MGT 600 Module 2 Resource Assessment Assignment Example

Reviewed by Portia Lambrick, MBA

This MGT 600 Module 2 Resource Assessment Assignment sample takes inventory of an organization's resources and capabilities and asks which ones limit its choices. SNHU MGT 600 (MGT-600) asks MBA students to assess resources before planning how to use them. For Wabash Crane and Rigging, a composite Indiana crane rental company, the paper reviews the fleet, workforce, facilities, finances and reputation with data, tests which resources could sustain an advantage, separates resources from the capabilities that combine them and uses a resource management framework to find the constraint that matters most. It concludes that certified people, not cranes, limit growth.

CourseMGT 600 Resource Planning and Decision Making
ModuleModule 2
Paper typegraduate assignment assessing an organization's resources and capabilities
LengthAbout 1,030 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMBA
UpdatedOctober 2026

Free sample paper for MGT 600 Module 2

1

Steel Is Easy, Certified People Are Not: A Resource Assessment of Wabash Crane and Rigging

[Student Name]

Southern New Hampshire University

MGT 600: Resource Planning and Decision Making

Resource Assessment Assignment

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingWabash Crane and Rigging is fictional; fleet, workforce and financial figures are illustrative.
2

Steel Is Easy, Certified People Are Not: A Resource Assessment of Wabash Crane and Rigging

Introduction

Wabash Crane and Rigging's leaders disagree about how to meet rising demand for heavy lifts: buy a large crawler crane, hire operators or close the underused Toledo branch. Each proposal assumes something about what the company has and lacks. This assessment tests those assumptions. It inventories the company's physical, human, financial and organizational resources, applies three frameworks from the resource-based tradition and identifies the binding constraint that any plan must address first.

What this page is doingTaking stock before planning.
3

The Company

Wabash was founded in 1984 by a crane operator and is now run by his two children. Builders, utilities and manufacturers in northern Indiana and northwest Ohio hire its cranes together with the operators and riggers who run them. Revenue last year was $96 million, with operating cash flow of about $20 million.

What this page is doingFour branches, one family.
4

Physical Resources

Fleet by branch

BranchCranesAverage age (years)Utilization
Fort Wayne421266 percent
Indianapolis361178 percent
South Bend221458 percent
Toledo181749 percent
Total1181366 percent

The fleet includes 96 hydraulic truck and all-terrain cranes and 22 crawlers, the largest rated at 300 tons. None can make the 500-ton lifts that wind turbine nacelles require, which is why wind work goes to national rivals. Six hydraulic cranes are over twenty years old and spend a growing share of time in the shop.

What this page is doingThe fleet and yards.
5

Human Resources

Workforce

GroupEmployeesNotes
Certified crane operators132Average age 52; 31 eligible to retire within five years; 14 open seats
Riggers and oilers61Several in operator training
Mechanics48Shop at Fort Wayne; field mechanics at each branch
Permit truck drivers35Haul crawler components
Dispatch, sales and administration40Dispatch centralized in Fort Wayne
Management, safety and yard24Two safety managers

Each crane on a rental job needs a certified operator, and many heavy lifts need an oiler and riggers. With fourteen seats empty, as many as fourteen cranes cannot work on any given day even when customers want them. Overtime among operators averaged 11 hours a week last year.

What this page is doingWho can run the cranes.
6

Financial Resources

Operating cash flow of about $20 million supports roughly $9 million a year in capital spending after debt service and family distributions. An equipment credit line adds $6 million of borrowing capacity. The company's balance sheet could carry the $4.8 million crawler, but not the crawler plus six replacement cranes plus a training center in the same year.

What this page is doingCash and capacity.
7

Organizational Resources

Wabash has gone forty years without a fatal accident, a record utilities cite when they choose crane contractors for work near energized lines. It holds master service agreements with two utilities and three steel erectors. Its lift-planning engineers, three of them, produce plans for complex picks that smaller rivals buy from consultants.

What this page is doingReputation and relationships.
8

Framework One

Barney (1991) argued that only resources that are valuable, rare among competitors, costly to imitate and supported by the organization's systems can sustain an advantage. Applied to Wabash, cranes are valuable but not rare: any firm with credit can buy one. Certified, experienced operators are valuable and increasingly rare, and they take years to develop. The safety record and utility relationships are valuable, rare and hard to copy, because they were built over decades.

Resource tests

ResourceWorth something to customersScarce among rivalsSlow or costly to copyCompany set up to use it
Crane fleetYesNoNoYes
Experienced operatorsYesIncreasinglyYes, takes yearsPartly
Safety recordYesYesYesUnderused
Lift-planning engineersYesSomewhatSomewhatYes
Cash flowYesNoNoYes
What this page is doingWhich resources create advantage.
9

Framework Two

Grant (1991) separated resources, the inputs a firm owns, from capabilities, what it can do by coordinating teams of resources, and urged managers to start strategy from what the firm does well rather than from what markets look attractive. Wabash's distinctive capability is planning and executing complex lifts safely near live lines and occupied buildings, which combines engineers, experienced operators, riggers and its safety system. That capability, not any single crane, is what utilities pay for.

What this page is doingResources versus capabilities.
10

Framework Three

Sirmon et al. (2007) described managing resources as structuring the portfolio by acquiring, accumulating and divesting resources, bundling them into capabilities and putting those capabilities to work with customers. Wabash structures mainly by buying cranes and rarely by developing people; it bundles well on complex lifts; and it uses its safety record only with the two utilities that already know it.

What this page is doingManaging resources.
11

Binding Constraint

Operators limit output today and will limit it more as retirements come. A new crawler would need two certified operators and an oiler per shift, which the company could staff only by idling other cranes. Toledo's low utilization partly reflects having too few operators there, not too many cranes. The constraint means that the first dollars of any plan should go to developing operators.

What this page is doingPeople, not steel.
12

Underused Asset

The safety record could open work with other utilities and with data-center builders, who face strict insurance requirements. It is mentioned in proposals but not documented, measured or marketed. A one-page record of hours worked, incidents and complex lifts completed would make it visible to buyers.

What this page is doingThe safety record.
13

Resource Gaps by Branch

The constraint is not spread evenly. Indianapolis runs its cranes 78 percent of available hours and turns away work most weeks; its operators carry the heaviest overtime. Toledo has the oldest cranes and the lowest use, but its branch manager reports losing bids because he cannot promise an experienced operator for long jobs. South Bend and Fort Wayne sit in between. Moving cranes alone would not fix Toledo, and adding cranes alone would not fix Indianapolis; both need people first.

What this page is doingWhere constraints bite hardest.
14

Limitations

Utilization data do not show lost bids by branch, so demand at Toledo may be understated. Operator retirement eligibility does not mean operators will retire. The assessment also cannot say whether the crawler is a good investment; that requires the decision analysis to come.

What this page is doingWhat this assessment cannot settle.
15

Conclusion

Wabash's leaders have argued mainly about cranes and branches. The assessment shows that the scarce resource is certified people and the most valuable one is a safety reputation built over forty years. Any resource plan should begin by relieving the operator constraint and should use the safety record to win the work that justifies new equipment.

What this page is doingStart with the people.
16

References

Barney, J. (1991). Firm resources and sustained competitive advantage. Journal of Management, 17(1), 99-120. https://doi.org/10.1177/014920639101700108

Grant, R. M. (1991). The resource-based theory of competitive advantage: Implications for strategy formulation. California Management Review, 33(3), 114-135. https://doi.org/10.2307/41166664

Sirmon, D. G., Hitt, M. A., & Ireland, R. D. (2007). Managing firm resources in dynamic environments to create value: Looking inside the black box. Academy of Management Review, 32(1), 273-292. https://doi.org/10.5465/amr.2007.23466005

What the MGT 600 Module 2 instructions ask for

The resource assessment in MGT 600 usually asks you to evaluate an organization's tangible and intangible resources and capabilities, often in relation to a strategic problem or planning decision. Expect to inventory physical, human, financial and organizational resources, judge their strengths and weaknesses, apply a framework such as the resource-based view and identify constraints and opportunities. A strong paper uses actual figures rather than adjectives, separates resources from capabilities, judges each against the decision the organization faces and names the single constraint that most limits what it can do, since planning starts there. Some versions name a specific framework, while others leave the choice to you, so check the rubric before you start.

How this MGT 600 Module 2 resource assessment assignment example is built

The sample assesses Wabash Crane and Rigging's resources: 118 cranes averaging thirteen years old, branch utilization from 49 to 78 percent, 132 operators averaging 52 years of age with fourteen open seats, 48 mechanics, four yards, about $20 million in yearly operating cash flow and a forty-year record without a fatal accident. Using Barney's tests of value, rarity, imitability and organization, Grant's distinction between resources and capabilities and Sirmon, Hitt and Ireland's framework for structuring, bundling and deploying resources, it finds that certified operators are the binding constraint and that the heavy-lift safety record is a valuable, hard-to-copy asset the company underuses. It ends by pointing the resource plan toward operator development first.

Where the MGT 600 Module 2 rubric puts the points

Resource assessments are commonly scored on completeness of the inventory, quality of evidence, correct use of a framework, insight into constraints and opportunities and writing and APA style. The best papers quantify each resource, explain which ones matter for the decision at hand, distinguish resources from capabilities and identify a binding constraint with evidence. Marks drop for lists of strengths and weaknesses without figures, for applying a framework mechanically to every item, for treating all resources as equally important and for conclusions the data cannot support. Tables that show figures side by side, and a brief honest note on what the data cannot tell you, also earn credit.

MGT 600 Module 2 help: the mistakes that cost points

Gather numbers for every category: equipment and its age and use, people and their skills and ages, facilities, cash and borrowing capacity, reputation and relationships. Then ask which resources are valuable for the decision ahead, which are scarce and which competitors could copy easily. Separate the resources from what the organization can do with them; a crane fleet is a resource, while planning a complex lift is a capability. Look for the constraint that limits everything else, since adding more of any other resource will not help until it is relieved. End with what the assessment means for planning. Keep the conclusion short and point it toward the decision the next milestone will address.

Get MGT 600 Module 2 written to your instructions

Upload the MGT 600 Module 2 brief and tell us about the company whose resources you are reviewing. We inventory its resources with real figures, test which ones create advantage, separate resources from capabilities and find the constraint that limits its plans. The first assessment is free and back within two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More MGT 600 papers and related MBA samples

MGT 600 Module 2 questions, answered

Where can I find a free MGT 600 Module 2 Resource Assessment Assignment sample?

This page has the full MGT 600 Module 2 resource assessment of a crane company, finding that certified people are its binding constraint.

What is a resource assessment?

A structured review of an organization's physical, human, financial and organizational resources and capabilities, judged against its goals and the decisions it faces.

What is the difference between resources and capabilities?

Resources are the assets an organization holds; capabilities are what it can do by combining and coordinating those resources.

What is a binding constraint?

The resource in shortest supply relative to demand, which limits output regardless of how much of other resources is added.

Which resources can sustain a competitive advantage?

Those that are valuable, scarce, hard for rivals to copy and supported by the organization's systems, according to the resource-based view.