MGT 510 Module 8 Milestone Two Example

Reviewed by Portia Lambrick, MBA

This MGT 510 Module 8 Milestone Two sample builds a plan to change an organization's culture toward a target profile. In SNHU MGT 510 (MGT-510), Milestone Two has MBA students convert their culture diagnosis into a change strategy leaders could run. For Kennebec Casco Credit Union, a composite Maine organization formed by merger, the paper sets a target culture, explains how leaders will build readiness for change, sequences the work with research on why transformations fail, checks each change against the values it should support and sets measures, a two-year timeline, a budget and responsibilities for leaders at every level.

CourseMGT 510 Cultivating Organizational Culture
ModuleModule 8
Paper typegraduate milestone presenting a culture change plan
LengthAbout 1,040 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMBA
UpdatedOctober 2026

Free sample paper for MGT 510 Module 8

1

From the Monday Ranking to the Member Story: A Culture Change Plan for Kennebec Casco Credit Union

[Student Name]

Southern New Hampshire University

MGT 510: Cultivating Organizational Culture

Milestone Two: Culture Change Plan

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingKennebec Casco Credit Union is fictional; targets, budgets and plans are illustrative.
2

From the Monday Ranking to the Member Story: A Culture Change Plan for Kennebec Casco Credit Union

Introduction

The survey in Milestone One showed former Kennebec and former Casco employees alike rating results pressure as the leading trait today and asking for more teamwork and freedom to try things. The integration assignment chose a best-of-both approach. This milestone turns those findings into a two-year culture change plan: a target culture, a readiness strategy, the sequence of changes, the alignment of systems with values, measures, a timeline, a budget and roles.

What this page is doingFrom diagnosis to plan.
3

Target Culture

Current and target culture, points of 100

QuadrantCurrent, all staffTarget
Clan2135
Adhocracy1218
Market4525
Hierarchy2222

In behavior, the target culture means managers who coach rather than monitor, success defined by member outcomes as well as products, branches free to test new ideas and results still reviewed openly every week.

What this page is doingWhere the credit union is heading.
4

Building Readiness

Armenakis et al. (1993) argued that leaders build readiness with a message carrying two ideas: that the credit union as it stands is not where it must be, and that the people involved are capable of closing that shortfall. Persuasive communication, active participation and outside sources of information all help carry the message. For Kennebec Casco, the discrepancy message is the gap between "members before metrics" and the evidence: 212 unused accounts, rising turnover and complaints about pressure. Efficacy comes from the Brunswick branches, which already run a blended culture with lower turnover. The personal stake is concrete: for tellers, less pressure to sell what members do not need; for Casco high performers, a scorecard that still counts results.

What this page is doingWhy people would want this.
5

Sequence

Kotter (1995) drew on many company transformations to list eight recurring mistakes, among them starting without real urgency, relying on a coalition too weak to push, burying the vision in too little communication, tolerating obstacles, skipping early visible gains, celebrating success before the work is done and never tying the new behaviors to the culture itself. The plan's sequence responds to each.

Sequence and the errors it avoids

PhaseMonthsMain actionsError avoided
Urgency and coalition1-3Share audit and turnover data at all-staff meetings; form a guiding team of 12 from both legacies and all levelsToo little urgency; weak coalition
Vision and systems3-9Publish the target culture in plain behaviors; launch the redesigned scorecard and promotion criteriaUnclear vision; obstacles left in place
Early wins6-12Celebrate first branches to cut unused accounts and raise satisfaction; publish resultsNo short-term wins
Spread and deepen12-24Coaching model for all managers; branch experiments; repeat surveyDeclaring victory too soon; changes not anchored
What this page is doingLessons on why change fails.
6

Aligning Systems

Detert et al. (2000) argued that improvement efforts succeed when they fit the organization's underlying cultural values, and they described dimensions such as the basis of truth, the motivation of employees and the orientation to change. The plan checks each system change against the values it should express.

System changes and the values they support

SystemChangeValue supported
ScorecardProducts counted only if funded and used; first-contact resolution and member satisfaction addedMembers before metrics
Promotion criteriaEqual weight for member outcomes, results and peer feedbackCollaboration and results
Management modelManagers trained to coach; weekly one-to-ones replace daily rankingsDevelopment
Speak-up channelOmbudsperson outside the branch chain; every concern answered within ten daysIntegrity
HiringProfiles list problem-solving and member care alongside sales resultsService
Branch experimentsEach region may test two new ideas a year with a small budgetAdaptability
What this page is doingEach change against the values.
7

Addressing Resistance

Former Casco high performers may resist losing status tied to product rankings; inviting several to lead working groups and keeping results visible addresses that. Some branch managers may resist coaching because it takes more time than reviewing dashboards; the plan cuts two monthly reports to make room. Some long-tenured Kennebec staff may doubt that leaders mean it; early, visible actions such as answering the teller's letter and changing the Monday email build credibility.

What this page is doingWho may push back.
8

Leadership Roles

The CEO owns the plan and models it: the Monday email changes in month three, and the CEO spends one day a month in branches. The chief operating officer chairs the guiding team. Regional co-leaders carry the plan into branches. Branch managers hold weekly coaching sessions and run the new huddle. Human resources redesigns promotion criteria, hiring profiles and the management training.

What this page is doingWho does what.
9

Communication

Communication follows the readiness message. In the first month, the CEO and the chief operating officer hold joint meetings in every region, presenting the audit and turnover data together so that neither legacy can read the plan as one side's victory. Every month afterward, a short update reports progress on the measures, including setbacks. Branch managers receive a talking guide for their huddles, but the most important communication is action: the changed Monday email, the answered letter and the first promotions under the new criteria will tell employees more than any announcement. Concerns raised through the new channel, with names removed, will be summarized in each update along with what was done.

What this page is doingHow the plan will be told.
10

Measures

Culture change measures

LevelMeasureBaselineYear 2 target
BehaviorUnused accounts opened per year212Below 30
BehaviorConcerns raised through speak-up channel and answered within 10 daysNone tracked95 percent answered
AttitudesClan score, all staff2132 or higher
AttitudesFavorable engagement among Kennebec-legacy employees59 percent72 percent
ResultsAnnual turnover22 percent15 percent
ResultsMember complaints about pressure30 percent above pre-mergerAt or below pre-merger
What this page is doingBehavior, attitudes and results.
11

Budget

Change plan budget

ItemCost
Management coaching training$160,000
Scorecard and systems redesign$90,000
Ombudsperson and speak-up channel$110,000
Branch experiment fund$60,000
Surveys and focus groups$40,000
Guiding team time and facilitation$20,000
Total$480,000
What this page is doingTwo years.
12

Risks

If earnings dip for a quarter, executives may want the daily rankings back, and doing so would destroy the plan's credibility overnight; the board should agree in advance that the scorecard stays for two years. Survey fatigue could weaken measurement; surveys are limited to two a year. A leadership change at the top would put the plan at risk; the guiding team and board sponsorship are meant to carry it through.

What this page is doingWhat could derail the plan.
13

Conclusion

The plan does not ask employees to adopt new values on faith. It changes what leaders measure, reward, ask about and respond to, the signals that built the current culture, and it gives both legacy groups a role in building the next one.

What this page is doingChanging the signals.
14

References

Armenakis, A. A., Harris, S. G., & Mossholder, K. W. (1993). Creating readiness for organizational change. Human Relations, 46(6), 681-703. https://doi.org/10.1177/001872679304600601

Detert, J. R., Schroeder, R. G., & Mauriel, J. J. (2000). A framework for linking culture and improvement initiatives in organizations. Academy of Management Review, 25(4), 850-863. https://doi.org/10.2307/259210

Kotter, J. P. (1995). Leading change: Why transformation efforts fail. Harvard Business Review, 73(2), 59-67.

What the MGT 510 Module 8 instructions ask for

Milestone Two in MGT 510 generally calls for a plan to change or strengthen an organization's culture based on your diagnosis. Expect to define the target culture, explain the change approach, identify leadership actions, address resistance, align systems such as rewards and structure and set measures and a timeline. A strong plan follows directly from the diagnosis, uses research on change readiness and change processes, changes the systems that send cultural signals rather than relying on communication alone, phases the work realistically and sets measures that show whether behavior, not only attitudes, is shifting. Many versions also ask you to address how the plan will be communicated and how resistance will be handled.

How this MGT 510 Module 8 milestone two example is built

The sample plans culture change at Kennebec Casco Credit Union toward a target profile of about 35 points clan, 18 adhocracy, 25 market and 22 hierarchy. It builds readiness with Armenakis, Harris and Mossholder's elements: showing the gap between stated values and results, building confidence that change is possible and making the personal stake clear. Kotter's lessons on why transformations fail shape the sequence, and Detert, Schroeder and Mauriel's framework checks that the redesigned scorecard, coaching-based management, speak-up channel and promotion criteria fit the values sought. The plan runs two years, costs $480,000 and sets measures for behavior, attitudes and results.

Where the MGT 510 Module 8 rubric puts the points

Milestone Two rubrics commonly score how well the plan follows from the diagnosis, the use of change research, the alignment of systems and leadership behavior, the handling of resistance, measures and timeline and writing and APA style. The best plans change rewards, measures and leadership routines, build readiness deliberately, phase the work and measure behavior. Credit slips for plans built on slogans or training alone, for ignoring rewards and promotion, for unrealistic timelines and for measures limited to a single survey. Graders also check that the budget matches the actions, that each action has an owner and that the plan admits what could derail it, such as a weak quarter or a change of leader.

MGT 510 Module 8 help: the mistakes that cost points

Start from the gaps your diagnosis identified and set a target culture in the same terms, such as a target profile on the competing values framework. Then plan how people will be brought to want the change: show the gap between stated values and current results, build confidence that change is possible and make clear what it means for each person. Change the systems that send signals: measures, rewards, promotion criteria, hiring, rituals and leaders' routines. Phase the work, since changing everything at once overwhelms people. Set measures at several levels, from behavior to results, and assign every action to a named role. Keep a one-page summary of the target culture in plain behaviors that any employee could read.

Get MGT 510 Module 8 written to your instructions

Share the MGT 510 Milestone Two guidelines and your culture diagnosis. We set a target culture, plan how to build readiness, sequence the changes with research on what makes them stick and add measures, a timeline and a budget. The first change plan we write for you is free, usually inside two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More MGT 510 papers and related MBA samples

MGT 510 Module 8 questions, answered

Where can I find a free MGT 510 Module 8 Milestone Two sample?

The full MGT 510 Module 8 Milestone Two plan is on this page, setting out two years of culture change for a merged credit union.

How do you change organizational culture?

Change what leaders pay attention to, reward and model; align systems such as measures, promotion and hiring; build readiness; and phase the work over years.

What is change readiness?

Members' beliefs and intentions about whether change is needed and whether the organization can carry it out, which Armenakis and colleagues argued leaders can shape through their messages.

Why do culture change efforts fail?

Kotter identified common errors such as too little urgency, a weak guiding coalition, under-communication, obstacles left in place and declaring victory too soon.

How long does culture change take?

Usually two to five years; routines can change within months, but shared assumptions follow only when new behaviors are repeatedly rewarded.