FIN 691 Module 2 Model Design Assignment Example

Reviewed by Portia Lambrick, MBA

This FIN 691 Module 2 Model Design Assignment sample plans the structure of a financial model and builds its revenue forecast from operating drivers instead of a single growth rate. SNHU FIN 691 (FIN-691) assigns this design work in Module Two of its MS Finance course on financial modeling. For the composite Mesquite Ridge Dental Partners, a 38-clinic dental group being studied for a buyout, the paper lays out the workbook's sheets and flow, defines revenue as clinics times patient visits times revenue per visit by payer, adds capacity limits from dental chairs and staff, explains how growth splits into volume and price and sets conventions that keep the model readable.

CourseFIN 691 Financial Modeling
ModuleModule 2
Paper typegraduate assignment designing a financial model and its revenue drivers
LengthAbout 1,010 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMS Finance
UpdatedOctober 2026

Free sample paper for FIN 691 Module 2

1

Model Architecture and Revenue Drivers for the Mesquite Ridge Buyout Model

[Student Name]

Southern New Hampshire University

FIN 691: Financial Modeling

Module Two Assignment

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingMesquite Ridge is an invented teaching case; operating figures are illustrative assumptions used throughout the course model.
2

Model Architecture and Revenue Drivers for the Mesquite Ridge Buyout Model

Introduction

A buyout model for Mesquite Ridge Dental Partners will eventually produce a price, a debt structure and an estimate of returns. Every one of those outputs depends on how the model is organized and on the revenue drivers at its base. This paper designs the workbook and builds the revenue logic before any statement is linked.

What this page is doingDesign before building.
3

Workbook Structure

The model will have nine sheets, flowing in one direction. An inputs sheet holds every assumption, each labeled with its source and date. A clinic operations sheet turns those inputs into visits, revenue and clinic-level costs by year. The three financial statements each get their own sheet, followed by a debt schedule, a valuation sheet, a returns sheet for the buyout and a checks sheet that gathers every test in one place. No sheet pulls from a sheet that comes after it except the debt schedule's interest, which the circularity discussion in Module Four will address.

What this page is doingSheets and flow.
4

Revenue Drivers

A dental clinic earns money by treating patients in chairs staffed by dentists and hygienists. Revenue is therefore modeled as the number of clinics, times patient visits per clinic, times revenue per visit.

Clinics. Mesquite Ridge has 38 clinics. The model adds clinics in two ways: new clinics opened from scratch, about two a year, and acquired practices, about four a year in the buyout plan, each entering with its own visit and revenue history.

Visits per clinic. A mature clinic averages about 14,500 patient visits a year: eight chairs, about 250 operating days and roughly seven visits per chair per day across hygiene and treatment. New clinics start near 60 percent of mature volume and reach maturity over three years.

Revenue per visit. Revenue per visit averages about $345 but depends on payer mix. Commercial dental insurance, about 62 percent of visits, pays the most; Medicaid, about 18 percent, pays the least; self-pay and membership plans, about 20 percent, fall in between. The model holds revenue per visit separately for each payer, so a shift in mix flows through automatically.

Checking the build: 38 clinics times 14,500 visits times $345 gives about $190 million, matching last year's revenue.

What this page is doingHow a dental clinic earns money.
5

Capacity and Staffing Limits

Visits per clinic cannot rise indefinitely. With eight chairs and current hours, a clinic tops out near 16,500 visits, so the model caps same-clinic visit growth at that level unless an input extends hours. New clinics require at least two dentists and three hygienists each; the hiring input limits openings if the company cannot recruit, a real constraint in a tight market for dental staff. These limits make the model honest when growth assumptions are changed.

What this page is doingWhat growth cannot exceed.
6

Growth Assumptions

Same-clinic revenue has grown about 5 percent a year, roughly 2 percent from more visits and 3 percent from higher fees and a shift toward commercial insurance. The model keeps these separate, because they respond to different risks: visits to local population growth and competition, price to insurers' fee schedules. Chan et al. (2003) found that high growth rates rarely persist, and Fama and French (2000) found that profitability reverts toward the mean, so the base case fades same-clinic growth toward 3.5 percent by year five rather than extending the recent rate.

What this page is doingSplitting volume from price.
7

Cost Drivers

Clinic labor, about 45 percent of revenue, is modeled from staff counts and wages, not as a percentage, because wages and productivity move separately. Supplies and lab fees are modeled per visit. Rent is fixed per clinic. Corporate overhead is modeled as a fixed amount growing with inflation plus a step-up per ten clinics added. Gondi and Song (2019) note that private equity investment in health care delivery has grown rapidly and that its effects on prices, staffing and quality are still being studied, which is a reason to keep staffing drivers explicit and visible.

What this page is doingThe first layer.
8

Testing the Drivers Against History

Before the drivers are used to forecast, they must explain the last three years. The clinic operations sheet will rebuild 2023, 2024 and 2025 revenue from the actual clinic count, visit logs and payer mix, and compare the result with reported revenue. If the rebuild misses by more than about 1 percent in any year, a driver is wrong or missing, perhaps a clinic that closed for renovation or a change in a Medicaid fee schedule. The same test applies to labor: staff counts times average wages should come within a few percent of reported clinic payroll. This back-test is the single best defense against a model that looks plausible but rests on the wrong mechanics, and it gives the investment committee a reason to trust the forecast.

What this page is doingDoes the build explain the past?
9

Sensitivity Hooks

The design also anticipates the questions the committee will ask. Every driver that matters, visits per clinic, revenue per visit by payer, wage growth, new clinics per year and acquired practices per year, is held as a single input that scenario switches on the inputs sheet can change. That way, the downside, base and upside cases in later modules change only inputs, never formulas, and a data table can show how returns move with any two drivers at once.

What this page is doingBuilding for the questions to come.
10

Conventions

Color follows the usual banking convention: blue for typed inputs, black for calculations and green for any cell pulling from another sheet. Signs are consistent: costs negative, cash outflows negative. Units are stated in every row label, thousands or millions, visits or dollars, so that no one adds visits to dollars by accident. Each row has one formula copied across all years. Every input has a label, unit and source. Files are saved with the date and version in the name, and a change log on the inputs sheet records what changed and why.

What this page is doingKeeping the model readable.
11

Conclusion

The model will flow from one inputs sheet through clinic operations to the statements, debt, valuation, returns and checks. Revenue is built from clinics, visits and revenue per visit by payer, with chair and staffing limits, and growth is split into volume and price with a fade toward lower rates. This structure gives every later module a reliable base.

What this page is doingThe design in brief.
12

References

Chan, L. K. C., Karceski, J., & Lakonishok, J. (2003). The level and persistence of growth rates. The Journal of Finance, 58(2), 643-684. https://doi.org/10.1111/1540-6261.00540

Fama, E. F., & French, K. R. (2000). Forecasting profitability and earnings. The Journal of Business, 73(2), 161-175. https://doi.org/10.1086/209638

Gondi, S., & Song, Z. (2019). Potential implications of private equity investments in health care delivery. JAMA, 321(11), 1047-1048. https://doi.org/10.1001/jama.2019.1077

What the FIN 691 Module 2 instructions ask for

The Module Two assignment in FIN 691 typically asks you to design the structure of the course model and build its core forecast drivers. Expect to plan the sheets and how information flows between them, separate inputs from calculations and outputs, choose the drivers for revenue and major costs, explain why each driver fits the business and set conventions for formatting, naming and versions. Many versions ask you to show a first-year revenue build. A strong submission bases drivers on how the business actually earns money, includes capacity constraints, shows how each driver can be tested and explains how the structure will support the statements and valuations to come.

How this FIN 691 Module 2 model design assignment example is built

The sample plans a workbook with sheets for inputs, clinic operations, income statement, balance sheet, cash flow, debt, valuation, returns and checks, flowing in one direction from inputs to outputs. Revenue is built from three drivers: the number of clinics, patient visits per clinic, about 14,500 a year, and revenue per visit, about $345, which itself depends on payer mix across commercial insurance, Medicaid and self-pay. Each clinic has eight chairs, which caps visits unless hours are extended, and dentist and hygienist hiring limits growth in new clinics. Same-clinic growth of about 5 percent is split into about 2 percent more visits and 3 percent higher revenue per visit. Conventions cover colors, named ranges and dated versions.

Where the FIN 691 Module 2 rubric puts the points

Design papers like this one earn credit for a logical workbook structure, the choice and justification of drivers, the treatment of capacity and other constraints, the quality of conventions and documentation and the link to later work. High-scoring papers explain the flow of information, build revenue from units and prices tied to how the business operates, show where constraints bind and set clear formatting and version rules. Points come off for revenue grown at a single rate, for structures that mix inputs into calculation sheets, for drivers that cannot be checked against data and for designs that will not support the full statements.

FIN 691 Module 2 help: the mistakes that cost points

The most valuable step in model design is choosing drivers that match how the business earns money. For a service business, that usually means locations or staff, the volume each can handle and the price per unit, broken down where mix matters. Ask what limits growth, chairs, staff, permits, and build those limits in, because a model without constraints will happily forecast impossible volumes. Keep inputs on one sheet, calculations elsewhere and outputs at the end, flowing in one direction. Decide your conventions before you build: colors for inputs and formulas, how sheets are named and how versions are saved. Then show a first-year revenue build that ties to last year's actual figure.

Get FIN 691 Module 2 written to your instructions

Send the FIN 691 Module 2 directions and what you know about the business you are modeling. We lay out the workbook, build revenue from operating drivers with real capacity limits and set the conventions that keep the model auditable. About two days; your first assignment is free. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More FIN 691 papers and related MS Finance samples

FIN 691 Module 2 questions, answered

Where can I find a free FIN 691 Module 2 Model Design sample?

This page has the full FIN 691 Module 2 paper, designing a buyout model's structure and building revenue from clinics, visits, payer mix and price.

What is a driver-based forecast?

A forecast that builds revenue and costs from operating quantities and prices, such as locations, customers and price per unit, rather than applying a single growth rate.

Why include capacity constraints in a model?

Because volume cannot grow beyond what facilities and staff can deliver, and a model without limits can forecast results that are physically impossible.

How should a financial model workbook be organized?

With inputs on their own sheet, calculations on separate sheets and outputs at the end, flowing in one direction so that changes in inputs update everything consistently.

What formatting conventions do modelers use?

Commonly, blue for hard-coded inputs, black for formulas and green for links to other sheets, along with consistent sign conventions, labels and dated file versions.