| Course | INT 640 International Market Strategy |
|---|---|
| Module | Module 5 |
| Paper type | graduate milestone analyzing foreign market entry modes and recommending one |
| Length | About 1,010 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MBA |
| Updated | October 2026 |
Free sample paper for INT 640 Module 5
Trailer, License or Factory: Choosing How a Pennsylvania Cottage Builder Enters Ontario
[Student Name]
Southern New Hampshire University
INT 640: International Market Strategy
Milestone One: Entry Strategy Analysis
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Trailer, License or Factory: Choosing How a Pennsylvania Cottage Builder Enters Ontario
Introduction
With Ontario's backyard cottage market chosen, the question becomes how to serve it. Its competitor analysis showed that Ontario's market is fragmented, that the closest rivals are a few Ontario and Quebec modular factories and that Britain's modular failures warn against building a factory before orders exist. This milestone compares four entry modes, rates them on what that work revealed, draws on studies of how firms pick entry modes and lays out a staged path with clear triggers.
Options
Exporting means building cottages in Hanover and trucking them across the border at Buffalo, about 450 to 550 miles to the Toronto region, with an exclusive Ontario installer-dealer handling sales support, foundations, permits and setting. Licensing means granting an Ontario modular factory the right to build Conewago designs for a royalty of about 6 percent of sales, with Conewago supplying drawings, training and quality audits. A joint venture means co-owning production with that factory, perhaps half each, to build Conewago cottages in Ontario. A greenfield investment means building Conewago's own plant near Toronto, estimated at about $28 million for a facility producing up to 600 cottages a year.
Criteria
Five criteria follow from earlier work. Control over quality and brand matters because finish quality is Conewago's main point of difference. Resource commitment matters because the company has about $10 million available for international growth over three years. Cost to serve matters because transport adds about $9,000 per cottage from Hanover to Toronto, including permits, escorts and border fees. Speed matters because Ontario's market is forming now. Know-how risk matters because Conewago's factory system and designs are its advantage.
Comparison
Entry modes scored for Ontario (1 = weak, 5 = strong)
| Criterion | Weight | Export via installer-dealer | License | Joint venture | Greenfield plant |
|---|---|---|---|---|---|
| Control of quality and brand | 25 percent | 5 | 2 | 3 | 5 |
| Resource commitment (5 = low) | 25 percent | 5 | 5 | 3 | 1 |
| Cost to serve | 15 percent | 2 | 5 | 4 | 4 |
| Speed | 15 percent | 5 | 3 | 2 | 1 |
| Know-how risk (5 = low) | 20 percent | 5 | 2 | 3 | 5 |
| Weighted score | 4.55 | 3.35 | 3.00 | 3.25 |
Exporting scores highest because it keeps control and know-how at home and requires little capital, at the price of a transport cost of about $9,000 per cottage. Licensing comes second and the factory third, for opposite reasons: licensing is cheap but gives up control and know-how, and the factory gives full control but requires far more capital than Conewago can commit.
What Research Suggests
Anderson and Gatignon (1986) argued that firms should choose entry modes that balance control against resource commitment, preferring more control when the assets transferred are specific and proprietary, the environment uncertain and the risk of a partner's opportunism high. Conewago's factory system and designs are proprietary, which argues against licensing at the start. Zhao et al. (2004), in a meta-analysis of studies on ownership-based entry choices, found that asset specificity, uncertainty and cultural distance were consistently associated with higher ownership, while the effects of other factors varied. Ontario is culturally close and the uncertainty mainly concerns demand, which suggests that full ownership of production is unnecessary at first. Hennart and Park (1993) found that firms chose greenfield investment over acquisition when they had strong technological advantages to transfer, and acquisitions when they needed local capabilities quickly; for Conewago, a plant would be greenfield, but only if demand justifies one.
Recommendation
Conewago should enter Ontario by exporting finished cottages through a single exclusive installer-dealer for two years. The dealer would hold sales, permit and installation responsibilities in the Toronto and Ottawa regions, buy cottages at a wholesale price, and display two model units. Conewago would supply design support, marketing materials and warranty service, and its engineers would obtain Canadian certification for its cottage line before the first sale.
Terms
The dealer agreement should run two years with renewal by mutual agreement, grant exclusivity for defined regions only if the dealer sells at least 80 cottages in the first year, require installation to Conewago's standards with training in Pennsylvania and allow termination on six months' notice. Conewago would retain all design rights and customer data. The dealer's margin, about 18 percent of the installed price, would be set so that the installed cottage stays within a few percent of local factory competitors after transport, and both parties would review pricing every six months as exchange rates move.
Triggers
Once yearly volume tops roughly 250 units, freight bills above $2 million would make a fresh look at the mode worthwhile. At that point Conewago should consider licensing a limited range of designs to an Ontario factory under strict quality audits, or a joint venture that gives it shared control, before considering its own plant. A plant becomes sensible only above about 400 cottages a year with a stable order pipeline, the condition the British failures lacked.
Alternatives Rejected
Acquiring an existing Ontario modular factory was also considered and set aside. It would bring local relationships and capacity at once, the classic reason for acquisitions that Hennart and Park identified, but the few suitable factories are small, privately owned and priced on optimistic expectations for the backyard unit market. Buying one would commit Conewago to Ontario production before it knows whether its designs sell there, repeating in miniature the British mistake. If exporting succeeds and a joint venture partner emerges, an acquisition could become attractive later, with far better information about value.
Risks
The dealer may underperform or favor competing products; exclusivity tied to volume and the right to terminate address this. Transport costs could rise with fuel prices or new border rules; the trigger review accounts for that. A weak Canadian dollar would raise prices; Conewago could price in Canadian dollars and hedge part of the expected revenue.
Conclusion
Exporting through a strong Ontario partner gives Conewago control of its product and know-how at a commitment it can afford, while it learns whether Ontario's demand is as strong as it looks. Clear triggers for licensing, a joint venture or a plant make the entry a sequence rather than a single bet.
References
Anderson, E., & Gatignon, H. (1986). Modes of foreign entry: A transaction cost analysis and propositions. Journal of International Business Studies, 17(3), 1-26. https://doi.org/10.1057/palgrave.jibs.8490432
Hennart, J.-F., & Park, Y.-R. (1993). Greenfield vs. acquisition: The strategy of Japanese investors in the United States. Management Science, 39(9), 1054-1070. https://doi.org/10.1287/mnsc.39.9.1054
Zhao, H., Luo, Y., & Suh, T. (2004). Transaction cost determinants and ownership-based entry mode choice: A meta-analytical review. Journal of International Business Studies, 35(6), 524-544. https://doi.org/10.1057/palgrave.jibs.8400106
What the INT 640 Module 5 instructions ask for
Milestone One in INT 640 usually asks you to analyze entry mode options for a company's target market, from shipping goods across the border to licensing, alliances, buying a local firm or building from scratch, and to recommend one. Each mode is usually judged on control, money at risk, cost, speed and how well it suits both the firm and the market. A strong MBA milestone considers only realistic options, uses criteria drawn from earlier market and competitor analysis, applies transaction cost and related research, recognizes that entry can be staged and specifies terms or triggers for changing mode. Some versions also ask how the chosen mode would be financed and staffed.
How this INT 640 Module 5 milestone one example is built
The sample weighs four ways for Conewago Modular Systems to enter Ontario. Exporting finished cottages by truck through an exclusive Ontario installer-dealer requires little capital. Licensing its designs to an Ontario modular factory avoids transport but risks its know-how. A joint venture with that factory shares control. A greenfield plant near Toronto gives full control at about $28 million. Scoring each on control, commitment, cost to serve, speed and know-how risk, and applying Anderson and Gatignon, Zhao, Luo and Suh and Hennart and Park, it recommends exporting through an installer-dealer for two years, moving to a license or joint venture if annual volume passes about 250 cottages.
Where the INT 640 Module 5 rubric puts the points
Milestone One is commonly assessed on the identification and description of entry modes, the criteria and analysis used to compare them, application of entry mode research, fit with the company and market and the quality of the recommendation and its conditions, plus APA style. Exemplary work compares realistic modes on explicit criteria, explains trade-offs between control and commitment, uses research to anticipate problems and stages the entry with clear triggers. Work loses marks for listing every textbook mode, for recommending a factory without secured demand, for ignoring know-how leakage in licensing, for skipping costs and for recommendations without terms or triggers. Volume triggers for moving to a deeper commitment, stated in numbers, are the detail that most often lifts a milestone to the top band.
INT 640 Module 5 help: the mistakes that cost points
Start from your earlier findings: what did the market and competitor analysis say about demand, distance, partners and rivals? Those facts should set your criteria. List only modes the company could realistically use, and score each with a sentence of evidence. Use research on entry modes to think about control, commitment and the risk of sharing know-how. Remember that entry can be staged, beginning with low commitment and moving to more as the firm learns. Recommend a mode, then spell out the terms that protect the company and the measurable triggers that would justify the next step, such as a volume threshold. Explain why rejected options, such as an acquisition, lost, not only why the winner won.
Get INT 640 Module 5 written to your instructions
Share the INT 640 Milestone One guidelines and your target market. We set out the realistic entry modes, score them against what your earlier analysis found, apply entry research and recommend a path with the triggers for moving to the next stage. About two days; opening milestones are free. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More INT 640 papers and related MBA samples
- INT 640 Module 1 Discussion: Why a Box Builder Would Cross a Border
- INT 640 Module 2 Market Opportunity Assessment: Ontario, Britain or Australia
- INT 640 Module 3 Discussion: When the Building Code Is the Barrier
- INT 640 Module 4 Competitor Analysis Assignment: The British Modular Makers That Failed
- INT 640 Module 6 Discussion: First In, or Second and Wiser?
- INT 640 Module 7 Marketing Program Assignment: Selling Cottages to Ontario Homeowners
- INT 640 Module 8 Milestone Two: The Financial Case for Ontario
- INT 640 Module 9 Discussion: Energy Codes, Trades and Local Expectations
- INT 640 Module 10 Final Project: The International Market Strategy
- ACC 690 Module 3 Milestone One: Is the Rail Terminal a Variable Interest Entity?
- ACC 693 Module 3 Milestone One: The Digital Evidence Plan
- FIN 550 Module 5 Capital Budgeting Assignment: NPV and IRR of the Extruded Snack Line
- ACC 610 Module 7 Discussion: What IFRS Would Do Differently With Impairments
INT 640 Module 5 questions, answered
Where can I find a free INT 640 Module 5 Milestone One sample?
The full INT 640 Module 5 Milestone One paper is printed above, choosing between exporting, licensing, a joint venture or a factory for Ontario.
Which entry modes can a company use abroad?
Exporting, licensing and franchising, joint ventures, acquisitions and greenfield investments, which differ in control, commitment, risk and cost.
What is the transaction cost view of entry mode?
Anderson and Gatignon's argument that firms choose more control when assets are specific, the environment uncertain and the risk of opportunism high, balancing control against resource commitment.
When should a company build a factory abroad?
When demand is large and stable enough to fill it, transport or trade costs make exporting uneconomic and the firm can manage local operations, often after a lower-commitment start.
What is staged market entry?
Beginning with a low-commitment mode such as exporting and moving to licensing, partnerships or investment as volumes grow and the firm learns the market.