MGT 600 Module 9 Discussion Example

Reviewed by Portia Lambrick, MBA

This MGT 600 Module 9 Discussion sample asks how goals that improve performance can also push people toward shortcuts, and what managers should do about it. SNHU MGT 600 (MGT-600) revisits goal setting in this MBA discussion. The post examines Wabash Crane and Rigging, a composite Indiana crane company, where a new on-time arrival goal led to rushed set-ups and a skipped inspection on a soft site. It draws on research about the side effects of specific, challenging goals, on misreporting by people who narrowly miss goals and on keeping the benefits of goals while avoiding the harms, and it proposes changes to how the goal is defined and enforced.

CourseMGT 600 Resource Planning and Decision Making
ModuleModule 9
Paper typegraduate discussion post on the side effects of goal setting
LengthAbout 360 words, 3 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMBA
UpdatedOctober 2026

Free sample paper for MGT 600 Module 9

1

Module Nine Discussion

On Time and on Soft Ground

Wabash's new branch scorecard set a 95 percent on-time arrival goal, with a share of each branch manager's bonus tied to it. Within two months, South Bend's on-time rate rose from 89 to 96 percent. Then, on a job at a warehouse site, an operator running twenty minutes behind skipped part of the pre-lift ground check. One outrigger pad sank several inches into soft fill as the crane began to lift. He stopped, nobody was hurt and the load was set down. In the review, he said, "We are not supposed to be late anymore."

What this page is doingWhat happened.
2

Specific, challenging goals usually raise performance, but they can also narrow attention to the measured outcome, push people toward risk and invite shortcuts (Ordóñez et al., 2009). Schweitzer et al. (2004) ran a laboratory task in which participants scored their own work; those who came close to a set target without reaching it inflated their scores more often than those told to do their best, and the closer they came, the more they inflated. The dispatcher's tighter schedules and the operator's skipped check fit that pattern: the goal was close, the reward was visible and the safety step was not counted.

What this page is doingWhat research warns.
3

The goal did some good. Latham and Locke (2006) argued that most goal pitfalls can be managed by designing goals well: setting learning goals where tasks are complex, resolving conflicts between goals, watching for unethical shortcuts and making sure people have the means to reach targets. Contractors noticed South Bend's better arrival times, and two asked for more work.

What this page is doingKeeping the benefit.
4

First, a job counts as on time only when the ground inspection and set-up checklist are logged in the cab tablet before the lift. Second, safety measures carry a veto: no on-time bonus in any month with a skipped inspection. Third, dispatch will add fifteen minutes to set-up times on new or soft sites. Fourth, the owners will review every scorecard goal against the others for conflicts. The operator who stopped the lift should be thanked publicly.

What this page is doingWhat I would change.
5

Which target in your workplace would someone be tempted to meet by skipping a step nobody counts?

What this page is doingFor classmates.
6

References

Latham, G. P., & Locke, E. A. (2006). Enhancing the benefits and overcoming the pitfalls of goal setting. Organizational Dynamics, 35(4), 332-340. https://doi.org/10.1016/j.orgdyn.2006.08.008

Ordóñez, L. D., Schweitzer, M. E., Galinsky, A. D., & Bazerman, M. H. (2009). Goals gone wild: The systematic side effects of overprescribing goal setting. Academy of Management Perspectives, 23(1), 6-16. https://doi.org/10.5465/amp.2009.37007999

Schweitzer, M. E., Ordóñez, L., & Douma, B. (2004). Goal setting as a motivator of unethical behavior. Academy of Management Journal, 47(3), 422-432. https://doi.org/10.2307/20159591

What the MGT 600 Module 9 instructions ask for

The goal-setting discussion in MGT 600 usually asks about the benefits and risks of performance goals and how managers should design them, sometimes through a case where a goal produced unwanted behavior. A strong post acknowledges that specific, challenging goals usually raise performance, then shows concretely how a particular goal narrowed attention or encouraged shortcuts, uses research on goal side effects, separates the goal's design from the people who responded to it and proposes changes to definitions, conditions or conflicting goals rather than simply abandoning goals. A last line that turns peers toward their own targets keeps the thread alive. Some versions ask you to reflect on a goal you were given at work, so check whether a personal example is expected.

How this MGT 600 Module 9 discussion example is built

The sample examines Wabash Crane and Rigging after its new 95 percent on-time arrival goal led a South Bend dispatcher to schedule set-ups tightly. An operator, behind schedule, skipped part of a pre-lift ground check, and an outrigger pad sank on a soft site; nobody was hurt. Using Ordóñez, Schweitzer, Galinsky and Bazerman on how goals can narrow focus and encourage risk and cheating, Schweitzer, Ordóñez and Douma's experiment on misreporting by people just short of a goal and Latham and Locke on avoiding goal pitfalls, the post proposes counting a job on time only when the inspection is logged and giving safety a veto. The post also keeps the goal itself, since contractors noticed and rewarded better arrival times.

Where the MGT 600 Module 9 rubric puts the points

Goal-setting discussions are usually graded on balanced understanding of goals' benefits and risks, use of research, application to the case, practical redesign and replies to peers. Strong posts credit goals for what they do well, show the specific mechanism by which a goal caused harm, propose redesigns that keep the benefit and avoid blaming only individuals. Points go for posts that reject goals outright, for ignoring how goals interact with each other, for remedies limited to reminders to be ethical and for replies that wave the classmate's proposal through. Instructors also value posts that credit the person who stopped the lift and treat the near miss as a lesson rather than a scandal.

MGT 600 Module 9 help: the mistakes that cost points

Begin with the goal and what it was meant to achieve, then describe the behavior it produced and why it made sense to the person under pressure. Use research to explain the mechanism, such as narrowed attention, risk taking or misreporting near a threshold. Separate design flaws from individual choices. Then redesign: define the goal so that shortcuts do not count, add conditions or limits, resolve conflicts with other goals and make sure feedback catches problems early. Stay concrete throughout. In replies, ask classmates which of their own targets could tempt someone to cut a corner. A one-sentence quote from the person under pressure often shows the mechanism better than any summary.

Get MGT 600 Module 9 written to your instructions

Post the MGT 600 Module 9 prompt and the goal or target that worries you. We trace how it shapes behavior, apply research on goal side effects and propose a redesign that keeps the benefit without the harm. Your first post is free, about two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More MGT 600 papers and related MBA samples

MGT 600 Module 9 questions, answered

Where can I find a free MGT 600 Module 9 Discussion sample?

The full MGT 600 Module 9 post is on this page, examining how an on-time goal pushed a crane crew to cut a safety check.

Can goal setting backfire?

Yes; Ordóñez and colleagues argued that specific, challenging goals can narrow focus, encourage risk taking and unethical behavior and crowd out learning and intrinsic motivation.

Why do people misreport performance near a goal?

In Schweitzer, Ordóñez and Douma's laboratory study, people who narrowly missed a precise target inflated their reported scores more often than people simply asked to do their best.

How can managers avoid the pitfalls of goals?

Latham and Locke recommended setting learning goals for complex tasks, resolving goal conflicts, monitoring for unethical shortcuts and keeping goals realistic.

Should organizations stop using performance goals?

Usually not; the better approach is to design goals carefully, define them so shortcuts do not count and watch for side effects.