Operators First, Heavy Lifts by Contract: A Three-Year Resource Plan for Wabash Crane and Rigging
[Student Name]
Southern New Hampshire University
MGT 600: Resource Planning and Decision Making
Milestone Two: Resource Plan
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Operators First, Heavy Lifts by Contract: A Three-Year Resource Plan for Wabash Crane and Rigging
Introduction
Milestone One chose a hybrid option for Wabash Crane and Rigging: train operators before anything else and bring in a rented heavy crawler solely for work already under contract. This plan turns that option into three years of allocations. It covers operators, equipment, capital and branch roles, sets goals and metrics and plans implementation, responsibilities and risks.
Operators
Operator additions, first three years
| Year | Experienced hires | Apprentices certified | Veterans | Open seats at year end |
|---|---|---|---|---|
| 1 | 10 | 0 | 2 | 13 |
| 2 | 6 | 8 | 3 | 8 |
| 3 | 4 | 10 | 3 | 2 |
Open seats barely move in the first year, from fourteen to thirteen, while retirements continue and the first apprentices train, then fall quickly as certifications begin. The apprenticeship admits twelve riggers and oilers a year from the start.
Equipment
Six hydraulic cranes over twenty years old are replaced in the first year. A 500-ton crawler is rented from a national fleet only for contracted wind and data-center lifts, staffed by Wabash's most experienced heavy-lift operators. A purchase follows only if one of two triggers is met: a multi-year contract guaranteeing two-thirds of each year's working months, or a rental season that runs past the break-even of roughly seven and a half months.
Capital
Year one capital allocation, thousands of dollars
| Use of funds | Amount |
|---|---|
| Six new hydraulic cranes to retire the oldest | 3,100 |
| Fort Wayne training yard with simulator | 1,600 |
| Crane telematics plus shop tools | 1,200 |
| Held for a possible heavy crawler | 3,100 |
| Year one total | 9,000 |
The Toledo yard expansion is deferred until utilization there exceeds 60 percent. The reserve is held in a separate account and released only by the owners when the purchase trigger is met; if it is not met by the end of year two, the reserve rolls into the following year's replacement budget.
Branch Roles
Indianapolis becomes the heavy-lift hub, hosting rented crawlers and the heavy-lift operator team, because most wind and data-center work lies within a two-hour haul of its yard. Fort Wayne houses the training yard and central shop. South Bend focuses on steel erection and general construction. Toledo concentrates on industrial maintenance work for plants and the utility, where long, steady jobs suit its smaller fleet; three of its least-used cranes move to Indianapolis for the busy season each year.
Goals
Locke and Latham (2002) drew on some four hundred studies to show that precise, demanding goals produced higher performance than vague goals such as "do your best," provided people were committed, received feedback and had the ability to reach them; for complex tasks, learning goals helped more than outcome goals at first. The plan therefore sets specific three-year goals and, for the apprenticeship, learning goals for each stage.
Three-year goals
| Goal | Baseline | Year 3 |
|---|---|---|
| Open operator seats | 14 | 4 or fewer |
| Revenue turned away for lack of operators or cranes | $7.2 million | Under $2 million |
| Company utilization | 66 percent | 72 percent |
| Heavy-lift revenue from rented crawlers | $0 | $5 million |
| Operator weekly overtime | 11 hours | Under 6 hours |
| Fatal accidents | 0 | 0 |
Metrics and Feedback
The branch scorecard provides monthly feedback on utilization, downtime, on-time arrival, safety and operator development. The owners and branch managers review it monthly, and the plan's goals are reviewed each quarter.
Implementation
Hrebiniak (2006) surveyed several hundred managers about why plans stall; they pointed most often to change that was badly handled, strategies too fuzzy to act on, nobody clearly answerable for results, information that did not flow between units and plans that cut against who held power. Mankins and Steele (2005) found that companies realized only about 63 percent of the value their strategies promised and recommended keeping plans simple and concrete, debating assumptions openly, setting clear priorities, deploying resources early and continuously monitoring performance.
Execution risks and responses
| Obstacle | Response in the plan |
|---|---|
| Unclear responsibility | Each action has a named owner |
| Too many priorities | Three priorities only: operators, crane replacement, heavy-lift rental |
| Resources arriving late | Capital approved in year one; apprenticeship starts in month one |
| Power structure | Branch bonuses changed so sharing cranes pays |
| Weak monitoring | Monthly scorecard and quarterly goal review |
Personnel Allocation by Branch
New operators will not be spread evenly. Indianapolis, the busiest branch and the new heavy-lift hub, receives the largest share of experienced hires in the first year, along with the senior operators who will run rented crawlers. Fort Wayne receives most apprentices, since the training yard is there, and sends certified apprentices to branches as seats open. South Bend and Toledo receive veterans and certified apprentices in proportion to their open seats. Senior operators who choose phased retirement will serve as mentors at Fort Wayne, keeping their experience in the company during the transition.
Budget Beyond Year One
In years two and three, capital spending returns to routine replacement of about $4 million a year, plus the crawler purchase if the trigger is met. Operating costs of the personnel plan, including apprenticeship wages, mentor stipends and retention measures, run about $900,000 a year, funded from the operating cash flow that higher utilization and fewer turned-away jobs should produce.
Responsibilities
The operations director owns the operator plan and the training yard. The finance director owns capital spending, the reserve and the rental agreements. The sales director owns heavy-lift contracts and the rental trigger. Branch managers own their scorecards. The owners chair the quarterly review.
Timeline
In year one, crane replacements arrive, telematics is installed, the apprenticeship starts, the scorecard launches and the first heavy-lift jobs are rented. In year two, the training yard opens, the first apprentices certify and the purchase trigger is reviewed. In year three, open seats fall to four or fewer and the plan is reviewed for the next period.
Risks
A construction slowdown could cut demand; the rental-first approach avoids a stranded crane, and apprentice intake can slow. Apprentices could fail certification more often than expected; extra trainees are admitted. A heavy-lift accident would threaten the safety record; heavy lifts are staffed only by the most experienced operators and planned by the company's lift engineers.
Conclusion
The plan puts money and attention first on the constraint that limits everything else, adds heavy-lift capability without betting the balance sheet, gives each branch a clear role and sets specific goals with monthly feedback. It is simple enough to execute and specific enough to check.
References
Hrebiniak, L. G. (2006). Obstacles to effective strategy implementation. Organizational Dynamics, 35(1), 12-31. https://doi.org/10.1016/j.orgdyn.2005.12.001
Locke, E. A., & Latham, G. P. (2002). Building a practically useful theory of goal setting and task motivation: A 35-year odyssey. American Psychologist, 57(9), 705-717. https://doi.org/10.1037/0003-066X.57.9.705
Mankins, M. C., & Steele, R. (2005). Turning great strategy into great performance. Harvard Business Review, 83(7), 64-72.
What the MGT 600 Module 8 instructions ask for
Milestone Two in MGT 600 usually asks you to develop a resource plan that implements the alternative chosen in Milestone One, covering personnel, budget, performance metrics and goals. Expect to allocate resources by period and unit, set goals and measures, assign responsibilities, build a timeline and address risks and implementation challenges. A strong plan shows allocations in numbers, connects each allocation to the decision's logic, sets goals that are specific and challenging with feedback built in, ties goals to metrics, anticipates the reasons plans fail in execution and gives each action an owner and a date. Many versions also ask for a budget across several years and a timeline graphic, so plan the numbers in a form that can be tabled.
How this MGT 600 Module 8 milestone two example is built
The sample builds a three-year resource plan for Wabash Crane and Rigging's hybrid option: develop operators first and rent a heavy crawler only for contracted jobs. It allocates 78 new operators over five years, starting with 29 in the first two, replaces six aging cranes, sets a $5.9 million capital split with a $3.1 million reserve, makes Indianapolis the heavy-lift hub and Toledo the industrial maintenance branch and sets goals using Locke and Latham's evidence on specific, difficult goals with feedback. Hrebiniak's obstacles to execution and Mankins and Steele's findings on lost strategic value shape a timeline, owners and quarterly reviews. Branch-level allocations show where new operators go first.
Where the MGT 600 Module 8 rubric puts the points
Milestone Two rubrics typically score the completeness and logic of resource allocations, the quality of goals and metrics, the implementation plan and responsibilities, risk management and writing and APA style. The best plans allocate in numbers by period and unit, tie every allocation to the chosen option, set specific goals with feedback, link goals to the scorecard and plan around known causes of execution failure. Marks drop for plans that restate the option without allocations, for goals that are vague or easy, for missing owners and dates and for ignoring how the plan could fail. Graders also reward plans that limit priorities to a few and explain what will not be done.
MGT 600 Module 8 help: the mistakes that cost points
Start with the option you chose and list what it requires: people, equipment, money and changes in how units work. Allocate each by year and unit, showing the numbers. Set a few specific, challenging goals, and make sure each has a measure and a regular feedback point. Assign an owner and a date to every action. Then ask why plans like yours usually fail, such as unclear responsibility, too many priorities or resources arriving late, and build answers into the plan. Finish with risks and what you will do if each happens. Show allocations by unit as well as by year, since that is where disagreements surface.
Get MGT 600 Module 8 written to your instructions
Share the MGT 600 Milestone Two guidelines and the option you chose in Milestone One. We allocate people, equipment and money across years and units, set goals and metrics and plan implementation around the usual obstacles. The first resource plan is free, ready in about two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More MGT 600 papers and related MBA samples
- MGT 600 Module 1 Discussion: Too Much Work, Too Few Operators
- MGT 600 Module 2 Resource Assessment Assignment: Cranes, People and Cash
- MGT 600 Module 3 Discussion: Buy the Big Crawler or Rent It?
- MGT 600 Module 4 Personnel Planning Assignment: Fourteen Empty Seats in the Cab
- MGT 600 Module 5 Milestone One: Framing the Decision and the Options
- MGT 600 Module 6 Discussion: Splitting the Capital Budget
- MGT 600 Module 7 Performance Metrics Assignment: What to Measure at Each Branch
- MGT 600 Module 9 Discussion: When a Goal Pushes Too Hard
- MGT 600 Module 10 Final Project: The Integrated Resource Plan
- MGT 550 Module 7 Persuasive Presentation Assignment: Asking a Hospital to Accept One Delivery a Day
- ACC 645 Module 6 Milestone Two: A Whistleblower and Backdated Contracts
- QSO 690 Module 3 Automation Assignment: A Robotic Welding Cell and the Welders
- MKT 610 Module 2 Brand and Situation Analysis Assignment: Brand and Situation Analysis
MGT 600 Module 8 questions, answered
Where can I find a free MGT 600 Module 8 Milestone Two sample?
You can read the full MGT 600 Module 8 Milestone Two here: a three-year resource plan for a crane rental company.
What is a resource plan?
A plan that allocates people, equipment and money by period and unit to carry out a chosen strategy, with goals, measures, responsibilities and a timeline.
What kinds of goals improve performance?
Locke and Latham found that specific, difficult goals led to higher performance than vague or easy goals, especially with feedback and commitment.
Why do strategies fail in execution?
Hrebiniak identified obstacles such as poor coordination, unclear responsibility, weak change management and strategies that are vague or unrealistic.
How much value do strategies lose in execution?
Mankins and Steele estimated that companies realized only about 63 percent of the financial value their strategies promised, losing much of it to poor resources and communication.