INT 640 Module 1 Discussion Example

Reviewed by Portia Lambrick, MBA

This INT 640 Module 1 Discussion sample asks why a company would expand abroad when its product seems built to stay home. SNHU INT 640 (INT-640), the international market strategy course in the MBA, starts with the motives for going international and what the evidence says about the payoff. The post looks at Conewago Modular Systems, a composite Pennsylvania maker of factory-built homes and backyard cottages, whose bulky product and local building codes seem to argue against expansion. It weighs housing shortages abroad against a cyclical home market, uses research on how international diversification affects performance and on entering foreign networks, and asks classmates what drove their employers' first moves abroad.

CourseINT 640 International Market Strategy
ModuleModule 1
Paper typegraduate discussion post on motives for international expansion and its link to performance
LengthAbout 350 words, 3 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMBA
UpdatedOctober 2026

Free sample paper for INT 640 Module 1

1

Module One Discussion

Houses Do Not Travel Well, Unless They Do

Conewago Modular Systems in Hanover, Pennsylvania, builds homes in a factory, in sections up to sixteen feet wide, and trucks them to building sites within about four hundred miles. Each module must meet the building code of the place where it lands. On paper, few products are less suited to international trade. Yet the company receives inquiries every month from Ontario, Britain and Australia, all short of housing.

What this page is doingA product that hates distance.
2

The pull is real. Ontario has encouraged backyard cottages, known as accessory dwelling units, to ease its housing shortage. Britain's government has promoted factory-built homes. Australian states allow secondary dwellings on many lots. The push is real too: U.S. housing starts swing with interest rates, and Conewago's sales fell by a fifth in the last downturn.

What this page is doingPull and push.
3

Hitt et al. (1997) found that international diversification improved firm performance up to a point and then reduced it as coordination costs rose. Contractor et al. (2003), studying service firms, described three stages: early expansion lowered performance as firms paid to learn, moderate expansion raised it, and very high expansion brought diminishing returns. For Conewago, that means a first market abroad will likely cost money before it makes any.

What this page is doingDoes expansion pay?
4

Johanson and Vahlne (2009) argued that the main disadvantage for a newcomer is being outside the local network of builders, suppliers, lenders and officials. Conewago knows Pennsylvania inspectors and lenders by name; it knows nobody in Ontario. Its sales team has never quoted in Canadian dollars, its engineers have never worked to a Canadian standard and its installers have never crossed the border with a module on a trailer. Each of those gaps is fixable, but each costs time and money, which is exactly what the research on early-stage expansion predicts.

What this page is doingWhat Conewago would have to learn.
5

Conewago should expand, but close to home and slowly. Ontario is within trucking range of Hanover, shares much of the North American supply chain and could be entered with a local partner who already belongs to its building network.

What this page is doingWhere I come out.
6

Was your employer's first move abroad pulled by an opportunity or pushed by trouble at home, and did that shape how it went?

What this page is doingFor classmates.
7

References

Contractor, F. J., Kundu, S. K., & Hsu, C.-C. (2003). A three-stage theory of international expansion: The link between multinationality and performance in the service sector. Journal of International Business Studies, 34(1), 5-18. https://doi.org/10.1057/palgrave.jibs.8400003

Hitt, M. A., Hoskisson, R. E., & Kim, H. (1997). International diversification: Effects on innovation and firm performance in product-diversified firms. Academy of Management Journal, 40(4), 767-798. https://doi.org/10.2307/256948

Johanson, J., & Vahlne, J.-E. (2009). The Uppsala internationalization process model revisited: From liability of foreignness to liability of outsidership. Journal of International Business Studies, 40(9), 1411-1431. https://doi.org/10.1057/jibs.2009.24

What the INT 640 Module 1 instructions ask for

The opening INT 640 discussion usually asks why companies expand internationally and whether doing so improves performance, often through an example. Prompts may ask about market-seeking, efficiency-seeking or resource-seeking motives, the risks of expansion or the relationship between internationalization and profitability. A good MBA post applies the motives to one company whose case is not obvious, separates factors pulling it abroad from those pushing it, uses research on performance rather than assuming expansion is always good, considers what the firm would have to learn and asks peers about their own employers' experience. Some versions also ask which motive is strongest for the company you chose and why.

How this INT 640 Module 1 discussion example is built

The sample examines Conewago Modular Systems, a composite Hanover, Pennsylvania, company with $240 million in sales, whose homes and backyard cottages are built in factories and trucked to sites. Housing shortages in Ontario, Britain and Australia pull it outward, and a cyclical U.S. market pushes it to diversify. The post uses Hitt, Hoskisson and Kim's finding that international diversification improves performance only up to a point, Contractor, Kundu and Hsu's three-stage pattern in which early expansion hurts before helping and Johanson and Vahlne's argument that newcomers must join local business networks, and concludes that Conewago should expand carefully and close to home first.

Where the INT 640 Module 1 rubric puts the points

First INT 640 discussions are commonly graded on understanding of expansion motives, how well the motives fit one real firm, the evidence on growth abroad, the sharpness of the judgment and the quality of exchanges with peers. Strong posts distinguish motives clearly, recognize that expansion can lower performance before raising it and connect the argument to what the company would need to learn. Marks are lost for assuming international growth is automatically good, for listing motives without a company in view, for ignoring industry-specific barriers, for absent research and for responses that endorse a classmate's plan without probing its risks. Recognizing that the first years abroad often cost money, and saying how the company could afford them, tends to impress graders.

INT 640 Module 1 help: the mistakes that cost points

Pick a company whose case for going abroad is debatable, since that makes the analysis interesting. List what pulls it outward, such as demand or shortages abroad, and what pushes it, such as a slow or volatile home market. Then look at the evidence on whether international expansion pays: research suggests a curved relationship, with early costs, later gains and eventual limits. Ask what the company would need to learn or which partners it would need, since foreign markets reward insiders. Take a position on whether and how fast to move. End by asking classmates whether their employers' first moves abroad were pulled by opportunity or pushed by trouble at home. Keep the post grounded in two or three facts about the company, such as where it sells and how far its products can travel.

Get INT 640 Module 1 written to your instructions

Send the INT 640 Module 1 prompt and a company weighing a first market abroad. We sort the push from the pull, test the case against research on international expansion and performance and end on a question your classmates can answer from their own firms. Turnaround is about two days; opening posts are free. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More INT 640 papers and related MBA samples

INT 640 Module 1 questions, answered

Where can I find a free INT 640 Module 1 Discussion sample?

Read the full INT 640 Module 1 post on this page, which asks why a Pennsylvania modular home builder might look for its first foreign market.

Why do companies expand internationally?

To find new customers, reduce dependence on one market, lower costs, gain resources or knowledge and follow customers or competitors, often in combination.

Does international expansion improve performance?

Research finds a curved relationship: early expansion often hurts performance through learning costs, moderate expansion helps and very high levels can bring diminishing returns.

What is the liability of outsidership?

Johanson and Vahlne's term for the disadvantage a firm faces when it is not part of the relevant business networks in a foreign market.

Can firms with bulky, regulated products expand abroad?

Yes, but usually by producing locally, licensing designs or entering nearby markets first, since transport costs and local regulations limit exporting.