| Course | FIN 700 Graduate Finance Capstone |
|---|---|
| Module | Module 7 |
| Paper type | graduate capstone discussion post on commodity hedging |
| Length | About 390 words, 3 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MS Finance |
| Updated | October 2026 |
Free sample paper for FIN 700 Module 7
Module Seven Discussion
Gas, Kilns and the Case for a Partial Hedge
Sabine Hollow's brick kilns burn about 3.2 million MMBtu of natural gas a year, costing about $11.2 million at $3.50 per MMBtu. Gas prices have moved by several dollars within a single year in the past decade, so a rise of $1.50 is plausible; it would cost about $4.8 million, roughly 5 percent of EBITDA. Customers absorb price increases only with a lag of six months or more.
Froot et al. (1993) argued that the gain from hedging comes from protecting a firm's planned investment: a bad year should not force it to drop good projects or turn to costly outside funding. If the company borrows to buy Atchafalaya, a gas spike in the first year would hit just as it needs cash to pay down debt. Guay and Kothari (2003) found that most nonfinancial firms' derivative positions are small relative to their total risk, so hedging is a modest tool, not a cure. In the US airline industry, Carter et al. (2006) linked fuel hedging to a valuation premium and traced much of it to investment: carriers protected from fuel spikes could keep buying aircraft and routes when unhedged rivals were cutting back. A building products firm in a downturn is in a similar position, since distressed competitors' plants and customers come up for sale exactly when cash is short.
A rolling program: swaps fixing the price on about half of the next twelve months' gas and a quarter of the following twelve, renewed each quarter, with any wider coverage approved by the board. Not more, because kiln volumes fall when housing slows, and a full hedge on falling volume becomes a bet. Price escalators tied to an energy index in large builder contracts would add a second layer.
A hedge buys time, not a lower price. If gas settles at a higher level for years, the swaps only delay the cost by a year or so, and the real defense is the kiln upgrades that cut gas use per ton. The program also needs governance: a written policy, a cap on coverage and quarterly reporting, so that hedging never becomes a way to bet on prices.
If gas fell and the hedge lost $2 million, how would you explain it to a board that only sees the loss?
References
Carter, D. A., Rogers, D. A., & Simkins, B. J. (2006). Does hedging affect firm value? Evidence from the US airline industry. Financial Management, 35(1), 53-86. https://doi.org/10.1111/j.1755-053X.2006.tb00131.x
Froot, K. A., Scharfstein, D. S., & Stein, J. C. (1993). Risk management: Coordinating corporate investment and financing policies. The Journal of Finance, 48(5), 1629-1658. https://doi.org/10.1111/j.1540-6261.1993.tb05123.x
Guay, W., & Kothari, S. P. (2003). How much do firms hedge with derivatives? Journal of Financial Economics, 70(3), 423-461. https://doi.org/10.1016/S0304-405X(03)00179-X
What the FIN 700 Module 7 instructions ask for
This FIN 700 discussion usually asks you to identify a significant financial risk facing your capstone company and to evaluate how it should be managed. Prompts may focus on commodity, interest rate or currency risk, ask whether hedging creates value or invite a comparison of tools such as swaps, futures, options and contract terms. A strong post sizes the exposure in dollars and as a share of earnings, explains why hedging might add value for this company in particular, draws on evidence about what firms actually do, proposes a specific program with limits and acknowledges what hedging cannot do. Replies to classmates should test the size of their exposures.
How this FIN 700 Module 7 discussion example is built
The sample estimates that Sabine Hollow's kilns burn about 3.2 million MMBtu of natural gas a year, costing about $11.2 million at $3.50; a rise of $1.50 would cost about $4.8 million, roughly 5 percent of EBITDA. It notes that this matters more now, with acquisition debt planned. It draws on the argument that hedging adds value when it protects planned investment from costly outside financing, on evidence that most firms' derivative positions are small relative to their exposures and on airline research tying fuel hedging to higher value. It proposes swaps covering about half of the next twelve months and a quarter of the following year, and asks classmates how they would explain a hedging loss.
Where the FIN 700 Module 7 rubric puts the points
Discussions in this module are generally graded on identification and sizing of the risk, understanding of hedging theory and tools, application to the company, use of evidence and engagement with classmates. Strong posts express exposure in earnings terms, explain why hedging helps this particular firm, propose specific coverage ratios and instruments and note costs and limits. Posts lose points for recommending that a company hedge everything or nothing without sizing the exposure, for describing derivatives without a program, for ignoring the accounting and governance of hedges and for replies that do not question a classmate's sizing or instrument choice.
FIN 700 Module 7 help: the mistakes that cost points
Start by sizing the risk: volume times a plausible price move, expressed as a share of EBITDA or of debt service. Then ask whether hedging helps this company, not companies in general. Theory says hedging adds value when a bad year would force the firm to cut good investments or pay a lot for outside money, which is more likely after a debt-funded acquisition. Propose a program with a coverage ratio, a horizon and instruments, and say who approves it. Admit what hedging does not do: it smooths costs for a time but cannot protect against a lasting rise in prices. Ask classmates how they would handle a hedge that loses money, because that is the moment boards abandon programs.
Get FIN 700 Module 7 written to your instructions
Share the FIN 700 Module 7 prompt and your company's main price risk. We size the exposure in dollars of EBITDA, weigh hedging against research on when it pays and propose a program peers can question. About two days; no charge for the first post. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More FIN 700 papers and related MS Finance samples
- FIN 700 Module 1 Discussion: Capital Allocation as the Finance Leader's Main Job
- FIN 700 Module 2 Company and Industry Analysis: Brick, Block and the Texas Building Cycle
- FIN 700 Module 3 Milestone One: Three Years of Financial Performance
- FIN 700 Module 4 Discussion: Is 9.4 Percent the Right Hurdle?
- FIN 700 Module 5 Cost of Capital Assignment: The WACC and the Target Debt Level
- FIN 700 Module 6 Milestone Two: Valuing the Plant, the Acquisition and the Buyback
- FIN 700 Module 8 Financing and Risk Assignment: Paying for the Deal and Testing a Bad Year
- FIN 700 Module 9 Milestone Three: The Draft Recommendation and Plan
- FIN 700 Module 10 Final Project: The Capstone Report to the Board
- ACC 620 Module 5 Pension Assignment: Cost and Funded Status of a Frozen Plan
- FIN 691 Module 9 Milestone Three: Reviewing and Stress-Testing the Model
- ACC 610 Module 1 Discussion: Who Writes the Rules, and How
- ACC 550 Module 9 Transfer Pricing Assignment: What Should Candy Pay for Halves?
FIN 700 Module 7 questions, answered
Where can I find a free FIN 700 Module 7 Discussion sample?
The full FIN 700 Module 7 post is on this page, sizing a brick maker's natural gas exposure and proposing a rolling partial hedge.
When does hedging create value for a company?
When it reduces the chance that a bad year forces the company to cut valuable investments, pay high costs for outside financing or face financial distress.
How do you size a commodity exposure?
Multiply the volume used by a plausible price change and compare the result with earnings, cash flow or debt service.
What is a natural gas swap?
A contract that fixes the price a company pays for a set volume of gas, with payments between the parties covering the difference from the market price.
Why hedge only part of an exposure?
Because volumes are uncertain, over-hedging creates its own risk, and leaving some exposure lets the company benefit if prices fall.