| Course | MGT 510 Cultivating Organizational Culture |
|---|---|
| Module | Module 4 |
| Paper type | graduate assignment analyzing how leaders shape organizational culture |
| Length | About 1,040 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MBA |
| Updated | October 2026 |
Free sample paper for MGT 510 Module 4
The Weekly Report Is the Real Mission Statement: How Kennebec Casco's Leaders Are Shaping Its Culture
[Student Name]
Southern New Hampshire University
MGT 510: Cultivating Organizational Culture
Leadership and Culture Assignment
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
The Weekly Report Is the Real Mission Statement: How Kennebec Casco's Leaders Are Shaping Its Culture
Introduction
Kennebec Casco Credit Union's leaders talk often about "members before metrics." Employees, according to the culture assessment, believe the real message is "open accounts." The question here is where that belief came from. The paper applies Schein's embedding mechanisms to eighteen months of leadership actions at the merged credit union, explains what each action has taught employees, considers psychological safety and the fit between culture and strategy and recommends changes in leadership practice.
Framework
Schein and Schein (2017) identified a small group of primary embedding mechanisms through which leaders teach culture, whether they intend to or not. Employees watch which results a leader checks every week, how the leader behaves when something goes badly wrong, where money and recognition flow, what the leader personally does and who is hired, promoted or let go. Organization charts, procedures, rituals and printed creeds play a supporting role; they strengthen the lesson only if the primary signals already teach it.
Attention and Measurement
Every Monday the CEO, who led Casco Point before the merger, emails all staff a ranking of branches by products opened per conversation. No other measure appears. Branch visits by senior leaders begin with the branch's numbers. Employees quickly learned that the number in the Monday email is what leaders care about.
Reactions to Critical Incidents
In the merger's eighth month, the Gardiner branch, a former Kennebec branch with some of the highest member satisfaction scores in the system, missed its product goal for a second straight month. Its manager was placed on a performance improvement plan within two weeks. In the same quarter, a South Portland branch drew four member complaints about pressure to open credit cards; leaders took no action because its numbers were strong. Staff across the system heard both stories.
Rewards and Status
Rewards and promotions since the merger
| Reward | Former Casco Point staff | Former Kennebec staff |
|---|---|---|
| Promotions | 15 | 4 |
| Monthly product awards | 41 | 13 |
| Selected for leadership program | 9 | 3 |
Former Kennebec staff make up 40 percent of the workforce but received about 21 percent of promotions. Every promotion went to someone in the top quarter on product counts.
Role Modeling
The chief operating officer, who led Kennebec Valley, still spends one morning a month working a teller window and talks about the members he met. The CEO does not visit branches except for scheduled reviews. Employees notice which leader holds which role: the operating officer's habits are admired but carry no weight in the reward system the CEO controls.
Selection
Since the merger, hiring profiles for member service roles list "proven sales results" as the first requirement. Branch managers from the Kennebec side say candidates who describe patience or problem-solving rarely make it past the first screen. Over time, this filter will change the workforce itself, replacing the people who carry the service assumption with people who never learned it.
Silence as a Signal
In month ten, a Waterville teller with fourteen years of service wrote to the executive team that the product goals were pushing staff to offer members accounts they did not need. She received no reply. Edmondson (1999) linked a team's willingness to admit mistakes and question one another to a shared sense of psychological safety, and showed that what leaders do when someone speaks up goes a long way toward creating or destroying it. Two other tellers told interviewers they had planned to raise similar concerns but decided not to after hearing what happened.
Culture Style and Strategy
Groysberg et al. (2018) argued that leaders should choose culture styles that fit their strategy, and that results-oriented cultures help growth but can crowd out caring and learning when pushed too far. Kennebec Casco's strategy, stated in its merger plan, was to grow by deepening member relationships, not by maximizing products per visit. A results culture is not wrong in itself, but the current signals emphasize results at the expense of the caring culture that produced Kennebec Valley's loyalty.
What Employees Have Learned
Signals and lessons
| Mechanism | Signal | Lesson employees draw |
|---|---|---|
| Attention | Monday product ranking | Products are what count |
| Critical incident | Gardiner manager on a plan; complaints at South Portland ignored | Missing goals is worse than pressuring members |
| Rewards | Promotions follow product counts | Sales skill gets you promoted |
| Role modeling | COO at the teller window, CEO absent | Service is admired but not rewarded |
| Selection | Sales results first in hiring | The organization wants sellers |
| Silence | Teller's complaint unanswered | Raising concerns is pointless |
Recommendations
First, add two measures to the Monday email: problems resolved on first contact and member satisfaction by branch, so attention covers service as well as sales. Second, review the Gardiner decision publicly and set a rule that no branch manager is placed on a plan for product goals alone when satisfaction is high. Third, add member satisfaction and first-contact resolution to promotion criteria, weighted equally with product results. Fourth, have the CEO answer the teller's letter, meet with her and spend one day a month in branches without a scheduled review.
Secondary Mechanisms
Schein's secondary mechanisms reinforce the same message. The merged organization chart places branch operations under a sales director, not a member service director. The new onboarding program spends two days on product knowledge and two hours on member problem-solving. Branch rituals follow the Casco pattern: a daily stand-up built around the previous day's results and a bell rung when a loan closes. None of these systems is harmful alone, but together with the primary signals they leave little doubt about priorities.
Risks
Former Casco staff may read the changes as a retreat from the growth strategy that their side's success was built on, especially if the CEO's own messages do not change. Adding measures without dropping any could also overload branch managers. The changes should be explained as balancing, not reversing, and the product ranking should stay alongside the new measures for at least a year.
Conclusion
Kennebec Casco's leaders did not set out to build a culture of sales over service, but their attention, reactions, rewards and silences have done exactly that. Changing what they measure, praise and respond to is the fastest way to bring the culture closer to the values they print on the card.
References
Edmondson, A. (1999). Psychological safety and learning behavior in work teams. Administrative Science Quarterly, 44(2), 350-383. https://doi.org/10.2307/2666999
Groysberg, B., Lee, J., Price, J., & Cheng, J. Y.-J. (2018). The leader's guide to corporate culture. Harvard Business Review, 96(1), 44-52.
Schein, E. H., & Schein, P. A. (2017). Organizational culture and leadership (5th ed.). Wiley.
What the MGT 510 Module 4 instructions ask for
The leadership and culture assignment in MGT 510 usually has you trace the ways leaders create, embed or change culture, often using Schein's embedding mechanisms or a similar framework. Expect to examine leaders' attention, reactions to crises, resource allocation, role modeling, rewards and selection, and to explain what employees learn from each. A strong paper uses specific leadership actions as evidence, shows how actions can contradict stated values, explains the effect on employees' behavior and recommends concrete changes in leadership practice rather than general advice about communication or vision. Some versions ask you to analyze your own leader or yourself as a leader, so check whose actions the prompt wants examined.
How this MGT 510 Module 4 leadership and culture assignment example is built
The sample examines eighteen months of leadership at Kennebec Casco Credit Union using Schein's primary embedding mechanisms. The CEO's weekly email reports products opened by branch but never member problems solved; when a former Kennebec branch missed its goal, its manager was placed on an improvement plan within two weeks; 15 of 19 promotions went to former Casco staff; and a teller's written complaint about pressure went unanswered. Drawing on Edmondson's research on psychological safety and Groysberg and colleagues on matching culture to strategy, it concludes that leaders have taught sales over service and recommends four changes in what they report, praise, ask and promote.
Where the MGT 510 Module 4 rubric puts the points
Leadership and culture papers are commonly scored on correct use of the framework, quality of evidence about leaders' actions, analysis of what those actions teach, practicality of recommendations and APA style. The best papers treat every leadership habit as a signal, show where signals contradict stated values, connect signals to employee behavior and recommend specific changes. Credit is reduced for papers that analyze speeches or values statements instead of actions, for recommendations such as "communicate the vision better," for ignoring rewards and promotions and for treating leaders as either heroes or villains. The strongest papers also explain secondary mechanisms such as structure and rituals and show whether they support or undercut the primary signals.
MGT 510 Module 4 help: the mistakes that cost points
List what leaders actually did over a period of months: what they asked about in meetings, what reports they read, how they reacted when something went wrong, who they promoted and what they did themselves. Then ask what an employee would conclude from each. Schein's embedding mechanisms give you categories; use them, but let the evidence lead. Look for contradictions between what leaders say and what they reward, since employees believe rewards. Recommend changes small enough for a leader to start tomorrow, such as adding a measure to a weekly report or asking a different question in branch visits. Tables that pair each signal with what employees learn can make the analysis easy to follow.
Get MGT 510 Module 4 written to your instructions
Upload the MGT 510 Module 4 instructions and the leaders you are studying. We trace what they pay attention to, reward and model, show what those signals teach employees and recommend changes leaders can make next month. Expect your first leadership paper within two days, at no charge. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More MGT 510 papers and related MBA samples
- MGT 510 Module 1 Discussion: Two Credit Unions, One Name
- MGT 510 Module 2 Culture Assessment Assignment: Artifacts, Values and What No One Says
- MGT 510 Module 3 Discussion: When a Strong Culture Becomes a Problem
- MGT 510 Module 5 Milestone One: Diagnosing the Merged Culture
- MGT 510 Module 6 Discussion: The Sales Goal and the Member's Interest
- MGT 510 Module 7 Culture Integration Assignment: Joining Two Ways of Working
- MGT 510 Module 8 Milestone Two: A Culture Change Plan
- MGT 510 Module 9 Discussion: What Engagement Surveys Miss
- MGT 510 Module 10 Final Project: The Culture Strategy
- QSO 680 Module 1 Discussion: Why a Dry Dock Is Complex
- OL 640 Module 7 Milestone Three: Franchisor-Franchisee Relationship and Quality Control
- MKT 620 Module 2 Consumer Decision Process Assignment: The Consumer Decision Process
- QSO 600 Module 6 Discussion: A Fourth Ironer or a Better Third?
MGT 510 Module 4 questions, answered
Where can I find a free MGT 510 Module 4 Leadership and Culture Assignment sample?
The full MGT 510 Module 4 assignment is here, tracing how a merged credit union's leaders are shaping its culture.
How do leaders shape organizational culture?
Mostly by example: the results they check, the way they handle a bad week, who gets recognition and promotion and what they do themselves teach employees what really counts.
What are Schein's embedding mechanisms?
Primary mechanisms such as leader attention, crisis reactions, resource allocation, role modeling, rewards and selection, supported by secondary ones such as structure, systems, rituals and stories.
What is psychological safety?
The belief among team members that they can admit a mistake or voice a worry without being embarrassed or punished, a condition Edmondson tied to team learning.
Why do employees believe actions more than words?
Actions such as rewards and promotions carry real consequences, so they reveal what leaders truly value when stated values point another way.