| Course | FIN 700 Graduate Finance Capstone |
|---|---|
| Module | Module 8 |
| Paper type | graduate capstone assignment on acquisition financing and stress testing |
| Length | About 1,080 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MS Finance |
| Updated | October 2026 |
Free sample paper for FIN 700 Module 8
Financing the Atchafalaya Acquisition and Testing It Against a Housing Downturn
[Student Name]
Southern New Hampshire University
FIN 700: Graduate Finance Capstone
Financing and Risk Assignment
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Financing the Atchafalaya Acquisition and Testing It Against a Housing Downturn
Introduction
The previous milestone found that buying Atchafalaya Masonry Supply for $160 million creates the most value of the three options, provided synergies are earned. This paper decides how to pay for it. It compares two structures, projects their effect on debt ratios and interest coverage, tests both in a moderate and a severe housing downturn and recommends a structure with the loan terms the company should seek.
Two Structures
Structure A funds the whole price with a new $160 million term loan, plus about $4 million of fees, at a floating rate near 7.0 percent. Structure B uses a $120 million term loan and issues about 2.2 million new Sabine Hollow shares, worth $40 million at $18, to the family that owns Atchafalaya, with a two-year lock-up. Because the previous milestone valued the shares near $16.70, issuing them at $18 does not short-change existing holders, and it keeps the sellers invested in the combined company. Travlos (1987) found that bidders paying with stock earned lower announcement returns than those paying with cash, which reflects the signal that managers think their shares are rich; issuing a modest amount to private sellers rather than the public market limits that signal.
Credit Measures at Closing
Pro forma credit measures at closing
| Measure | Structure A, all debt | Structure B, debt and stock |
|---|---|---|
| New borrowing ($ millions) | 164 | 124 |
| Net debt ($ millions) | 344 | 304 |
| Combined EBITDA ($ millions) | 116 | 116 |
| Net debt to EBITDA | 3.0x | 2.6x |
| Annual interest ($ millions) | 23.2 | 20.4 |
| EBIT to interest | 3.3x | 3.7x |
| Shares outstanding (millions) | 40.0 | 42.2 |
Structure A starts above the 2.5 times ceiling set in Module Five and needs about two years of cash flow to return to it. Structure B starts just above the ceiling and returns within about a year. Structure B issues about 5.5 percent more shares, which spreads future earnings more thinly, but it carries about $2.8 million less interest a year.
The Downturns
Brick and block volumes fell steeply during the housing collapse that began in 2006, and producers' margins fell faster than revenue because kilns and plants carry high fixed costs. Two cases are used. In the moderate case, volumes fall 10 percent and prices hold, so revenue falls about 10 percent and EBITDA about 20 percent, to roughly $93 million. In the severe case, volumes fall 20 percent and prices 5 percent, so revenue falls about 24 percent and EBITDA about 40 percent, to roughly $70 million. Both assume the downturn starts in the first year after closing, the worst timing for the new debt.
Management Actions
In a severe downturn, management could take four actions within a year. Suspending the $0.40 dividend would save about $16 million to $17 million. Cutting capital spending to maintenance would save about $8 million. Running plants to demand rather than to inventory would release about $20 million of working capital, the same amount Milestone One found tied up above peers. Deferring the New Braunfels plant costs nothing because it would not yet be under way. Together, these actions would reduce net debt by about $44 million in the first year beyond ordinary debt repayment.
Stress Results
Net debt to EBITDA after one year of downturn
| Case | Structure A | Structure B |
|---|---|---|
| Moderate downturn, no actions | 3.5x | 3.1x |
| Severe downturn, no actions | 4.7x | 4.1x |
| Severe downturn, with actions | 4.1x | 3.5x |
Lenders for a borrower of this size commonly set a maximum net debt to EBITDA covenant in the range of 3.5 to 4.0 times. At 3.75 times, both structures pass the moderate case, though Structure A has little room. In the severe case, Structure A breaches the covenant even after every action, while Structure B passes once the actions are taken. Opler and Titman (1994) found that highly indebted firms lost more sales than their rivals in industry downturns, as customers and suppliers worried about their survival. Almeida and Philippon (2007) estimated that, once the tendency of distress to strike in bad economic times is priced in, expected distress costs for a typical BBB-rated company are around 4.5 percent of its value, roughly as large as the tax savings its debt provides. A breach would not mean bankruptcy, but it would hand lenders control over dividends, acquisitions and the plant at the worst moment.
Interest Rate Risk
Both term loans float with short-term rates. Under Structure B, short rates two points higher would mean roughly $2.4 million more interest each year. Swapping half the term loan to a fixed rate for three years would cap that exposure at about $1.2 million and is consistent with the partial approach proposed for natural gas.
What Structure B Gives Up
The safer plan has real costs. In a normal year, the 2.2 million extra shares spread earnings 5.5 percent more thinly, but the $2.8 million of interest saved, about $2.1 million after tax, offsets most of that, so earnings per share end up only about 1 percent below the all-debt plan. The sellers will hold about 5 percent of the company, which gives them a voice, though not control, and the lock-up ends after two years, when a large sale could weigh on the price. Issuing shares also sets a reference price of $18 that the market will watch. Against these costs, Structure B avoids a covenant breach in the severe case, keeps the dividend decision in the board's hands rather than the lenders' and leaves the revolver free for working capital in a downturn. A family that has run a masonry business for decades is also likely to stay engaged during integration if its wealth depends on the combined company, which supports the synergy plan.
Recommendation
The company should fund the acquisition with a $120 million term loan and $40 million of shares issued to the sellers. It should seek a net debt to EBITDA covenant of 4.0 times, stepping down to 3.5 times after two years, which gives room in a severe downturn; swap half the term loan to fixed for three years; keep the $100 million revolver undrawn as a liquidity reserve; and adopt a board policy that the dividend will be suspended before the company breaches its own 3.5 times internal limit.
Conclusion
An all-debt deal gives the best per-share earnings when housing is steady, yet it has no room left if a deep slump arrives. The mixed structure costs about 5.5 percent dilution and gives the company a plan that holds through a downturn like the last major one. That trade is worth making.
References
Almeida, H., & Philippon, T. (2007). The risk-adjusted cost of financial distress. The Journal of Finance, 62(6), 2557-2586. https://doi.org/10.1111/j.1540-6261.2007.01286.x
Opler, T. C., & Titman, S. (1994). Financial distress and corporate performance. The Journal of Finance, 49(3), 1015-1040. https://doi.org/10.1111/j.1540-6261.1994.tb00086.x
Travlos, N. G. (1987). Corporate takeover bids, methods of payment, and bidding firms' stock returns. The Journal of Finance, 42(4), 943-963. https://doi.org/10.1111/j.1540-6261.1987.tb03921.x
What the FIN 700 Module 8 instructions ask for
The financing and risk assignment in FIN 700 usually asks you to recommend how your capstone company should fund its chosen investment and to test the plan against adverse conditions. Expect to compare debt, equity and hybrid structures, project credit measures, chiefly the ratio of net debt to EBITDA and the times interest is covered, consider covenants and interest rate exposure and run downside scenarios. Many versions ask what management could do if conditions worsen. A strong paper compares concrete alternatives with figures, bases downturn scenarios on history, includes realistic management responses, checks covenants under each case and recommends a structure whose risks the company can survive.
How this FIN 700 Module 8 financing and risk assignment example is built
The sample compares two ways to pay $160 million for Atchafalaya. All new debt takes net debt to about $344 million including fees, about 3.0 times combined EBITDA of $116 million. A $120 million term loan plus $40 million of shares issued to the selling family, about 2.2 million shares, takes it to about 2.6 times. In a moderate downturn, with EBITDA down a fifth, both stay under a 3.75 times covenant. In a severe one, with EBITDA down 40 percent, the all-debt plan breaches it even after cutting the dividend, trimming capital spending and freeing working capital, while the mixed plan holds at about 3.5 times. The paper recommends the mix, a covenant of 4.0 times and swapping half the term loan to a fixed rate.
Where the FIN 700 Module 8 rubric puts the points
The rubric commonly scores the comparison of financing alternatives, the projection of credit measures, the design of downside scenarios, the realism of management actions, the attention to covenants and interest rate risk, and the recommendation. High-scoring papers compare at least two complete structures, ground downturns in past cycles, show credit measures before and after management actions and match the structure to the company's ability to survive the bad case. Points are lost for choosing all debt or all equity without testing either against a bad year, for downturns that cut revenue but not margins, for ignoring covenants and for actions management could not realistically take.
FIN 700 Module 8 help: the mistakes that cost points
Define each structure fully: amounts, instruments, rates, fees and any shares issued. Project net debt to EBITDA and interest coverage for each. Build the downturn from history: building products volumes fell sharply in the housing collapse after 2006, and margins fall faster than revenue because plants have high fixed costs. Then list what management could actually do, cut the dividend, trim capital spending to maintenance, release working capital, and recalculate. Check the results against likely covenants. Weigh what the safer structure costs, such as dilution, against what it protects. Finish with the terms to negotiate, such as covenant levels and a rate hedge.
Get FIN 700 Module 8 written to your instructions
Upload the FIN 700 Module 8 guidelines and the decision you are funding. We compare financing structures, project debt ratios and coverage, run downturn cases with management actions and recommend terms to negotiate. About two days; the first assignment is free. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More FIN 700 papers and related MS Finance samples
- FIN 700 Module 1 Discussion: Capital Allocation as the Finance Leader's Main Job
- FIN 700 Module 2 Company and Industry Analysis: Brick, Block and the Texas Building Cycle
- FIN 700 Module 3 Milestone One: Three Years of Financial Performance
- FIN 700 Module 4 Discussion: Is 9.4 Percent the Right Hurdle?
- FIN 700 Module 5 Cost of Capital Assignment: The WACC and the Target Debt Level
- FIN 700 Module 6 Milestone Two: Valuing the Plant, the Acquisition and the Buyback
- FIN 700 Module 7 Discussion: Should the Company Hedge Natural Gas for Its Kilns?
- FIN 700 Module 9 Milestone Three: The Draft Recommendation and Plan
- FIN 700 Module 10 Final Project: The Capstone Report to the Board
- OL 620 Module 4 Discussion: Pay Transparency
- SPT 608 Module 1 Discussion: Selling a Ballgame, Not Soap
- QSO 680 Module 2 Program Assignment: Three Ships, One Fleet Program
- MKT 660 Module 9 Discussion: Ethics of Nonprofit Storytelling and Imagery
FIN 700 Module 8 questions, answered
Where can I find a free FIN 700 Module 8 Financing and Risk Assignment sample?
The full FIN 700 Module 8 assignment is on this page, comparing two ways to fund a $160 million acquisition and testing both in a housing downturn.
How should a company finance an acquisition?
By comparing debt, equity and mixed structures on cost, dilution, credit measures and survival in a downturn, and choosing the one whose bad case the company can withstand.
Why pay sellers partly in stock?
It reduces the borrowing needed, keeps the sellers invested in the combined company's success and shares the risk that the deal underperforms.
What is a financial covenant?
A promise in a loan agreement to keep a measure such as debt to EBITDA below a set level, which gives lenders rights if it is breached.
How do you build a downturn scenario?
Base it on a past downturn in the industry, cut volumes and prices, let margins fall with fixed costs and include what management could realistically do in response.