| Course | INT 640 International Market Strategy |
|---|---|
| Module | Module 3 |
| Paper type | graduate discussion post on institutions, legitimacy and the liability of foreignness |
| Length | About 360 words, 3 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MBA |
| Updated | October 2026 |
Free sample paper for INT 640 Module 3
Module Three Discussion
Six Weeks at the Permit Counter
Conewago Modular Systems shipped its first backyard cottage to a homeowner in a Toronto suburb in May. The unit carried its Canadian factory-housing certification and met Ontario's code on paper. It sat in our yard in Pennsylvania for six weeks while the municipality reviewed the permit. Down the street, a local builder's nearly identical cottage was approved in eight days. Our sales manager called it protectionism.
Zaheer (1995) described the liability of foreignness: costs that foreign firms bear and local firms do not, arising from unfamiliarity with the environment, missing relationships, the challenge of coordinating at a distance and, sometimes, discrimination. In our case, the municipal plans examiner had never seen a set of drawings from a Pennsylvania factory. She asked for stamped engineering letters that local builders supply as a matter of habit and that we did not know were expected. Nothing in the written code required them.
Kostova and Zaheer (1999) argued that multinationals must earn legitimacy in each new institutional setting, and that legitimacy depends on local actors understanding and accepting the firm, which takes time and evidence. Peng et al. (2008) argued that institutions, formal and informal, shape strategy alongside industry conditions and firm resources. Our strategy treated the code as the whole story. It was only the written part.
First, work through an Ontario installer whose name inspectors know, so permits arrive with familiar paperwork. Second, meet plans examiners in our target municipalities before the next sale, bringing our certification and a sample drawing set. Third, hire an Ontario-licensed engineer to stamp our drawings. Each step costs a little and buys trust.
Some delays may reflect real staffing shortages at municipal offices, which affect everyone. We should measure our approval times against local builders' over several months before drawing conclusions. If the gap closes once our drawings carry an Ontario engineer's stamp and our installer's name, it was unfamiliarity; if it persists, we would have evidence worth raising with the province's housing ministry, which has pushed municipalities to approve backyard units faster.
Where have unwritten rules slowed your employer, or one you know, in a foreign market, and what finally fixed it?
References
Kostova, T., & Zaheer, S. (1999). Organizational legitimacy under conditions of complexity: The case of the multinational enterprise. Academy of Management Review, 24(1), 64-81. https://doi.org/10.5465/amr.1999.1580441
Peng, M. W., Wang, D. Y. L., & Jiang, Y. (2008). An institution-based view of international business strategy: A focus on emerging economies. Journal of International Business Studies, 39(5), 920-936. https://doi.org/10.1057/palgrave.jibs.8400377
Zaheer, S. (1995). Overcoming the liability of foreignness. Academy of Management Journal, 38(2), 341-363. https://doi.org/10.2307/256683
What the INT 640 Module 3 instructions ask for
The institutions discussion in INT 640 usually asks how formal rules such as laws and regulations and informal ones such as norms and relationships affect a foreign company's strategy. Prompts may ask about the liability of foreignness, legitimacy, regulatory barriers or how firms adapt to institutional differences. A good MBA post analyzes a specific episode where institutions mattered, distinguishes formal rules from informal practices, uses research to explain why foreign firms face extra costs, avoids jumping to accusations of protectionism without evidence, proposes practical responses and asks peers about episodes in their own experience. A few prompts go on to ask when a firm should go along with an unwritten local practice and when it should push back.
How this INT 640 Module 3 discussion example is built
The sample follows Conewago Modular Systems' first backyard cottage in a Toronto suburb, which waits six weeks for a municipal building permit while a local builder's nearly identical unit is approved in days. The post asks whether that is protectionism. Using Zaheer's concept of the liability of foreignness, Kostova and Zaheer on how multinationals gain legitimacy in unfamiliar institutional settings and Peng, Wang and Jiang's argument that institutions shape strategy as much as industry and resources do, it concludes that the barrier is mostly unwritten: inspectors trust what they know. It proposes Canadian certification, a local installer partner and early meetings with municipal staff. A closing caution suggests measuring approval times against local builders before concluding that bias is at work.
Where the INT 640 Module 3 rubric puts the points
The institutions thread in INT 640 tends to be graded on understanding of formal and informal institutions, the fit to one real episode, the scholarship cited, fairness of judgment and what replies add for peers. The best posts explain why foreignness creates costs even without discrimination, support claims with evidence and propose responses that build legitimacy. Credit falls for treating every obstacle as protectionism, for ignoring informal norms, for generic advice to learn local laws and for skipping the literature; replies that simply concur, rather than proposing another explanation or fix, also score low. Separating unfamiliarity from discrimination, with evidence, is usually what makes a post persuasive.
INT 640 Module 3 help: the mistakes that cost points
Describe an episode where a foreign firm ran into a rule or a habit it did not expect. Separate what the formal rules required from what local people actually did. Then ask why the foreign firm was treated differently: discrimination, unfamiliarity or missing relationships. Research on the liability of foreignness and organizational legitimacy suggests that unfamiliarity and lack of local ties often explain more than overt bias. Propose specific actions that build trust, such as local certification, partners and early contact with officials. Keep the tone fair to local institutions. End by asking classmates where informal rules slowed their own employers abroad, which brings out comparable stories.
Get INT 640 Module 3 written to your instructions
Send the INT 640 Module 3 prompt and a market where rules or norms slowed a foreign firm. We separate formal barriers from unwritten ones, explain them with institutional research and propose concrete fixes, ending on a prompt that gets peers sharing their own run-ins with local rules. Turnaround is close to two days, free for a first post. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More INT 640 papers and related MBA samples
- INT 640 Module 1 Discussion: Why a Box Builder Would Cross a Border
- INT 640 Module 2 Market Opportunity Assessment: Ontario, Britain or Australia
- INT 640 Module 4 Competitor Analysis Assignment: The British Modular Makers That Failed
- INT 640 Module 5 Milestone One: Trucking Modules, Licensing Designs or Building a Factory
- INT 640 Module 6 Discussion: First In, or Second and Wiser?
- INT 640 Module 7 Marketing Program Assignment: Selling Cottages to Ontario Homeowners
- INT 640 Module 8 Milestone Two: The Financial Case for Ontario
- INT 640 Module 9 Discussion: Energy Codes, Trades and Local Expectations
- INT 640 Module 10 Final Project: The International Market Strategy
- FIN 700 Module 5 Cost of Capital Assignment: The WACC and the Target Debt Level
- BMB 515 Module 7 Discussion: What Fan Funding Can and Cannot Replace
- ACC 645 Module 6 Milestone Two: A Whistleblower and Backdated Contracts
- ACC 640 Module 8 Audit Sampling Assignment: Monetary Unit Sampling of Wholesale Receivables
INT 640 Module 3 questions, answered
Where can I find a free INT 640 Module 3 Discussion sample?
Read the full INT 640 Module 3 post on this page, about a U.S. modular builder's permit delays in Ontario and the liability of foreignness.
What is the liability of foreignness?
The extra costs foreign firms face compared with local ones, from unfamiliarity, lack of relationships, discrimination and the challenges of operating at a distance.
What is organizational legitimacy for a multinational?
Acceptance by local stakeholders, such as regulators, customers and partners, that the firm and its practices are appropriate, which foreign firms must often work to earn.
What is the institution-based view of strategy?
Peng and colleagues' argument that formal and informal institutions, alongside industry conditions and firm resources, fundamentally shape a firm's strategic choices.
How can foreign firms overcome informal barriers?
By partnering with trusted local firms, obtaining local certifications, hiring local staff, engaging regulators early and building a track record.