MGT 510 Module 7 Culture Integration Assignment Example

Reviewed by Portia Lambrick, MBA

This MGT 510 Module 7 Culture Integration Assignment sample designs how two organizations with different cultures should come together after a merger. SNHU MGT 510 (MGT-510) asks MBA students to apply culture research to integration. For Kennebec Casco Credit Union, a composite Maine organization formed eighteen months ago, the paper compares possible cultural end states, from keeping the cultures separate to building a new one, uses experimental and meta-analytic evidence on why cultural differences hurt mergers, selects a best-of-both approach grounded in the diagnosis and designs integration activities, rituals and a timeline that give both legacy groups a stake in the result.

CourseMGT 510 Cultivating Organizational Culture
ModuleModule 7
Paper typegraduate assignment designing the cultural integration of a merger
LengthAbout 1,020 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMBA
UpdatedOctober 2026

Free sample paper for MGT 510 Module 7

1

Best of Both, on Purpose: Designing the Cultural Integration of Kennebec Casco Credit Union

[Student Name]

Southern New Hampshire University

MGT 510: Cultivating Organizational Culture

Culture Integration Assignment

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingKennebec Casco Credit Union is fictional; plans, costs and figures are illustrative.
2

Best of Both, on Purpose: Designing the Cultural Integration of Kennebec Casco Credit Union

Introduction

Kennebec Casco Credit Union never chose how to combine its two cultures. In practice, the larger Casco Point culture has absorbed the Kennebec Valley branches through the sales goals, scorecards and promotions that followed the merger. The diagnosis showed the cost: each legacy group says sales targets now set the tone, and each would like a more cooperative workplace. This paper compares possible cultural end states, uses research on culture in combinations to choose one and designs the activities, rituals, timeline and budget to reach it.

What this page is doingIntegration by default.
3

Why Culture Clashes Hurt

Weber and Camerer (2003) created small laboratory "firms" whose members developed their own shorthand for a shared task, then merged them. Performance fell after the merger, members of each group blamed the other for the decline and participants overestimated how well the merged group would perform. Stahl and Voigt (2008) pooled findings across many merger studies and reported that cultural differences made social integration harder, though their effect on synergy and value depended on how closely the businesses had to be combined. Kennebec Casco's branches must run on one system, serve one membership and follow one set of policies, so the integration is deep and cultural differences matter a great deal.

What this page is doingResearch on combinations.
4

End States

Marks and Mirvis (2011) described cultural end states for combinations according to how much each partner's culture changes. Preservation leaves both largely intact. Absorption brings the acquired side fully into the acquirer's culture. Reverse merger does the opposite. Best of both deliberately combines strengths of each. Transformation builds a new culture that neither side had.

Comparing end states for Kennebec Casco

End stateWhat it would meanMain drawback
PreservationKennebec and Casco branches keep separate culturesMembers get two experiences under one name; policies split
AbsorptionCasco sales culture everywhere (current path)Turnover and lost loyalty among Kennebec staff and members
Reverse mergerKennebec service culture everywhereCasco staff alienated; growth habits lost
Best of bothKennebec problem-solving plus Casco measurementRequires careful choices and leadership attention
TransformationA new culture built from scratchSlow and costly; discards proven strengths
What this page is doingFive options.
5

Choice

The diagnosis supports best of both. Both groups want more clan culture and less market pressure, but former Casco staff still want results to count. From Kennebec Valley, the integrated culture keeps the norm of solving a member's problem before the member leaves, the patience that built member loyalty and the habit of knowing members by name. From Casco Point, it keeps measurement and goal-setting, the energy of daily huddles and openness to digital tools. What changes is what gets measured: member problems solved and accounts that members actually use, alongside products.

What this page is doingBest of both.
6

Design Principles

Integration will put people from both sides to work on real problems rather than relying on announcements, since shared understanding is exactly what the merged groups in the laboratory study lost, and it is rebuilt through work done together. Each legacy group will have equal representation in decisions about the new culture. And leaders will name which elements of each culture are being kept, so neither side feels its identity is simply erased.

What this page is doingHow integration will work.
7

Actions

Integration actions

ActionDescriptionTiming
Paired branchesEach former Kennebec branch paired with a Casco branch; staff spend two days a quarter working in the partner branchMonths 1-18
Joint working groupsThree groups of eight, mixed by legacy, redesign the scorecard, the member conversation guide and the new-hire programMonths 1-6
One new-hire programTwo days on member problem-solving, two days on products and digital tools, taught by trainers from both sidesFrom month 4
Shared ritualsMorning huddles open with a member story, then numbers; a quarterly award for a problem solved, chosen by peersFrom month 3
Leadership pairsEach region co-led by one manager from each legacy for the first yearMonths 1-12
What this page is doingWhat will change in daily work.
8

Rituals and Stories

Rituals carry culture. The current huddle opens with yesterday's numbers; the new one opens with a member story from the previous day, told by a teller, then reviews numbers. The bell rung when a loan closes stays, a Casco custom staff enjoy, but a second custom is added: a handwritten card to a member when a problem is solved, a Kennebec practice. Stories of good service from both sides will be collected and used in onboarding, so that new hires learn the integrated culture through examples rather than a values card. Over time, the stories new employees hear will come from the merged credit union rather than from either legacy, which is one sign that a single culture is forming.

What this page is doingBuilding shared meaning.
9

Budget

Integration budget, eighteen months

ItemCost
Paired-branch travel and coverage$140,000
Working group time and facilitation$70,000
New-hire program redesign$45,000
Rituals, awards and recognition$25,000
Integration survey and focus groups$30,000
Total$310,000

Set that against roughly $1.2 million a year that extra resignations have cost since the merger, based on 33 extra departures and an average replacement cost of about $36,000.

What this page is doingWhat integration costs.
10

Timeline

In months one to six, working groups redesign the scorecard and conversation guide, and branch pairings begin. In months seven to twelve, the new scorecard launches, the new-hire program runs and leadership pairs lead regions. The last six months bring a second culture survey, a review of which rituals have taken hold and planning for the phase after.

What this page is doingEighteen months.
11

Early Signals

Leaders will watch for fewer resignations among former Kennebec tellers, more cross-legacy applications for internal moves, falling member complaints about pressure and survey movement toward the shared target profile. A repeat survey at month twelve should show clan scores rising in both groups.

What this page is doingHow we will know it is working.
12

Risks

Former Casco staff may see best of both as a step backward, especially high performers whose recognition came from product rankings. Keeping measurement visible and inviting top Casco performers to lead working groups reduce that risk. Leaders may also drift back to the old signals under quarterly pressure, which is why the scorecard redesign comes first.

What this page is doingWhat could go wrong.
13

Conclusion

Kennebec Casco's integration has been happening by default, and the default is absorption. A deliberate best-of-both approach keeps what each side does well, lets each group see its own strengths in the outcome and changes daily work through shared tasks and rituals.

What this page is doingChoosing on purpose.
14

References

Marks, M. L., & Mirvis, P. H. (2011). A framework for the human resources role in managing culture in mergers and acquisitions. Human Resource Management, 50(6), 859-877. https://doi.org/10.1002/hrm.20445

Stahl, G. K., & Voigt, A. (2008). Do cultural differences matter in mergers and acquisitions? A tentative model and examination. Organization Science, 19(1), 160-176. https://doi.org/10.1287/orsc.1070.0270

Weber, R. A., & Camerer, C. F. (2003). Cultural conflict and merger failure: An experimental approach. Management Science, 49(4), 400-415. https://doi.org/10.1287/mnsc.49.4.400.14430

What the MGT 510 Module 7 instructions ask for

The culture integration assignment in MGT 510 usually asks you to recommend how two cultures should be combined after a merger, acquisition or reorganization, or how a subculture should be brought into the whole. Expect to assess the cultures involved, compare integration options, choose and justify one and design actions, communication and a timeline. A strong paper builds on a diagnosis rather than impressions, compares at least three options with their costs, uses research on culture in combinations, gives both groups a meaningful role and plans specific activities that change daily work, not only announcements and celebrations. Some versions frame the task as integrating an acquired team or a new department, so adapt the options to the scale of the change.

How this MGT 510 Module 7 culture integration assignment example is built

The sample designs cultural integration for Kennebec Casco Credit Union. It compares Marks and Mirvis's end states for combinations: preservation, absorption, reverse merger, best of both and transformation. Using Weber and Camerer's experiment showing that merged groups lose shared understanding and blame each other, and Stahl and Voigt's meta-analysis on cultural differences and social integration, it rejects the absorption into Casco's sales culture that has been happening by default and recommends best of both: Kennebec's problem-solving norm with Casco's habit of measuring. Actions include paired branches, joint working groups, one new-hire program and new shared rituals over eighteen months at a cost of $310,000.

Where the MGT 510 Module 7 rubric puts the points

Integration papers are commonly assessed on understanding of both cultures, the range and analysis of options, justification of the chosen approach with research, the practicality of actions and timeline and writing and APA style. The best papers show why the default path is failing, compare options openly, choose one that both groups can support and design activities that change how people work together. Credit is reduced for plans that rely on a new logo or slogan, for integration that quietly means one side wins, for missing timelines and costs and for ignoring the groups' different starting points. Graders also reward an honest account of who might resist the chosen approach and why.

MGT 510 Module 7 help: the mistakes that cost points

Start with what is happening by default; in many combinations, the larger or acquiring culture absorbs the other without anyone deciding it should. Then lay out the options: keep the cultures separate, absorb one into the other, take the best of each or build something new. For each, ask what it costs and who loses. Choose the option your diagnosis supports, and be specific about which elements of each culture survive. Design activities that put people from both sides to work on real problems together, since shared work builds shared norms faster than training. Finish with a timeline, a budget and early signs that integration is working. Name a few specific practices from each culture that will survive, so both groups can see themselves in the result.

Get MGT 510 Module 7 written to your instructions

Upload the MGT 510 Module 7 instructions and the merger or integration you are studying. We compare cultural end states, apply research on why culture clashes sink combinations, pick an approach that fits your diagnosis and design the activities and timeline. Your first integration paper is free and arrives in roughly two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More MGT 510 papers and related MBA samples

MGT 510 Module 7 questions, answered

Where can I find a free MGT 510 Module 7 Culture Integration Assignment sample?

This page carries the full MGT 510 Module 7 assignment, designing how two merged credit unions should combine their cultures.

What are the cultural end states in a merger?

Marks and Mirvis describe preservation, absorption, reverse merger, best of both and transformation, differing in how much each partner's culture changes.

Why do culture clashes hurt mergers?

Groups lose shared understanding, misread each other's behavior and blame each other, which slows integration and erodes performance and retention.

What is a best-of-both integration?

An approach that deliberately keeps chosen strengths from each culture and combines them, rather than letting one side absorb the other.

How long does cultural integration take?

Usually years rather than months; visible changes in routines can come within a year, but shared assumptions take longer to form.