MGT 510 Module 6 Discussion Example

Reviewed by Portia Lambrick, MBA

This MGT 510 Module 6 Discussion sample asks how incentives shape the ethics of an organization's culture. SNHU MGT 510 (MGT-510) takes up ethical culture in this week of the MBA course. The post examines Kennebec Casco Credit Union, a composite Maine organization, where a branch audit found more than two hundred accounts that members never funded or used after a products-per-conversation goal was introduced. It applies research on rewarding the wrong behavior, on ethical climate and conduct and on the individual and organizational sources of unethical choices, then proposes changing what is counted and making it safe to speak up.

CourseMGT 510 Cultivating Organizational Culture
ModuleModule 6
Paper typegraduate discussion post on ethical culture and incentives
LengthAbout 340 words, 3 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMBA
UpdatedOctober 2026

Free sample paper for MGT 510 Module 6

1

Module Six Discussion

Two Hundred Accounts Nobody Used

An internal audit of Kennebec Casco Credit Union's account openings over the past twelve months found 212 checking and savings accounts that members never funded or used. Most came from eight branches that ranked at the top of the products-per-conversation goal. No member was charged a fee, and no account was opened without a signature, but several members told auditors they had agreed only because the teller seemed anxious to hit a number.

What this page is doingWhat the audit found.
2

Kerr (1975) collected cases in which managers paid for one thing, wished for something else and then expressed surprise at getting exactly what the pay system bought. Kennebec Casco hoped for deeper member relationships and paid for products opened. Accounts that no one uses are the predictable result. The goal also changed what a good conversation meant. A teller who spent twenty minutes helping a widow sort out her late husband's accounts, the kind of visit Kennebec Valley used to celebrate, now scored zero for the day unless she also opened something.

What this page is doingRewarding A, hoping for B.
3

Employees' perceptions of their organization's ethical climate, including whether it rewards self-interest or honors rules and care for others, shape how they behave (Treviño et al., 1998). Kish-Gephart et al. (2010) found that unethical choices arise from individual characteristics, from features of the issue and from the organizational environment together. Blaming eight branches' tellers would miss the barrel. The same tellers had clean records before the goal arrived, and the unused accounts cluster where managers held daily huddles on the rankings. Firing a few people would leave the conditions that produced the accounts in place, and the next group would face the same pull.

What this page is doingClimate, not just character.
4

Count only funded accounts used within ninety days. Add a measure of members who say their needs were met. And answer concerns: the teller who wrote to executives in month ten deserved a reply, not silence. A named ombudsperson outside the branch chain would help too.

What this page is doingWhat I would change.
5

Is there a goal in your workplace that rewards a number while hoping for something the number cannot see?

What this page is doingFor classmates.
6

References

Kerr, S. (1975). On the folly of rewarding A, while hoping for B. Academy of Management Journal, 18(4), 769-783. https://doi.org/10.2307/255378

Kish-Gephart, J. J., Harrison, D. A., & Treviño, L. K. (2010). Bad apples, bad cases, and bad barrels: Meta-analytic evidence about sources of unethical decisions at work. Journal of Applied Psychology, 95(1), 1-31. https://doi.org/10.1037/a0017103

Treviño, L. K., Butterfield, K. D., & McCabe, D. L. (1998). The ethical context in organizations: Influences on employee attitudes and behaviors. Business Ethics Quarterly, 8(3), 447-476. https://doi.org/10.2307/3857431

What the MGT 510 Module 6 instructions ask for

The ethics discussion in MGT 510 usually asks how organizational culture influences ethical behavior, often focusing on incentives, leadership and climate, and how leaders can build an ethical culture. Some prompts use a case of misconduct. A strong post moves beyond blaming individuals, shows how rewards and norms make certain choices easier, uses research on ethical climate and the sources of unethical decisions, applies it to a specific situation and proposes structural changes rather than only training or a code of conduct. Its final question turns peers toward the targets set where they work. Check whether the prompt asks you to use a case from the readings or one from your own experience.

How this MGT 510 Module 6 discussion example is built

The sample examines Kennebec Casco Credit Union, where an internal audit found 212 checking and savings accounts opened in the past year that members never funded or used, mostly in branches under the most pressure to meet products-per-conversation goals. Applying Kerr's analysis of rewarding A while hoping for B, Treviño, Butterfield and McCabe on ethical climate and conduct and Kish-Gephart, Harrison and Treviño's meta-analysis of bad apples, bad cases and bad barrels, the post argues that the goal, not a few careless tellers, produced the accounts. It proposes counting only funded, active accounts, adding member outcome measures and creating a protected channel for concerns. It ends by asking classmates which of their own goals reward a number the organization does not really want.

Where the MGT 510 Module 6 rubric puts the points

Ethical culture discussions are commonly graded on understanding of how culture and incentives shape ethics, use of research, application to the case, quality of proposed remedies and engagement with peers. The best posts look at the system rather than only the individual, connect specific rewards to specific behaviors and propose changes to measures and leadership responses. Posts lose credit for moral lectures, for remedies limited to training or a new code, for ignoring the incentive system and for replies that simply condemn the employees involved. Graders also look for remedies that a leader could actually put in place, with some sense of how success would be checked.

MGT 510 Module 6 help: the mistakes that cost points

Begin with the behavior and work back to the system: what did people do, and what made that choice easier than the alternative? Look at what is counted and rewarded, what managers ask about and what happens to people who raise concerns. Use research to show that unethical choices usually come from people and situations together. Propose changes to the system, such as what gets measured, how goals are set and how leaders respond to concerns, not only training. In replies, ask classmates whether any goal in their workplace could tempt people to cut corners. Keep moral language light and let the facts of the incentive carry the argument.

Get MGT 510 Module 6 written to your instructions

Post the MGT 510 Module 6 prompt and the incentive or ethical problem you are studying. We trace how rewards shape behavior, apply research on ethical climate and propose changes to measures and speak-up channels. Your first ethics post costs nothing and is back in roughly two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More MGT 510 papers and related MBA samples

MGT 510 Module 6 questions, answered

Where can I find a free MGT 510 Module 6 Discussion sample?

The full MGT 510 Module 6 post appears here, examining how a credit union's sales goal pulled against members' interests.

How does culture influence ethical behavior?

Through what is rewarded, what leaders model and respond to and what norms people learn, which can make ethical or unethical choices easier.

What is the folly of rewarding A while hoping for B?

Kerr's term for reward systems that pay for one behavior while leaders hope for a different one, which reliably produces the rewarded behavior.

Are unethical decisions caused by bad people or bad organizations?

Both; Kish-Gephart, Harrison and Treviño found that individual traits, the nature of the issue and organizational factors all contribute.

How can leaders build an ethical culture?

Align rewards with stated values, model ethical choices, respond well to concerns and make it safe to speak up, alongside clear standards.