FIN 700 Module 3 Milestone One Example

Reviewed by Portia Lambrick, MBA

This FIN 700 Module 3 Milestone One sample analyzes a company's financial performance over three years as the base for a capital decision. SNHU FIN 700 (FIN-700) assigns this first milestone in Module Three of its MS Finance capstone. For the composite Sabine Hollow Building Products, the paper reviews growth, profitability, returns, liquidity, working capital, debt and cash flow from fiscal 2023 to 2025, breaks return on equity into its parts with a DuPont analysis, compares the company with a composite peer group and checks how well earnings turn into cash. It ends with what the results imply for how much new capital the company can carry and where it should look for returns.

CourseFIN 700 Graduate Finance Capstone
ModuleModule 3
Paper typegraduate capstone milestone analyzing financial performance
LengthAbout 1,040 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMS Finance
UpdatedOctober 2026

Free sample paper for FIN 700 Module 3

1

Financial Performance Analysis of Sabine Hollow Building Products, Fiscal 2023 to 2025

[Student Name]

Southern New Hampshire University

FIN 700: Graduate Finance Capstone

Milestone One

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingSabine Hollow and its peer group are an invented teaching case; all figures are illustrative.
2

Financial Performance Analysis of Sabine Hollow Building Products, Fiscal 2023 to 2025

Introduction

Before the board can decide how to deploy about $250 million, it needs a clear picture of how well Sabine Hollow uses the capital it already has. This milestone analyzes the company's financial statements for fiscal 2023 through 2025, splits its return on equity into its parts, compares it with a composite group of four regional and national building materials producers and checks the quality of its earnings. It closes with implications for the capital decision.

What this page is doingPurpose of the analysis.
3

Growth and Profitability

Summary results (millions of dollars)

MeasureFY2023FY2024FY2025
Revenue588612640
EBITDA828896
EBIT525662
Net income29.633.138.0
Earnings per share0.740.830.95
EBITDA margin13.9%14.4%15.0%

Revenue grew about 4 percent a year, but shipments of brick and block were roughly flat as builders slowed starts under higher mortgage rates. Growth came from price increases of 4 to 5 percent a year, which the company was able to pass through because competitors faced the same higher costs for energy and cement. Gross margin rose from 24.0 to 25.0 percent as price ran ahead of costs, and EBITDA margin rose by just over a point. Net income grew faster than revenue, by about 13 percent a year, because lower debt cut interest expense from $13 million to $12 million while operating profit rose. Growth that rests on price rather than volume is less durable; if housing starts fall further, the company may have to give back some of the increases.

What this page is doingPrice did the work.
4

Returns and the DuPont Split

DuPont analysis of return on equity

YearNet marginAsset turnoverEquity multiplierReturn on equity
FY20235.0%0.851.868.0%
FY20245.4%0.871.808.5%
FY20255.9%0.891.769.3%

Return on equity, measured on year-end equity, rose from 8.0 to 9.3 percent. The split shows that almost all of the gain came from net margin, which rose by nearly a point, with a small lift in asset turnover. The equity multiplier fell as debt was repaid, which on its own lowered return on equity, so the company improved its returns while reducing financial risk. Soliman (2008) showed that analysts and investors respond to movements in sales per dollar of operating assets, not only to margins, when judging future profits, which makes the flat turnover a concern: the company is not getting more sales out of its plants. Return on invested capital after tax rose from about 6.9 to 8.0 percent, still below the cost of capital estimated later in the capstone.

What this page is doingMargin, not turnover.
5

Liquidity, Working Capital and Debt

The current ratio is about 2.7, and the $20 million of cash is backed by a $100 million bank revolver with nothing drawn, so liquidity is ample. Working capital is less efficient. The cash conversion cycle lengthened from about 78 days in 2023 to 83 days in 2025, with 47 days of receivables, 73 days of inventory and 37 days of payables. Inventory built up as the plants kept running while shipments flattened. Debt fell from $220 million to $200 million; measured against EBITDA, net debt dropped from about two and a half years of earnings to under two. EBIT covered interest 4.0 times in 2023 and 5.2 times in 2025.

What this page is doingSafe but slow.
6

Cash Flow and Earnings Quality

Operating cash flow rose from about $54 million in 2023 to $66 million in 2025, consistently well above net income because depreciation of about $34 million is a large noncash charge. Capital spending of $34 million to $36 million a year, close to depreciation, has kept plants running but has not modernized them. Free cash flow of $30 million in 2025 covered the $16 million dividend and $10 million of debt repayment. Dichev et al. (2013) report that finance chiefs see earnings backed by cash flow and repeated over time as the best evidence of quality, and on that test Sabine Hollow scores well, with no large unusual items.

What this page is doingEarnings backed by cash.
7

What the Trends Leave Out

Three cautions apply. First, the peer figures are medians for a composite group of four producers whose product mixes differ; one sells mostly aggregates, which earns higher margins than brick, so part of the margin gap reflects mix rather than performance. Second, year-end equity overstates return on equity slightly in a year when equity grew, compared with an average-equity measure. Third, three years cover only one phase of the housing cycle, a slowdown after a boom, so the ratios do not show how the company performs when starts fall sharply. The capstone's stress tests will address that gap.

What this page is doingLimits of the analysis.
8

Comparison With Peers

Sabine Hollow against a composite peer group, fiscal 2025

MeasureSabine HollowPeer median
EBITDA margin15.0%18.0%
Return on invested capital8.0%10.5%
Net debt to EBITDA1.9x1.6x
Cash conversion cycle83 days68 days

The margin gap of three points is worth about $19 million of EBITDA a year at current revenue. Most of it traces to energy: the company's older periodic and tunnel kilns use more natural gas per ton of brick than the newer kilns many peers have installed. The cash cycle gap of fifteen days ties up roughly $20 million of extra working capital. Fairfield and Yohn (2001) found that breaking return on assets into margin and turnover helps forecast future profitability changes, which supports focusing on these two gaps rather than on return on equity alone.

What this page is doingWhere the gaps are.
9

Implications for the Capital Decision

Three conclusions carry forward. First, the balance sheet can take more debt: at 1.9 times EBITDA and five times interest coverage, the company could borrow another $60 million to $100 million and stay within a 2.5 times ceiling. Second, the company earns less on its existing capital than peers and less than its cost of capital, so any new investment must clear the hurdle convincingly, and modernizing kilns may deserve a place beside the three options. Third, freeing the extra fifteen days of working capital would provide about $20 million of cash without new borrowing.

What this page is doingWhat the numbers allow.
10

Conclusion

Sabine Hollow has grown earnings faster than revenue, paid down debt and turned profit into cash, but its returns lag peers because of older, energy-heavy plants and slow inventory. It has the balance sheet to fund one significant investment, and the next milestones will determine which option earns the most above its cost of capital.

What this page is doingA sound base with room to improve.
11

References

Dichev, I. D., Graham, J. R., Harvey, C. R., & Rajgopal, S. (2013). Earnings quality: Evidence from the field. Journal of Accounting and Economics, 56(2-3), 1-33. https://doi.org/10.1016/j.jacceco.2013.05.004

Fairfield, P. M., & Yohn, T. L. (2001). Using asset turnover and profit margin to forecast changes in profitability. Review of Accounting Studies, 6(4), 371-385. https://doi.org/10.1023/A:1012430513430

Soliman, M. T. (2008). The use of DuPont analysis by market participants. The Accounting Review, 83(3), 823-853. https://doi.org/10.2308/accr.2008.83.3.823

What the FIN 700 Module 3 instructions ask for

Milestone One in FIN 700 usually asks you to analyze your capstone company's financial statements over several years. Expect to calculate and interpret ratios for growth, profitability, returns, liquidity, efficiency and solvency, to compare the company with peers or industry benchmarks, to review cash flow and to identify strengths and weaknesses. Many versions ask for a DuPont analysis. A strong milestone does more than list ratios: it explains why each moved, links the results to the industry and strategy described earlier, separates what is improving from what is lagging and draws conclusions that the valuation and financing work in later milestones can use, such as how much debt the company can carry.

How this FIN 700 Module 3 milestone one example is built

The sample covers fiscal 2023 to 2025 for Sabine Hollow. Revenue grew from $588 million to $640 million, mainly on price. EBITDA margin rose from 13.9 to 15.0 percent and return on equity from 8.0 to 9.3 percent; the DuPont split shows the gain came from margin, with turnover nearly flat. Net debt fell from 2.5 to 1.9 times EBITDA, and EBIT now covers interest more than five times. Against a composite peer group, the company trails by three points of EBITDA margin, two and a half points of return on capital and fifteen days in its cash cycle. The paper traces the gaps to older kilns and slow inventory and concludes the company can carry more debt but must lift returns on what it already owns.

Where the FIN 700 Module 3 rubric puts the points

Grading for this milestone tends to weigh correct ratio calculations, the interpretation of trends, the comparison with peers, the review of cash generation and earnings quality, the identification of strengths and weaknesses and the link to the capstone decision. High-scoring milestones explain causes, not just changes, use a DuPont or similar breakdown to locate the source of return changes and quantify gaps against peers in dollars. Points are lost for tables of ratios without interpretation, for comparisons with peers that differ in size or business, for ignoring cash flow and for conclusions that do not connect to the decision the capstone will make.

FIN 700 Module 3 help: the mistakes that cost points

Choose ratios that answer questions, not every ratio the textbook lists. For each, state the trend and the reason, using what you learned about the industry. Break return on equity into margin, turnover and the equity multiplier to show where change came from. Compare with a small set of truly similar peers and turn gaps into dollars: three points of margin on $640 million of revenue is about $19 million of EBITDA a year. Check that earnings are backed by cash: operating cash flow should run at or above net income year after year. End with what the analysis means for the decision, how much debt the company can safely add and where it should look for better returns.

Get FIN 700 Module 3 written to your instructions

Upload the FIN 700 Milestone One guidelines and your company's statements. We compute and interpret three years of ratios, split return on equity, compare against peers and say what the results mean for the capital decision. About two days; the first milestone is free. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More FIN 700 papers and related MS Finance samples

FIN 700 Module 3 questions, answered

Where can I find a free FIN 700 Module 3 Milestone One sample?

The full FIN 700 Module 3 milestone is on this page, with three years of ratios, a DuPont split and peer gaps for a brick and block maker.

What is a DuPont analysis?

It splits return on equity into three multiplied parts, net margin, revenue relative to total assets and total assets relative to equity, to show whether profitability, efficiency or borrowing moved the return.

What is the cash conversion cycle?

The days between paying for inputs and collecting from customers, calculated as days of receivables plus days of inventory minus days of payables.

Why compare a company with peers?

Trends show whether a company is improving, but only peers show whether its performance is good for its industry and where gaps are largest.

How do you check earnings quality?

Compare operating cash flow with net income over several years and look for growing receivables, inventory or unusual items that keep earnings ahead of cash.