| Course | MGT 510 Cultivating Organizational Culture |
|---|---|
| Module | Module 5 |
| Paper type | graduate milestone diagnosing an organization's culture with the competing values framework |
| Length | About 1,010 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MBA |
| Updated | October 2026 |
Free sample paper for MGT 510 Module 5
Both Sides Want Less Market: A Competing Values Diagnosis of Kennebec Casco Credit Union
[Student Name]
Southern New Hampshire University
MGT 510: Cultivating Organizational Culture
Milestone One: Culture Diagnosis
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Both Sides Want Less Market: A Competing Values Diagnosis of Kennebec Casco Credit Union
Introduction
The culture assessment and leadership analysis described two legacy cultures under one name and a reward system that favors one of them. This milestone measures that picture. It uses the competing values framework to survey employees on the culture they experience now and the culture they would prefer, compares the two legacy groups, interprets the results with research on culture types and performance and identifies the gaps and common ground that the change plan must address.
Organization
The credit union combines Kennebec Valley Federal Credit Union, 11 branches and about 170 staff, and Casco Point Credit Union, 15 branches and about 250 staff, which merged in 2025. It serves 158,000 members with $2.3 billion in assets. Departures have run at 22 percent a year since the merger, up from 14, and complaints from members have risen by almost a third.
Framework
Cameron and Quinn (2011) organized culture along two dimensions: flexibility and discretion versus stability and control, and internal focus versus external focus. The quadrants produce four culture types. Clan cultures emphasize collaboration, loyalty and development. Adhocracy cultures emphasize creativity and adapting. Market cultures emphasize results, competition and goals. Hierarchy cultures emphasize control, procedures and efficiency. Their Organizational Culture Assessment Instrument asks people to divide 100 points among four statements on six dimensions, once for the culture as it is and once for the culture they would prefer.
Method
The survey went to all 420 employees through a confidential link, and 340 responded, an 81 percent rate. Response rates were similar for former Kennebec staff, 136 of 170, and former Casco staff, 204 of 250. Results are reported as average points for each quadrant across the six dimensions.
Results
Culture profiles, average points of 100
| Quadrant | Kennebec now | Kennebec preferred | Casco now | Casco preferred |
|---|---|---|---|---|
| Clan | 22 | 45 | 20 | 25 |
| Adhocracy | 10 | 15 | 14 | 20 |
| Market | 46 | 15 | 44 | 35 |
| Hierarchy | 22 | 25 | 22 | 20 |
The two groups describe today's culture almost identically: dominated by the market quadrant, with collaboration and creativity well behind. They differ sharply on what they want. Former Kennebec staff want the market emphasis cut by two-thirds and clan to lead. Former Casco staff want market to remain the largest single quadrant but at a lower level, with more room for collaboration and new ideas.
Results by Dimension
Largest gaps between current and preferred, all respondents
| Dimension | Quadrant | Current | Preferred |
|---|---|---|---|
| Management of employees | Clan | 19 | 41 |
| Criteria of success | Market | 52 | 24 |
| Organizational glue | Clan | 21 | 37 |
| Strategic emphases | Adhocracy | 11 | 20 |
The widest gaps concern how employees are managed and how success is defined. Respondents describe success today as "winning in sales rankings" and want it defined more by member outcomes and teamwork.
Interpretation
A market score in the mid-forties looks like the Monday ranking email, huddles where branch rankings come first and promotions that follow product counts. A clan score near twenty looks like managers who rarely ask about development and a teller's concern that goes unanswered. The low adhocracy score fits the old Kennebec Valley pattern of slow adaptation and the Casco habit of executing a set sales playbook rather than experimenting with new ones.
Research on Culture Types
Hartnell et al. (2011) pooled 84 studies. Collaborative, clan-type cultures showed their strongest ties to how employees felt about their jobs and employer; results-driven market cultures to operating and financial outcomes; and creative adhocracy cultures to innovation. Each of the three still showed positive links to effectiveness overall. For Kennebec Casco, the pattern suggests that a market-heavy culture may deliver short-run product numbers while costing the commitment that drives retention, which fits the rise in turnover.
Does Culture Come First?
A fair objection is that the market culture is simply a response to performance pressure after the merger. Boyce et al. (2015) followed automobile dealerships over several years and found that culture predicted later customer satisfaction and vehicle sales more strongly than performance predicted later culture. If that pattern holds in retail banking, changing the culture is not a luxury to postpone until results improve; it is one of the levers that produces results.
Common Ground
Despite their differences, both groups want clan to rise, adhocracy to rise and market to fall. Both rate hierarchy about where it is. The difference is degree: Kennebec staff want a large shift, Casco staff a moderate one. A target profile that both could accept might set clan near 35, adhocracy near 18, market near 25 and hierarchy near 22, a culture led by collaboration with a clear but not dominant results focus.
Gaps for the Change Plan
Gaps to close
| Gap | From | Toward |
|---|---|---|
| How success is defined | Product rankings | Member outcomes plus products |
| How employees are managed | Goals and monitoring | Coaching and development |
| How new ideas emerge | Set playbook | Branch-level experiments |
| Whose habits are valued | Casco sales routines | Best of both legacies |
Branch Variation
Branch-level results confirm the subcultures the assessment noticed. Two former Casco branches near Brunswick score clan at 31 points today, well above the Casco average, and their staff report lower turnover. Three former Kennebec branches that adopted the dashboards fully score market above 50. Lending, drawn from both legacies, scores hierarchy highest at 34, reflecting its underwriting rules. These variations matter for the change plan: the target profile is a direction for the whole credit union, but branches starting from different points will need different first steps, and the Brunswick branches offer a working example of a blended culture already in place.
Limitations
The instrument measures perceptions, not behavior, and people may report what they think leaders want to hear even in a confidential survey. Averages also hide variation: some branches on each side depart from their legacy pattern. Follow-up focus groups in four branches would test whether the numbers match daily experience.
Conclusion
Kennebec Casco's employees agree on more than the merger's tensions suggest. The two legacy groups agree that results pressure leads today and that teamwork and experimentation deserve more weight. The change plan in Milestone Two can start from that shared direction rather than from the argument over whose culture wins.
References
Boyce, A. S., Nieminen, L. R. G., Gillespie, M. A., Ryan, A. M., & Denison, D. R. (2015). Which comes first, organizational culture or performance? A longitudinal study of causal priority with automobile dealerships. Journal of Organizational Behavior, 36(3), 339-359. https://doi.org/10.1002/job.1985
Cameron, K. S., & Quinn, R. E. (2011). Diagnosing and changing organizational culture: Based on the competing values framework (3rd ed.). Jossey-Bass.
Hartnell, C. A., Ou, A. Y., & Kinicki, A. (2011). Organizational culture and organizational effectiveness: A meta-analytic investigation of the competing values framework's theoretical suppositions. Journal of Applied Psychology, 96(4), 677-694. https://doi.org/10.1037/a0021987
What the MGT 510 Module 5 instructions ask for
Milestone One in MGT 510 usually asks you to analyze an organization's culture in a structured way, using a framework or instrument, and to identify the gap between the current culture and the culture the organization needs. Expect to describe the organization, explain the framework, present evidence, compare current and desired states and connect the findings to performance and strategy. A strong milestone uses a recognized diagnostic tool, reports results for subgroups rather than only averages, explains what the scores mean in behavior, uses research on culture and effectiveness and ends with clear implications for the change plan that follows. Many versions also ask you to describe the organization's history and strategy briefly so the diagnosis has context.
How this MGT 510 Module 5 milestone one example is built
The sample diagnoses Kennebec Casco Credit Union with the competing values framework, surveying 340 of 420 employees on the clan, adhocracy, market and hierarchy quadrants. Both legacy groups see today's culture as market-dominated, scoring it 44 to 46 points of 100. Former Kennebec staff want clan to rise to 45 points; former Casco staff want clan at 25 and adhocracy at 20, with market falling to 35. Using Hartnell, Ou and Kinicki's meta-analysis of culture types and effectiveness and Boyce and colleagues on culture predicting later performance, it finds common ground: both groups want more collaboration and less market pressure, a shared direction the change plan can use.
Where the MGT 510 Module 5 rubric puts the points
Milestone One rubrics commonly weigh the choice and explanation of the framework, quality of evidence, analysis of current and desired culture, links to performance and strategy and writing and APA style. The best diagnoses report results by subgroup, interpret numbers as behaviors, connect quadrants to research on effectiveness and name the specific gaps a change plan must close. Credit drops for diagnoses that rely on impressions, that report only overall averages, that treat one culture type as best everywhere and that stop at description without implications. Reviewers also reward a clear method section that says who was surveyed, how many answered and how results were grouped, since diagnosis depends on whose views are counted.
MGT 510 Module 5 help: the mistakes that cost points
Choose a framework that produces comparable numbers, such as the competing values framework, so you can show current and preferred culture side by side. Survey as many people as you can and report results by meaningful groups, such as departments, legacy companies or levels. Translate scores into behavior: what does a high market score look like on a Tuesday? Compare current with preferred and look for where groups agree, not only where they differ, since agreement is where change can start. Connect the findings to research on how culture types relate to results, and end with the gaps the next milestone must address. Keep the instrument's language in an appendix and the interpretation in the body.
Get MGT 510 Module 5 written to your instructions
Send the MGT 510 Milestone One brief and tell us which organization's culture you are measuring. We choose a diagnostic framework, design or interpret the survey, compare current and preferred culture and show where groups agree and differ. Turnaround is about two days, and the first culture diagnosis is on us. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More MGT 510 papers and related MBA samples
- MGT 510 Module 1 Discussion: Two Credit Unions, One Name
- MGT 510 Module 2 Culture Assessment Assignment: Artifacts, Values and What No One Says
- MGT 510 Module 3 Discussion: When a Strong Culture Becomes a Problem
- MGT 510 Module 4 Leadership and Culture Assignment: What Leaders Watch, Reward and Repeat
- MGT 510 Module 6 Discussion: The Sales Goal and the Member's Interest
- MGT 510 Module 7 Culture Integration Assignment: Joining Two Ways of Working
- MGT 510 Module 8 Milestone Two: A Culture Change Plan
- MGT 510 Module 9 Discussion: What Engagement Surveys Miss
- MGT 510 Module 10 Final Project: The Culture Strategy
- ACC 646 Module 10 Final Project: A Fraud Prevention Program for the Company
- BMB 655 Module 10 Final Project: A Three-Year Financial Plan
- ACC 691 Module 6 Milestone Two: How the Board and Audit Committee Failed
- FIN 700 Module 3 Milestone One: Three Years of Financial Performance
MGT 510 Module 5 questions, answered
Where can I find a free MGT 510 Module 5 Milestone One sample?
You can read the full MGT 510 Module 5 Milestone One here, diagnosing a merged credit union with the competing values framework.
What is the competing values framework?
Cameron and Quinn's model that maps culture on two dimensions, flexibility versus stability and internal versus external focus, producing clan, adhocracy, market and hierarchy types.
What is the OCAI?
The Organizational Culture Assessment Instrument, a survey in which respondents divide 100 points among four descriptions on six dimensions for current and preferred culture.
Which culture type performs best?
None in every setting; Hartnell, Ou and Kinicki found clan cultures linked to employee attitudes, market cultures to financial results and adhocracy to innovation.
Does culture drive performance or the other way around?
Boyce and colleagues followed automobile dealerships over time and found culture predicted later customer satisfaction and sales more than performance predicted culture.