| Course | FIN 610 Short-Term Financial Management |
|---|---|
| Module | Module 9 |
| Paper type | graduate milestone designing a liquidity plan |
| Length | About 1,000 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MS Finance |
| Updated | October 2026 |
Free sample paper for FIN 610 Module 9
Keeping the Season Funded: A Liquidity Plan for Rappahannock
[Student Name]
Southern New Hampshire University
FIN 610: Short-Term Financial Management
Milestone Three
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Keeping the Season Funded: A Liquidity Plan for Rappahannock
Introduction
The earlier modules measured Rappahannock's cash needs, set policies that roughly halve its spring borrowing and compared financing sources. This milestone turns those results into a plan the treasurer can run each week: how much cash to hold, how much credit to keep, how to see trouble coming and what to do about it.
The Cash Floor
Rappahannock pays about $1.2 million of fixed costs a month, including payroll every two weeks, and its supplier payments in spring run above $2 million every two weeks. A floor of $1.5 million covers about two weeks of payroll and the most urgent supplier payments even if a large customer payment is late. Below that level, the company draws on its line. Above it, surplus cash is moved to the short-term investments described in Module Seven.
The Credit Line
Under the new policies, peak borrowing is expected to be about $3.7 million in May, and a bad spring combining slower builder payments with a late season could push it to about $5 million. A $10 million line covers twice the bad-case peak. Trimming the commitment by a third lowers the yearly charge on undrawn capacity by roughly $12,500. The company should seek a three-year term, so that the line cannot be withdrawn at an annual renewal in a weak year.
The bank's draft covenants require cash earnings to cover fixed charges 1.2 times or better, total debt of no more than 3.0 times EBITDA and a 30-day period each year with no balance. In a bad year in which EBITDA fell from about $4.5 million to $3.2 million, fixed charge coverage would still be about 2.4 times and debt at the seasonal peak only about 1.6 times EBITDA. The 30-day clean-down is met each autumn by a wide margin, since under the new policies the line is clear by July and stays clear until the following February. Ivashina and Scharfstein (2010) showed that bank lending fell sharply in the 2008 crisis and that firms drew down their credit lines to secure cash, a reminder that a committed line with comfortable covenants is worth more than a larger line the bank can easily restrict.
The Rolling Forecast
The monthly cash budget is too coarse for the spring, when the line can move by $1 million in a week. From February through August, the controller will maintain a 13-week rolling forecast, updated each Monday with actual collections, the order book, scheduled supplier payments and payroll. From September through January, the forecast will be updated every other week. Each update compares the prior week's forecast with actual results, so forecasting errors are noticed and corrected. Campello et al. (2010) surveyed chief financial officers during the 2008 crisis and found that financially constrained firms cut investment and employment and drew on credit lines in anticipation of being cut off, which a reliable forecast can help a company avoid by showing in advance whether such steps are needed.
Triggers and Responses
Three measures, reviewed every Monday in season, trigger planned responses.
If the line balance passes $6 million, about 60 percent of the commitment, the treasurer delays any capital purchase not yet committed, suspends inventory buys for C items and calls the bank to discuss the outlook.
If builder receivables more than 60 days past invoice exceed 15 percent of builder balances, the credit manager stops new orders to the slowest builders until they pay and reviews their scores.
If any covenant comes within 20 percent of its limit, the chief financial officer meets the bank before the quarterly test, presents the forecast and, if needed, requests a temporary waiver while the company still has time.
Writing the responses now means they will be taken calmly, not improvised in a crisis.
Who Does What
The plan assigns each task to one person. The controller owns the weekly forecast and the comparison of forecast with actual results, and sends a one-page summary to the chief financial officer every Monday afternoon during the season. The credit manager owns builder scores, limits and the collection calendar, and reports overdue builder balances each week. The purchasing manager owns early-buy orders, the special-order list and the chemical consignment, and confirms each month that supplier discounts were taken. The chief financial officer owns the bank relationship, the covenant calculations and the decision to act on any trigger. Clear ownership matters because liquidity problems in seasonal companies usually begin as small slips in several places at once, each of which someone noticed but no one was responsible for.
The Bank Relationship
Petersen and Rajan (1994) found that close relationships with lenders increased the availability of credit to small firms, more than they lowered its price. Rappahannock's 18-year relationship with its regional bank is an asset to protect. Each January the chief financial officer will present the coming season's cash forecast and policies to the relationship manager, so the bank sees the plan before the borrowing begins. Quarterly, the company will send the covenant calculation with a short note on the season so far.
Protecting the Company's Own Deposits
Liquidity also depends on the safety of the cash the company already has. From August to January, Rappahannock holds up to about $5.5 million. Keeping that in one account at one bank would leave most of it above the federal deposit insurance limit. The plan uses an insured deposit sweep, which spreads balances across many banks so each stays insured, along with Treasury bills and a government money market fund. The operating account at the relationship bank holds only what is needed for the next two weeks of payments.
Conclusion
Rappahannock will keep a $1.5 million cash floor, renew its line at $10 million for three years with covenants that pass in a bad spring, forecast cash weekly through the season, act on three defined triggers, brief its bank before each season and keep its own surplus insured or in government securities. The plan turns the earlier analysis into weekly practice.
References
Campello, M., Graham, J. R., & Harvey, C. R. (2010). The real effects of financial constraints: Evidence from a financial crisis. Journal of Financial Economics, 97(3), 470-487. https://doi.org/10.1016/j.jfineco.2010.02.009
Ivashina, V., & Scharfstein, D. (2010). Bank lending during the financial crisis of 2008. Journal of Financial Economics, 97(3), 319-338. https://doi.org/10.1016/j.jfineco.2009.12.001
Petersen, M. A., & Rajan, R. G. (1994). The benefits of lending relationships: Evidence from small business data. The Journal of Finance, 49(1), 3-37. https://doi.org/10.1111/j.1540-6261.1994.tb04418.x
What the FIN 610 Module 9 instructions ask for
Milestone Three in FIN 610 usually asks you to bring your analysis together into a plan for managing the company's liquidity. Expect to set target cash balances, size and structure credit facilities, review covenants, describe how cash will be forecast and monitored, and explain how the company will respond if conditions worsen. Many versions also ask about banking relationships and the safety of the company's own deposits. A strong milestone links each element to the cash budget and the policies already chosen, tests the plan against a realistic bad case and gives specific numbers, thresholds, dates and responsibilities rather than general principles.
How this FIN 610 Module 9 milestone three example is built
The sample sets a $1.5 million cash floor, the level needed for two weeks of payroll and supplier payments. Because Milestone Two's policies cut the expected peak to about $3.7 million and a bad spring to about $5 million, it recommends renewing the line at $10 million instead of $15 million for three years, saving unused fees while keeping double the bad-case peak. Covenants are tested in a weak season and pass with room. A 13-week rolling forecast is updated every Monday from February through August. Three triggers, the line passing $6 million, builder receivables over 60 days above 15 percent and a covenant within 20 percent of its limit, each carry a planned response. Surplus deposits move through an insured sweep, and the bank reviews the season's forecast each January.
Where the FIN 610 Module 9 rubric puts the points
The milestone rubric commonly scores the target cash level and its justification, the sizing and terms of credit facilities, covenant analysis, the forecasting and monitoring process, contingency planning with specific triggers and responses, banking relationship and deposit safety and the integration of earlier work. High-scoring papers tie every number to the cash budget, test covenants and capacity in a bad case, define who forecasts and how often, and set triggers with actions. Points come off for a credit line sized without reference to the peak, for contingency plans without thresholds, for ignoring the safety of the company's own deposits and for plans that read like policy statements with no numbers.
FIN 610 Module 9 help: the mistakes that cost points
A liquidity plan is useful only if someone could follow it next Monday. Give each element a number and an owner: the cash floor in dollars and why, the credit line in dollars and why, the forecast's horizon, frequency and author, and the specific measures that trigger action. For contingencies, write the response in advance, such as delaying a capital purchase or drawing on the line early, so no one improvises under pressure. Test the covenants against the bad case, not just the base case. Do not forget the other side of liquidity: the company's own deposits are exposed to its bank's health, so keep balances within insured limits or in government securities.
Get FIN 610 Module 9 written to your instructions
Upload the FIN 610 Milestone Three guidelines with your cash budget and credit line terms. We set the cash floor and line size, test covenants in a bad season, build the weekly forecast and write the triggers and responses a treasurer can act on. About two days; your first milestone is free. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More FIN 610 papers and related MS Finance samples
- FIN 610 Module 1 Discussion: Why a Profitable Distributor Runs Short of Cash
- FIN 610 Module 2 Cash Budget Assignment: Twelve Months of Rappahannock's Cash
- FIN 610 Module 3 Milestone One: The Cash Conversion Cycle and Where It Can Shrink
- FIN 610 Module 4 Discussion: Should Rappahannock Loosen Credit Terms?
- FIN 610 Module 5 Inventory Assignment: EOQ, Safety Stock and the Spring Build
- FIN 610 Module 6 Milestone Two: Receivables and Payables Policy
- FIN 610 Module 7 Discussion: Where to Park the Autumn Surplus
- FIN 610 Module 8 Short-Term Financing Assignment: Revolver, Asset-Based Loan or Factoring
- FIN 610 Module 10 Final Project: Rappahannock's Short-Term Financial Plan
- MGT 600 Module 2 Resource Assessment Assignment: Cranes, People and Cash
- MKT 665 Module 2 Brand Story Audit Assignment: Brand Story Audit
- BMB 515 Module 2 Industry Structure Assignment: Three Income Streams and Where the Label Sits
- MBA 580 Module 8 Final Innovation Strategy Proposal: Connected-vehicle innovation strategy
FIN 610 Module 9 questions, answered
Where can I find a free FIN 610 Module 9 Milestone Three sample?
The complete FIN 610 Module 9 milestone is here, with a seasonal company's cash floor, credit line size, covenants, rolling forecast, triggers and bank plan.
Why do treasurers forecast cash week by week for a quarter ahead?
A rolling weekly forecast of receipts and payments for the next quarter, updated each week, used to manage liquidity more precisely than a monthly budget.
How large should a credit line be?
Large enough to cover the peak borrowing in a realistic bad case with a margin, but not so large that the company pays significant fees on capacity it will never use.
What are liquidity triggers?
Predefined measures, such as a credit line balance or overdue receivables above a set level, that prompt specific actions before a shortage becomes a crisis.
Why does a company's banking relationship matter?
A bank that knows the business and its seasonal pattern is more likely to extend credit and flexibility in a difficult year than one that sees only the numbers.