MGT 600 is SNHU’s Resource Planning and Decision Making course. It centers on resource planning and decision making: ill-structured problems and decision processes, resource assessment, decisions under uncertainty and forecasting bias, workforce and personnel planning, framing decisions and options, capital and budget allocation, performance measurement, goal setting and its side effects and integrated resource plans. Every module below opens a full sample paper or takes a free request for one; searches like "mgt 600 module 3", "MGT600 sample paper" and "MGT 600 milestone example" land on this page.
What MGT 600 is really about
MGT 600 is SNHU's graduate course on resource planning and decision making in the MBA and MS Management, and papers earn the most credit when a messy situation is turned into a clear decision with options, criteria and evidence rather than a list of good intentions. Strong work treats every resource, from an operator's certification to a $4.8 million crawler crane, as something with a cost, a constraint and an alternative use.
The samples follow one composite company: Wabash Crane and Rigging of Fort Wayne, Indiana, which rents cranes with operators and rigging crews to builders, utilities and manufacturers from branches in Fort Wayne, Indianapolis, South Bend and Toledo. It owns 118 mobile and crawler cranes, employs 340 people and earns $96 million a year. The company and its figures are illustrative.
What MGT 600’s modules ask for
Across ten modules, MGT 600 commonly asks for discussions on ill-structured problems, risky investments, budget allocation and goal setting, assignments on resource assessment, personnel planning and performance metrics, milestones on framing a decision and on a resource plan and a final integrated resource plan.
Where students lose points in MGT 600
MGT 600 work loses the most credit when the problem is never framed, when only one option is considered, when forecasts are taken at face value, when people are treated as a line item rather than a constraint and when goals and metrics reward the wrong behavior.
The MGT 600 drawers
MGT 600 Module 1 Discussion example
The opening MGT 600 post introduces Wabash Crane and Rigging, a Fort Wayne crane rental company that turned away $7.2 million of wind-farm and data-center work last year while its Toledo branch sat half idle, and asks why its leaders keep arguing about solutions before agreeing on the problem; it uses Simon's account of what makes a problem ill-structured, Mintzberg, Raisinghani and Théorêt's study of how unstructured decisions actually unfold and Nutt's finding that half of organizational decisions fail, often because managers rush to a single idea, and proposes three ways to frame the problem before choosing. Full sample paper, read it free.
MGT 600 Module 2 Resource Assessment Assignment example
The resource assessment takes stock of what Wabash Crane and Rigging actually has to work with: 118 cranes of uneven age and use, 132 operators with an average age of 52, 48 mechanics, four yards, $20 million in annual operating cash flow and a reputation with utilities built on forty years without a fatal accident; it applies Barney's tests of which resources can sustain an advantage, Grant's distinction between resources and the capabilities that bundle them and Sirmon, Hitt and Ireland's view of resource management as structuring, bundling and deploying, and concludes that the binding constraint is certified people, not steel, while the heavy-lift safety record is the company's most valuable and least used asset. Full sample paper, read it free.
MGT 600 Module 3 Discussion example
The buy-or-rent discussion weighs whether Wabash Crane and Rigging should spend $4.8 million on a 500-ton crawler crane, as its sales director urges with a forecast of nine busy months a year, or rent one from a national fleet at $95,000 a month; it uses Kahneman and Lovallo's account of how managers' inside view produces bold forecasts, Flyvbjerg's case for checking plans against a reference class of similar projects and Luehrman's view of strategy as a portfolio of options, notes that the company's last two crawler purchases were forecast at 75 percent use and averaged 52, and argues for renting for a season while building the operator crew and signing a wind contract that would justify buying. Full sample paper, read it free.
MGT 600 Module 4 Personnel Planning Assignment example
The personnel planning assignment builds a five-year plan to staff Wabash Crane and Rigging's cranes, which need about 72 new certified operators over five years to fill fourteen empty seats, replace 31 likely retirements and other departures and staff ten new seats; it forecasts supply and demand by year and branch, compares hiring experienced operators, developing riggers and oilers through an in-house apprenticeship and recruiting veterans, uses Boudreau and Ramstad's idea of decisive roles, Huselid's evidence that high-performance work practices lower turnover and raise productivity and Cappelli's case for balancing making and buying talent under uncertainty, and sets costs, a $1.6 million training center decision and measures. Full sample paper, read it free.
MGT 600 Module 5 Milestone One example
Milestone One frames the decision Wabash Crane and Rigging must make about heavy-lift demand over the next three years: it states the decision, sets five weighted objectives drawn from the owners and managers (profit, safety, cash risk, operator feasibility and client relationships), lays out five options from buying a 500-ton crawler now to closing Toledo, scores them, uses Keeney's value-focused thinking to create a sixth hybrid option that outscores the rest, checks the process against Hammond, Keeney and Raiffa's decision traps, such as anchoring on the sales forecast and sunk costs in the older crawlers, and applies Eisenhardt's evidence on comparing several alternatives at once. Full sample paper, read it free.
MGT 600 Module 6 Discussion example
The capital allocation discussion asks how Wabash Crane and Rigging should divide a $9 million capital budget among $11.6 million of requests, including replacing six aging cranes, a training yard, telematics and a shop upgrade and a Toledo yard expansion, when branch managers expect their usual equal shares; it uses Bardolet, Fox and Lovallo's evidence that executives spread capital too evenly across units, Graham and Harvey's survey of how financial officers actually evaluate projects and Arrfelt, Wiseman and Hult's finding that allocations driven by past performance gaps reduce efficiency, and proposes ranking projects by return and fit with the resource plan, deferring the Toledo yard and holding a reserve toward a future crawler. Full sample paper, read it free.
MGT 600 Module 7 Performance Metrics Assignment example
The performance metrics assignment redesigns how Wabash Crane and Rigging measures its four branches, which today are judged and paid on revenue alone, so that Indianapolis hoards cranes, Toledo's low use goes unexamined and nobody is rewarded for developing operators; it uses Neely, Gregory and Platts's review of how measurement systems should be designed, Kaplan and Norton's case for balancing financial and nonfinancial measures and Ittner and Larcker's warning that companies pick nonfinancial measures without testing whether they drive results, and builds a ten-measure branch scorecard covering contribution per crane, utilization, downtime, on-time arrival, safety reporting and operator development, with targets, data sources and a test of the causal links. Full sample paper, read it free.
MGT 600 Module 8 Milestone Two example
Milestone Two turns the hybrid option chosen in Milestone One into a three-year resource plan for Wabash Crane and Rigging: operator development to cut open seats from fourteen to four, crane replacements and contract-only rental of a heavy crawler, a capital split of $5.9 million with a $3.1 million reserve, a new role for Indianapolis as the heavy-lift hub and for Toledo as the industrial maintenance branch, goals set with Locke and Latham's evidence on specific, difficult goals and feedback, branch metrics and an implementation plan that answers Hrebiniak's obstacles to execution and Mankins and Steele's findings on why strategies lose value between plan and results. Full sample paper, read it free.
MGT 600 Module 9 Discussion example
The goal-setting discussion asks what Wabash Crane and Rigging should do after its new 95 percent on-time arrival goal led a South Bend dispatcher to schedule set-ups so tightly that an operator skipped part of a pre-lift ground inspection and an outrigger pad sank on a soft site; it uses Ordóñez, Schweitzer, Galinsky and Bazerman's warning that specific, challenging goals can narrow focus and invite risk taking and cheating, Schweitzer, Ordóñez and Douma's experiment showing that people who just miss a goal are more likely to misreport and Latham and Locke's advice on keeping goals' benefits while avoiding their pitfalls, and proposes making completed inspections a condition of on-time credit, giving safety a veto and reviewing every goal for conflicts. Full sample paper, read it free.
MGT 600 Module 10 Final Project example
The final project joins the course's analyses into one integrated resource plan for Wabash Crane and Rigging, a 340-person Indiana crane company that turned away $7.2 million of heavy-lift work while operator seats sat empty: it frames the ill-structured problem, sums up the resource assessment that found certified people to be the binding constraint, explains the choice of a hybrid option over buying a 500-ton crawler, sets out personnel, equipment, capital and branch allocations, goals and a scorecard with safeguards against goal side effects, a three-year financial outlook, risks and an execution plan, grounded in Simon on ill-structured problems, Barney on resources, Kahneman and Lovallo on forecasting and Locke and Latham on goals. Full sample paper, read it free.
Your classroom shows something else?
Southern New Hampshire University revises courses; module counts and deliverables shift between terms. Send what your classroom shows and the desk matches it exactly.
Using a MGT 600 sample the right way
Read an MGT 600 sample by following one question, how Wabash should meet a surge of wind and data-center work without enough operators or heavy cranes, from the first discussion and resource assessment through the personnel plan, the decision framing and the capital split to the resource plan and the final integrated plan. For MGT 600, send your organization or case and rubric; the first custom sample is free and usually takes about two days.
MGT 600 questions, answered
What does MGT 600 cover?
Resource planning and decision making: ill-structured problems, resource assessment, decisions under uncertainty, personnel planning, capital allocation, performance metrics, goal setting and integrated resource plans.
What is the MGT 600 final project?
An integrated resource plan for an organization that frames a complex problem, weighs options and sets how people, money and equipment will be allocated, with goals, metrics and a timeline.
Is the crane company in the MGT 600 samples real?
No. Wabash Crane and Rigging is fictional; its fleet, staff, projects and figures were set for teaching so the ten samples follow one organization.