MGT 510 Module 10 Final Project Example

Reviewed by Portia Lambrick, MBA

This MGT 510 Module 10 Final Project sample presents a complete strategy for shaping an organization's culture, from evidence to a measured roadmap. In SNHU MGT 510 (MGT-510), the Final Project has MBA students combine their culture assessment, diagnosis, integration design and change plan into one strategy. For Kennebec Casco Credit Union, a composite Maine organization formed by merger, the strategy summarizes what the evidence shows, defines the culture the credit union needs in plain behaviors, chooses how to join two legacies and sets out the leadership routines, systems, ethics safeguards, budget, roadmap, risks and scorecard that will carry the change.

CourseMGT 510 Cultivating Organizational Culture
ModuleModule 10
Paper typegraduate final project presenting a complete organizational culture strategy
LengthAbout 1,190 words, 7 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMBA
UpdatedOctober 2026

Free sample paper for MGT 510 Module 10

1

One Credit Union, Two Inheritances: A Culture Strategy for Kennebec Casco Credit Union

[Student Name]

Southern New Hampshire University

MGT 510: Cultivating Organizational Culture

Final Project: Culture Strategy

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingKennebec Casco Credit Union is fictional; all figures, plans and results are illustrative.
2

One Credit Union, Two Inheritances: A Culture Strategy for Kennebec Casco Credit Union

Executive Summary

Kennebec Casco Credit Union began in 2025 as the union of a small-town credit union built on solving members' problems with a suburban one built on product goals. Eighteen months later, it has one mission statement, one reward system that contradicts it and two legacy cultures. Turnover has risen to 22 percent, member complaints about pressure have climbed and an audit found 212 accounts members never used. This strategy recommends that the credit union deliberately combine the best of both legacies, change the leadership routines and systems that send cultural signals and measure behavior as well as attitudes. Over two years it costs about $790,000 and aims to cut turnover to 15 percent and unused accounts to fewer than 30 a year.

What this page is doingThe problem and the plan.
3

The Evidence

Schein and Schein (2017) described culture as layered, from visible artifacts through stated beliefs to assumptions so taken for granted that people no longer notice them, and they argued that the deepest layer drives behavior when the layers conflict. At Kennebec Casco, the visible layer shows dashboards in former Casco branches and screens turned away in former Kennebec ones. The stated layer promises "members before metrics." The assumed layer splits: Kennebec staff believe a visit exists to solve a problem, Casco staff believe it exists to add a product. Leadership signals favor the second: the Monday product ranking, a manager disciplined for missing goals despite high satisfaction, 15 of 19 promotions to former Casco staff and a teller's letter left unanswered.

What this page is doingWhat lies beneath the card.
4

What the Survey Added

The competing values survey of 340 employees showed the two sides agreeing on more than they realize: results pressure dominates now, and both would trade some of it for teamwork and new ideas. Hartnell et al. (2011) showed in their review that collaborative cultures relate most strongly to employee commitment, results-driven cultures to efficiency and profit, and creative cultures to new products and services. A credit union losing experienced staff while chasing product counts has tilted too far toward one source of effectiveness at the expense of another.

What this page is doingAgreement under the conflict.
5

The Culture Kennebec Casco Needs

Rather than adjectives, the strategy defines the needed culture in observable behaviors. Tellers solve the member's problem first and offer products only when they meet a need the member has described. Managers spend more time coaching than reviewing rankings. Success is reported as member outcomes and used products, not products opened. Anyone can raise a concern and receives an answer within ten days. Branches test new ideas and share what they learn. Results are discussed openly every week, including when they disappoint.

What this page is doingSix behaviors.
6

Integration Choice

Marks and Mirvis (2011) set out the cultural outcomes available when organizations combine, ranging from keeping both cultures intact to one absorbing the other to building something new. Kennebec Casco has drifted into absorption by Casco's culture without choosing it. The strategy chooses best of both: from Kennebec, problem-solving patience and knowing members by name; from Casco, open measurement, energy in daily huddles and comfort with digital tools.

What this page is doingBest of both, decided openly.
7

Leadership Routines

Leadership routines, before and after

RoutineNowUnder the strategy
CEO's Monday emailBranch ranking by products openedMember outcomes, used products and one member story
Branch visitsScheduled reviews of numbersOne unscheduled day a month on the floor
Response to concernsNo replyAnswer within ten days; summary shared monthly
Response to a missed goalImprovement plan for the managerReview of satisfaction and used products before any action
Regional leadershipSingle leader, mostly from CascoCo-leaders, one from each legacy, for the first year
What this page is doingWhat changes at the top first.
8

Systems

The scorecard counts products only once funded and used within ninety days and adds first-contact resolution and member satisfaction. Promotion criteria weigh member outcomes, results and peer feedback equally. Hiring profiles add problem-solving and member care. Managers move from daily rankings to weekly coaching conversations. Each region receives a small fund to test two ideas a year.

What this page is doingWhere signals are built in.
9

Rituals and Integration

Huddles open with a member story before the numbers. A peer-chosen quarterly award honors a problem solved. Each former Kennebec branch pairs with a former Casco branch, and staff spend two days a quarter in the partner branch. Mixed working groups redesign the scorecard and the new-hire program, which teaches problem-solving and products in equal measure.

What this page is doingShared work and shared stories.
10

Ethics Safeguards

The unused accounts showed how a goal can pull against members' interests. An ombudsperson outside the branch chain will receive concerns. The audit of unused accounts will repeat every quarter, and any branch with a rising count will be reviewed for pressure, not praised for volume. Leaders will report concerns raised and actions taken in the monthly update.

What this page is doingProtecting members from the scorecard.
11

Readiness

Armenakis et al. (1993) argued that people become ready for change when they see why it is needed and believe the organization can achieve it. The strategy shows the need through the credit union's own evidence and builds belief through early, visible actions: answering the teller's letter in the first month, changing the Monday email and promoting the first managers under the new criteria within six months. The Brunswick branches, already running a blended culture with lower turnover, show it can work.

What this page is doingWhy employees will believe it.
12

Roadmap

Culture strategy roadmap

PeriodFocusMilestones
Months 1-3CredibilityLetter answered; Monday email changed; guiding team formed; joint regional meetings
Months 4-9SystemsNew scorecard and promotion criteria live; ombudsperson hired; branch pairing begins
Months 10-15HabitsCoaching model across all managers; new-hire program running; first branch experiments
Months 16-24AnchoringRepeat survey; review of rituals; decide what to keep, change or drop
What this page is doingTwo years.
13

Budget

The integration activities cost about $310,000 over eighteen months, and the change plan's training, systems, ombudsperson, experiments and surveys cost about $480,000 over two years, for a combined $790,000. Extra resignations have cost the credit union roughly $1.2 million a year since the merger, so cutting turnover back to 15 percent would repay the strategy within its first year of full effect.

What this page is doingOne combined figure.
14

Risks

Pressure from one poor quarter might pull leaders back to daily rankings, so the board should lock in the scorecard for two years. Casco high performers may feel demoted; they are invited to lead working groups, and results remain visible. Kennebec staff may doubt leaders' sincerity; the early actions are chosen to answer that doubt. A change of chief executive would threaten the plan; board sponsorship and the guiding team are meant to sustain it.

What this page is doingWhat could undo it.
15

Scorecard

Culture scorecard, reviewed quarterly

TypeIndicatorStarting pointTwo-year goal
BehaviorAccounts opened but never used, per year212Fewer than 30
BehaviorConcerns answered within ten daysNot tracked95 percent
BehaviorInternal moves across legacy lines325
AttitudesCollaboration score on the culture survey2132 or more
AttitudesKennebec-legacy employees rating engagement favorably59 percent72 percent or more
ResultsTurnover22 percent15 percent
ResultsComplaints about sales pressure30 percent above pre-mergerPre-merger level or lower
What this page is doingBehavior, attitudes and results.
16

Conclusion

Kennebec Casco did not decide which culture it would become; its leaders' signals decided for it. This strategy asks leaders to decide on purpose: keep the care that built Kennebec Valley's loyalty, keep the discipline that drove Casco Point's growth, and change the routines, systems and rituals that tell employees which one counts.

What this page is doingChoosing the culture on purpose.
17

References

Armenakis, A. A., Harris, S. G., & Mossholder, K. W. (1993). Creating readiness for organizational change. Human Relations, 46(6), 681-703. https://doi.org/10.1177/001872679304600601

Hartnell, C. A., Ou, A. Y., & Kinicki, A. (2011). Organizational culture and organizational effectiveness: A meta-analytic investigation of the competing values framework's theoretical suppositions. Journal of Applied Psychology, 96(4), 677-694. https://doi.org/10.1037/a0021987

Marks, M. L., & Mirvis, P. H. (2011). A framework for the human resources role in managing culture in mergers and acquisitions. Human Resource Management, 50(6), 859-877. https://doi.org/10.1002/hrm.20445

Schein, E. H., & Schein, P. A. (2017). Organizational culture and leadership (5th ed.). Wiley.

What the MGT 510 Module 10 instructions ask for

The final project in MGT 510 usually asks for a comprehensive analysis of an organization's culture and a strategy for cultivating the culture it needs. Expect to present the organization, assess its culture with frameworks and evidence, define a desired culture, explain leadership's role, recommend changes to systems, practices and rituals, address ethics and integration where relevant and set an implementation plan with measures. The best culture strategies hold together as a single case, update the milestones where feedback called for it, link each recommendation to evidence, describes the desired culture in observable behaviors and gives leaders a roadmap and scorecard they could use. Some versions also ask for an executive presentation or a short reflection on what you learned, so check every required part.

How this MGT 510 Module 10 final project example is built

The sample builds one culture strategy for Kennebec Casco Credit Union. It summarizes the evidence: a mission statement contradicted by the reward system, leadership signals favoring sales, a competing values survey showing both legacy groups want more collaboration, 212 unused accounts and turnover at 22 percent. Using Schein on how leaders build culture, Hartnell and colleagues on culture types and effectiveness, Marks and Mirvis on merger end states and Armenakis and colleagues on readiness, it defines the needed culture in six behaviors, chooses best of both and sets out leadership routines, system changes, ethics safeguards, a two-year roadmap, a combined budget of $790,000, risks and a scorecard.

Where the MGT 510 Module 10 rubric puts the points

Final project rubrics commonly score the depth of the culture analysis, the clarity of the desired culture, the soundness of the strategy and leadership role, the implementation plan and measures and the use of research and APA style. The strongest projects connect each recommendation to evidence, describe culture in behaviors, change systems as well as messages and give a scorecard leaders can use. Marks fall when milestones are stacked without revision, when the desired culture is a list of adjectives, when leaders' own behavior is left out and when measures cover attitudes but not behavior or results. Graders also check that the budget, roadmap and scorecard agree with each other and that instructor feedback from both milestones has been addressed.

MGT 510 Module 10 help: the mistakes that cost points

Assume your readers are executives who never saw your earlier papers. Open with the core problem and your main recommendations. Present the evidence briefly and in layers, from what is visible to what is assumed. Describe the culture you want in behaviors people could observe, not adjectives. Explain what leaders must do differently, since culture follows leaders' attention and rewards. Recommend changes to systems, rituals and ethics safeguards. Revise earlier work where feedback changed your thinking. Combine budgets from earlier milestones into one figure, build a roadmap and finish with a scorecard that tracks behavior, attitudes and results. Read the finished plan once as a skeptical board member and fix any claim that lacks evidence.

Get MGT 510 Module 10 written to your instructions

Share the MGT 510 Final Project rubric along with what your instructor said about Milestones One and Two. We fold your assessment, diagnosis, integration and change work into one culture strategy, with a roadmap, budget and scorecard, and make each recommendation trace to evidence. Expect it in two days; your first final project is free. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More MGT 510 papers and related MBA samples

MGT 510 Module 10 questions, answered

Where can I find a free MGT 510 Module 10 Final Project sample?

Read the full MGT 510 Final Project here: a culture strategy for a merged credit union with roadmap, budget and scorecard.

What is a culture strategy?

A plan that defines the culture an organization needs, explains how leaders and systems will build it and sets measures and a timeline for the change.

How should a desired culture be described?

In observable behaviors, such as how managers spend their time and how success is defined, rather than in adjectives such as innovative or caring.

What role do leaders play in culture change?

Leaders shape culture through what they attend to, reward, model and respond to; changing their routines is usually the first step.

How do you measure whether culture has changed?

Combine attitude surveys reported by group with behavioral measures, such as turnover, concerns raised and customer outcomes, tracked over several years.