| Course | FIN 691 Financial Modeling |
|---|---|
| Module | Module 8 |
| Paper type | graduate assignment modeling add-on acquisitions |
| Length | About 1,000 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MS Finance |
| Updated | October 2026 |
Free sample paper for FIN 691 Module 8
Add-On Practice Acquisition Template for Mesquite Ridge Dental Partners
[Student Name]
Southern New Hampshire University
FIN 691: Financial Modeling
Module Eight Assignment
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Add-On Practice Acquisition Template for Mesquite Ridge Dental Partners
Introduction
Milestone Two showed that much of the buyout's return depends on buying small practices at about 6 times EBITDA and valuing them within the group at 11 times. The model treated each add-on as a block of EBITDA. This assignment opens one block and models a typical practice in detail, so the assumptions behind the plan can be tested and reused for each deal.
The Target
The template practice has one owner-dentist, two associate hygienists, five chairs and about 10,400 patient visits a year at about $345 each, for revenue of about $3.6 million. Its EBITDA is about $0.9 million, a 25 percent margin that reflects the owner taking a salary below what Mesquite Ridge would pay a replacement dentist; the template therefore adjusts EBITDA downward by $120,000 to a normalized $780,000 after the owner's pay is set at market. That adjustment matters: at 6 times, it is worth $720,000 of price, more than the integration budget.
Price and Funding
The price is about 6 times the normalized EBITDA plus a premium the seller negotiates, about $5.4 million in total. Eighty percent, about $4.3 million, is paid in cash drawn on the delayed-draw facility. Twenty percent, about $1.1 million, is paid in Mesquite Ridge equity, so the selling dentist owns a small stake in the group and gains if it sells for more later. One-third of the cash portion is deferred and paid only if the dentist stays and the practice's revenue holds for three years.
Synergies
Two gains are modeled. Purchasing: the group buys supplies and lab work at lower prices, saving about 2 percent of revenue, about $72,000 a year. Insurer contracts: the group's negotiated fee schedules pay about 3 percent more for the same procedures, adding about $108,000 a year. Together they add about $180,000 a year of EBITDA, phased in at 25 percent in the first six months, 75 percent by month twelve and fully by month eighteen, because insurer credentialing and supply conversions take time. Integration costs, including software conversion, signage, training and legal work, are about $150,000 in the first year, charged when incurred rather than spread over later years.
Value Creation
With synergies fully captured, the practice's EBITDA is about $960,000 after normalization. At the platform's 11 times multiple, it would be worth about $10.6 million, or about $11.9 million on the unadjusted $1.08 million basis the seller's broker presents. Against a price of about $5.4 million plus $150,000 of integration cost, the apparent gain is $5 million to $6.5 million per practice. Moeller et al. (2004) found that smaller acquirers earned better announcement returns from acquisitions than large ones, and Andrade et al. (2001) found that acquisitions on average create value for the combined firms but that targets capture most of it; in this plan, the buyer's gain depends on paying a small-company multiple.
The Risk That Undoes It
In dentistry, patients are loyal to their dentist. If the selling dentist leaves within two years, the template assumes a quarter of revenue follows, cutting EBITDA by about $360,000 after variable costs. Experience in dental roll-ups suggests perhaps a 30 percent chance of such a departure without retention terms. Weighting that outcome, the practice's expected value within the group falls by more than $1 million. The deferred third of the cash price and the equity rollover lower the chance of departure and, if it happens, lower the price paid. Gondi and Song (2019) note that private equity's growing role in health care delivery raises questions about how ownership changes affect clinicians and patients; keeping the treating dentist is good practice for patients as well as for value.
Diligence Checks
The template's inputs come from the seller's records, so each one gets a diligence test. Revenue is rebuilt from the practice management system's visit and payment records for three years, not from the tax return alone, and compared with bank deposits. Insurer mix is checked against remittance files, since a practice heavy in a low-paying plan will gain less from the group's fee schedules. Accounts receivable are aged, because old insurer balances are often uncollectible. The owner's compensation, including personal expenses run through the practice, is normalized line by line. Equipment age matters too: a practice whose imaging equipment needs replacing within two years carries a hidden capital cost of $150,000 or more. Each finding adjusts the template, and the price is renegotiated if normalized EBITDA comes in below the broker's figure. A short call with the practice's two largest referral sources, usually orthodontists or oral surgeons, also tests whether patient flow depends on the selling dentist personally.
Sensitivity of One Deal
Running the template across its key inputs shows that retention dominates. Changing the probability of the dentist leaving from 30 to 50 percent lowers the expected value by about $800,000; halving the synergies lowers it by about $1 million; a half-turn higher purchase multiple costs about $390,000. Integration costs barely matter, because they are paid once while the other effects are capitalized at the platform's multiple. The lesson for the deal team is to spend negotiation effort on retention terms and synergy evidence rather than on shaving the price.
Linking the Template
In the buyout model, each year's four add-ons are now built from the template rather than a single EBITDA number. Each carries its own price, synergy timing, integration cost and retention outcome, which the simulation in Module Seven can vary. With synergies phased and the retention risk weighted, the plan's five-year EBITDA falls by about $1.8 million compared with Milestone Two, and the base-case IRR by a little over one percentage point.
Conclusion
A typical practice bought at 6 times EBITDA can be worth nearly twice its price inside the group once synergies are captured, but only if the dentist stays. The template phases synergies, charges integration costs, normalizes the owner's pay and ties part of the price to retention. Those adjustments reduce the buyout's projected return modestly while making it far more believable.
References
Andrade, G., Mitchell, M., & Stafford, E. (2001). New evidence and perspectives on mergers. Journal of Economic Perspectives, 15(2), 103-120. https://doi.org/10.1257/jep.15.2.103
Gondi, S., & Song, Z. (2019). Potential implications of private equity investments in health care delivery. JAMA, 321(11), 1047-1048. https://doi.org/10.1001/jama.2019.1077
Moeller, S. B., Schlingemann, F. P., & Stulz, R. M. (2004). Firm size and the gains from acquisitions. Journal of Financial Economics, 73(2), 201-228. https://doi.org/10.1016/j.jfineco.2003.07.002
What the FIN 691 Module 8 instructions ask for
The Module Eight assignment in FIN 691 typically asks you to model an acquisition, often an add-on to the platform company, and integrate it with the main model. Expect to set the purchase price and how it is funded, project the target's stand-alone results, add synergies and integration costs with realistic timing, evaluate the deal's effect on the combined company's EBITDA, debt and value and identify the risks that could undo it. Many versions ask for an accretion or value-creation analysis. A strong submission builds a reusable template, phases synergies in rather than assuming them at once, includes the costs of capturing them, quantifies the main risk with a probability or scenario and shows how the template rolls into the buyout returns.
How this FIN 691 Module 8 acquisition modeling assignment example is built
The sample models a typical add-on: a one-dentist practice with $3.6 million of revenue and $0.9 million of EBITDA bought for 6 times EBITDA, about $5.4 million, with 20 percent paid in Mesquite Ridge equity so the selling dentist shares the upside. Joining the group raises EBITDA by about $180,000 a year from cheaper supplies and better insurer fee schedules, phased in over eighteen months, at an integration cost of about $150,000. At the platform's 11 times multiple, the practice with synergies is worth about $11.9 million. But if the selling dentist leaves within two years and a quarter of revenue follows, EBITDA falls by about $360,000; with a 30 percent chance of that outcome, the expected value drops to about $10.7 million. The paper ties a third of the price to the dentist staying for three years.
Where the FIN 691 Module 8 rubric puts the points
Acquisition papers like this one earn their marks on the soundness of the purchase price and funding, the realism of stand-alone and synergy projections, the inclusion of integration costs and timing, the treatment of key risks, the integration with the main model and the clarity of the value-creation analysis. Strong papers phase synergies, show integration costs explicitly, quantify retention or customer risk and show how the deal affects the combined debt and returns. Points come off for synergies assumed immediately and fully, for ignoring integration costs, for treating the gap between purchase and platform multiples as pure profit and for templates that do not connect to the main model.
FIN 691 Module 8 help: the mistakes that cost points
The most common mistake in add-on modeling is to treat the difference between the price paid and the platform's multiple as free value. That gap exists for reasons: small companies depend on key people, have less stable revenue and cost money to integrate. Model those reasons. Phase synergies in over a realistic period and charge the costs of capturing them. Identify the one risk most likely to undo the deal, often the departure of an owner or key customer, give it a probability and impact, and show the expected value. Then design terms that reduce it, such as rollover equity or earnouts. Finally, build the template so that each add-on in the main model uses it, rather than a single average number.
Get FIN 691 Module 8 written to your instructions
Send the FIN 691 Module 8 directions and the deal terms in your case. We build an acquisition template with price, synergies, integration costs and retention terms, weight the key risks and link it into your main model. Typically two days; your first assignment is free. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More FIN 691 papers and related MS Finance samples
- FIN 691 Module 1 Discussion: What Makes a Model Worth Trusting
- FIN 691 Module 2 Model Design Assignment: Structure and Clinic-Level Revenue Drivers
- FIN 691 Module 3 Milestone One: A Linked Three-Statement Model
- FIN 691 Module 4 Discussion: Circular References in the Debt Schedule
- FIN 691 Module 5 Valuation Assignment: A DCF With Its Sensitivity Tables
- FIN 691 Module 6 Milestone Two: The Leveraged Buyout Model
- FIN 691 Module 7 Discussion: Scenarios or Monte Carlo?
- FIN 691 Module 9 Milestone Three: Reviewing and Stress-Testing the Model
- FIN 691 Module 10 Final Project: The Memo to the Investment Committee
- BMB 670 Module 6 Milestone Two: Safety, Fees and Sponsors
- BMB 630 Module 5 Media Mix Assignment: Owned, Earned and Paid Media for a Fall Season
- FIN 640 Module 7 Discussion: Should a Health System Invest in Tobacco and Vaping Makers?
- FIN 610 Module 9 Milestone Three: A Liquidity Plan and the Bank Relationship
FIN 691 Module 8 questions, answered
Where can I find a free FIN 691 Module 8 Acquisition Modeling sample?
This page has the complete FIN 691 Module 8 paper, modeling one dental practice add-on with price, synergies, integration costs and retention risk.
What is an add-on acquisition?
A smaller company bought by a platform company that a private equity firm already owns, usually to grow the platform and capture cost or revenue benefits.
What is multiple arbitrage in roll-ups?
Buying small companies at low valuation multiples and having them valued at the larger platform's higher multiple once combined.
What is an equity rollover in an acquisition?
Part of the purchase price paid in shares of the buyer instead of cash, so the seller keeps a stake and has a reason to help the business succeed.
Why phase synergies in an acquisition model?
Because savings and revenue gains take time to capture through contract changes, system conversions and staff training, and assuming them immediately overstates early value.