| Course | INT 640 International Market Strategy |
|---|---|
| Module | Module 2 |
| Paper type | graduate assignment assessing and ranking foreign market opportunities |
| Length | About 1,010 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MBA |
| Updated | October 2026 |
Free sample paper for INT 640 Module 2
The Biggest Prize or the Shortest Drive? Ranking Ontario, Britain and Australia for Conewago Modular Systems
[Student Name]
Southern New Hampshire University
INT 640: International Market Strategy
Market Opportunity Assessment
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
The Biggest Prize or the Shortest Drive? Ranking Ontario, Britain and Australia for Conewago Modular Systems
Introduction
The owners of the fictional Hanover company want one market outside the United States to start with. Inquiries come from Ontario, Britain and Australia, all facing housing shortages and all with governments that have promoted factory-built or backyard housing. This paper assesses the three in two stages: a broad screen on demand, policy and income, then a comparison on measures specific to modular housing. It weights the criteria openly, separates attractiveness from accessibility and recommends a first market, noting what would change the ranking.
Method
Cavusgil et al. (2004) compared two complementary approaches to preliminary market assessment, clustering countries with similar characteristics and ranking them on an index of market potential, and argued that using both gives a more reliable picture than either alone. Selection models that move in two stages, from a broad macro screen to a detailed industry comparison, help firms avoid being swayed by size alone (Gaston-Breton & Martín Martín, 2011). Research on emerging markets has also shown that general economic indicators can mislead and that industry-specific measures of demand deserve weight (Sakarya et al., 2007). This assessment follows those principles.
Stage One
All three markets pass the broad screen. Each has a recognized housing shortage, with governments setting targets for new homes; each has policies favoring factory-built construction, backyard units or both; and each has high incomes and established mortgage markets. Britain is the largest by population and annual homebuilding; Australia and Ontario are smaller but growing quickly. On a broad screen, Britain looks most attractive, simply because it builds far more homes each year than either of the others and has a government pressing for faster construction.
Stage Two
Five industry measures shape the comparison. Policy for backyard units: Ontario now permits additional residential units on most residential lots, creating a market for exactly the cottages Conewago builds; Australian states such as New South Wales allow secondary dwellings on many lots; Britain's planning system makes backyard units harder, and modular demand comes mainly from housing associations and developers. Code changes: Canada requires factory-built homes to be certified to a national standard for factory construction, which Conewago's quality system could meet with modest changes, while Britain and Australia use different structural and energy standards that would require redesign. Distance: Ontario's main markets lie within about five hundred miles of Hanover, inside the company's trucking range; Britain and Australia would require local production. Partners: Ontario has installers and site contractors familiar with modular units; Britain has manufacturers but several large ones failed recently; Australia has a fragmented industry. Lenders: Canadian banks finance backyard units through home equity, much as in the United States.
Capability Fit
The ranking must reflect what Conewago does well, not only what the markets offer. Its strength is a factory system that builds complete backyard cottages, with kitchens, bathrooms and finishes installed, in about three weeks, then sets them on a foundation in a day. That strength fits a market where homeowners buy one unit at a time and want minimal disruption, which describes Ontario's backyard unit market more closely than Britain's developer-led modular market, where buyers order hundreds of identical apartment modules. Conewago has no experience building multistory apartment blocks, the main modular product in British cities. Australia's secondary dwelling market fits its product well, but the distance makes the factory system irrelevant unless Conewago builds there. Capability fit therefore reinforces the distance advantage of Ontario.
Data
The assessment draws on provincial, national and state housing policy documents, published housing shortage estimates, trade press coverage of the modular industry in each country, interviews with two Ontario installers and one British housing association and Conewago's own freight costs to the Canadian border. Scores are judgments informed by these sources rather than precise measurements, which is why the weights and a sensitivity test are shown.
Scoring
Market scores (1 = weak, 5 = strong)
| Criterion | Weight | Ontario | Britain | Australia |
|---|---|---|---|---|
| Market size and growth | 20 percent | 3 | 5 | 3 |
| Policy fit for Conewago's products | 20 percent | 5 | 3 | 4 |
| Code changes required (5 = few) | 15 percent | 4 | 2 | 2 |
| Distance and logistics | 20 percent | 5 | 1 | 1 |
| Partners, installers and lenders | 15 percent | 4 | 3 | 3 |
| Competitive intensity (5 = light) | 10 percent | 3 | 2 | 3 |
| Weighted score | 4.10 | 2.75 | 2.65 |
Britain leads on size, but Ontario leads on almost everything that determines whether Conewago can actually serve the market. Australia is attractive on policy but far away and would need both new standards and local production.
Sensitivity
Doubling the weight on market size and halving the weight on distance, then rescaling the weights to total 100 percent, would raise Britain's score to about 3.3 but leave Ontario ahead at about 3.8. Only if Conewago were prepared to build a factory abroad, making distance irrelevant, would Britain approach Ontario, and even then policy fit and recent industry failures would weigh against it.
Risks in Ontario
Ontario's policy could change with a new provincial government, municipal approvals vary widely and local builders may resist an American competitor. Currency also matters: Conewago's costs are in dollars, so a weak Canadian dollar would make its cottages more expensive in Ontario. These risks are manageable but real and will be examined in later modules. Their combined effect is to argue for a first step that limits commitment, such as working through an established Ontario installer, rather than opening a sales office or plant before Conewago has learned how the market behaves.
Recommendation
Conewago should make Ontario its first international market, focusing on backyard cottages, with Britain as a later option through licensing or partnership once the company has learned to operate abroad and Australia set aside for now.
Conclusion
Britain is the largest prize, but Ontario is the market Conewago can reach, certify for and serve with its existing factories and partners. A first market abroad should teach the company how to operate internationally at a manageable cost, and Ontario offers that. Success there would also give Conewago credibility, certified products and cross-border experience it could later bring to a British partner.
References
Cavusgil, S. T., Kiyak, T., & Yeniyurt, S. (2004). Complementary approaches to preliminary foreign market opportunity assessment: Country clustering and country ranking. Industrial Marketing Management, 33(7), 607-617. https://doi.org/10.1016/j.indmarman.2003.10.005
Gaston-Breton, C., & Martín Martín, O. (2011). International market selection and segmentation: A two-stage model. International Marketing Review, 28(3), 267-290. https://doi.org/10.1108/02651331111132857
Sakarya, S., Eckman, M., & Hyllegard, K. H. (2007). Market selection for international expansion: Assessing opportunities in emerging markets. International Marketing Review, 24(2), 208-238. https://doi.org/10.1108/02651330710741820
What the INT 640 Module 2 instructions ask for
The market opportunity assessment in INT 640 usually asks you to evaluate several countries as potential markets for a company, using frameworks such as market potential indexes, PESTEL, CAGE or country clustering, and to recommend a priority market. Expect to gather data on market size, growth, competition, regulations and access, weight criteria and justify a ranking. A strong MBA paper chooses criteria that reflect the company's product and capabilities, combines broad indicators with industry-specific measures, explains weights and sources, recognizes that the largest market may not be the best first market and states what evidence would change the recommendation. Many instructors also want a short statement of the data sources behind each score.
How this INT 640 Module 2 market opportunity assessment example is built
The sample compares Ontario, Britain and Australia for Conewago Modular Systems' first international move. A broad screen shows all three have serious housing shortages, policy support for factory-built or backyard homes and high incomes. Industry measures separate them: Ontario permits backyard units on most residential lots and lies within trucking range of Pennsylvania; Britain offers the largest volume through housing associations but would require local production and has seen major modular firms fail; Australia allows secondary dwellings widely but is distant and uses different standards. Using Cavusgil, Kiyak and Yeniyurt, the Gaston-Breton and Martín Martín two-stage model and evidence on industry measures, it ranks Ontario first.
Where the INT 640 Module 2 rubric puts the points
Graders typically assess the market opportunity assessment on the choice and justification of criteria, quality of data, analysis of each market, transparency of weighting, the ranking and recommendation and APA style. The strongest papers combine broad and industry-specific measures, cite sources for data, show weights and sensitivity and recognize the difference between attractiveness and accessibility. Papers lose credit for ranking on population or GDP alone, for yardsticks that have nothing to do with the product, for weights kept out of sight, for overlooking what the firm can actually do and for recommendations that never say what would change the order. Scoring accessibility separately from attractiveness, and explaining the trade-off, is often what separates strong rankings from ordinary ones.
INT 640 Module 2 help: the mistakes that cost points
Start with a broad screen on factors that make any market attractive, such as demand, income and policy, then add measures specific to your industry, which usually decide the ranking. For a heavy or regulated product, distance, local standards and the availability of partners often matter more than market size. Show your sources and weights in a table, and score accessibility separately from attractiveness so readers can see the trade-off. Use research on market assessment methods to justify your approach. Test whether a different weighting changes the ranking. Close with a recommendation and the evidence that would make you revise it, such as a policy change or a partner offer. Name the evidence that would change your ranking, so the recommendation reads as reasoned rather than fixed.
Get INT 640 Module 2 written to your instructions
Upload the INT 640 Module 2 instructions and the markets your company is weighing. We screen them on broad indicators, compare them on measures that matter in your industry, rank them with visible weights and explain what would change the order. Usually ready in two days; a first assignment is on us. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More INT 640 papers and related MBA samples
- INT 640 Module 1 Discussion: Why a Box Builder Would Cross a Border
- INT 640 Module 3 Discussion: When the Building Code Is the Barrier
- INT 640 Module 4 Competitor Analysis Assignment: The British Modular Makers That Failed
- INT 640 Module 5 Milestone One: Trucking Modules, Licensing Designs or Building a Factory
- INT 640 Module 6 Discussion: First In, or Second and Wiser?
- INT 640 Module 7 Marketing Program Assignment: Selling Cottages to Ontario Homeowners
- INT 640 Module 8 Milestone Two: The Financial Case for Ontario
- INT 640 Module 9 Discussion: Energy Codes, Trades and Local Expectations
- INT 640 Module 10 Final Project: The International Market Strategy
- BMB 630 Module 5 Media Mix Assignment: Owned, Earned and Paid Media for a Fall Season
- FIN 700 Module 9 Milestone Three: The Draft Recommendation and Plan
- ACC 692 Module 9 Milestone Three: Preparing to Testify as an Expert
- FIN 691 Module 2 Model Design Assignment: Structure and Clinic-Level Revenue Drivers
INT 640 Module 2 questions, answered
Where can I find a free INT 640 Module 2 Market Opportunity Assessment sample?
This page shows the full INT 640 Module 2 assessment, ranking Ontario, Britain and Australia for a Pennsylvania modular home builder.
How do you assess foreign market opportunities?
Screen countries on broad indicators such as demand and income, then compare finalists on industry-specific measures, weighting criteria explicitly and testing the ranking's sensitivity.
What is country clustering in market assessment?
Grouping countries with similar characteristics, such as income or culture, so a firm can apply similar strategies within a cluster and compare clusters.
Why is the largest market not always the best first market?
Because accessibility, regulations, distance, competition and the firm's ability to serve it may matter more for success than size.
What is the difference between market attractiveness and accessibility?
Attractiveness reflects demand and profit potential; accessibility reflects how easily and cheaply a firm can reach and serve the market.