake, T., Nosko, C., & Tadelis, S. (2015). Consumer heterogeneity and paid search effectiveness: A large-scale field experiment. Econometrica, 83(1), 155-174. https://doi.org/10.3982/ECTA12423

Gordon, B. R., Zettelmeyer, F., Bhargava, N., & Chapsky, D. (2019). A comparison of approaches to advertising measurement: Evidence from big field experiments at Facebook. Marketing Science, 38(2), 193-225. https://doi.org/10.1287/mksc.2018.1135

Pauwels, K., Hanssens, D. M., & Siddarth, S. (2002). The long-term effects of price promotions on category incidence, brand choice, and purchase quantity. Journal of Marketing Research, 39(4), 421-439. https://doi.org/10.1509/jmkr.39.4.421.19114

What the MKT 610 Module 9 instructions ask for

Milestone Three in MKT 610 commonly asks how you will evaluate the effectiveness of your promotional program. Expect to name measures for each objective and tool, describe pretesting of creative work, tracking during the campaign and evaluation afterward, identify data sources and explain how results will be used to adjust the plan. A strong milestone does more than list metrics: it explains how the plan will separate the effect of the promotion from sales that would have happened anyway, using comparison groups, tests or before-and-after designs with controls. It also states in advance what results would lead to more spending, less spending or a change of tool, so evaluation leads to decisions.

How this MKT 610 Module 9 milestone three example is built

The sample memo plans evaluation for the composite Roaring Brook bottler's new-region program. Creative concepts are pretested with 60 target shoppers. The six-store shopper intercept is repeated at months six and twelve. Store scan data compare 120 stores receiving the full program with 60 matched stores receiving only signs and trade deals, sampling weeks are compared with ordinary weeks in the same stores and scan-back results are reported per dollar. Research on how quickly deal effects wear off, on paying for searches of a brand's own name and on why experiments beat after-the-fact estimates shapes the design, and decision rules close the memo.

Where the MKT 610 Module 9 rubric puts the points

The third MKT 610 milestone is typically graded on measures linked to each objective and tool, pretesting and tracking plans, a credible way to separate promotional effects from other causes, appropriate data sources, decision rules tied to results and research and writing. Strong submissions use comparison groups or experiments, report results per dollar spent and say in advance what will change. Weak ones list impressions, clicks and redemptions as proof of success, measure only during the promotion and not after, rely on each platform's own reports or describe evaluation without connecting it to future decisions. Acknowledging what the design cannot measure, such as spillover between store groups, adds credibility.

MKT 610 Module 9 help: the mistakes that cost points

Start from your objectives and list one or two measures for each, with a data source and timing. Plan a pretest for creative work before money is spent on production. For sales effects, find a comparison: stores, regions or periods that did not receive the promotion. Measure after promotions end as well as during them, since some effects disappear and others carry over. Report results per dollar so tools can be compared. Be skeptical of reports from the media or platforms you are paying. Write decision rules in advance: what result means spend more, keep going or stop. Agreeing on them before the data arrive keeps everyone from reading the results to suit a favorite tool. Finally, state the limits of your design honestly.

Get MKT 610 Module 9 written to your instructions

Send the MKT 610 Milestone Three guidelines and your plan's objectives and tools. We set a measure for every tool, design comparisons that separate each tool's effect from what would have happened anyway and write the decisions results will drive, with research on measurement. Your first Milestone Three is written free and usually returned in two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More MKT 610 papers and related MS in Marketing samples

MKT 610 Module 9 questions, answered

Where can I find a free MKT 610 Module 9 Milestone Three sample?

This page includes the full MKT 610 Milestone Three memo on measuring a composite birch beer brand's advertising, sampling, coupons and trade deals, with decision rules.

How do you measure the effectiveness of a promotional campaign?

Set measures for each objective, then compare results with a group, region or period that did not receive the promotion so its effect can be separated from other causes.

Do price promotions have lasting effects on sales?

Research on scanner data found that the effects of price promotions on brand sales usually fade within weeks, with permanent effects rare.

Should a brand advertise on searches for its own name?

Experiments at eBay found that ads on searches for its own brand name produced no measurable short-term benefit, since most searchers would have clicked the free listing anyway.

What is pretesting in advertising?

Testing ad concepts or rough versions with members of the target audience before production, to check that they communicate the message and to choose among options.