FIN 700 Module 5 Cost of Capital Assignment Example

Reviewed by Portia Lambrick, MBA

This FIN 700 Module 5 Cost of Capital Assignment sample works out the blended return a company's investors require and uses it to set a target debt level. SNHU FIN 700 (FIN-700) assigns this work in Module Five of its MS Finance capstone. For the composite Sabine Hollow Building Products, the paper builds the cost of equity from a peer asset beta, a Treasury yield and a market premium, sets the cost of debt from its bond yield, weights both at market values and checks the result against other methods. It then tests how the cost of capital changes at higher and lower debt levels and recommends a target range the capital decision should respect.

CourseFIN 700 Graduate Finance Capstone
ModuleModule 5
Paper typegraduate capstone assignment on cost of capital and capital structure
LengthAbout 1,040 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMS Finance
UpdatedOctober 2026

Free sample paper for FIN 700 Module 5

1

Cost of Capital and Target Capital Structure for Sabine Hollow Building Products

[Student Name]

Southern New Hampshire University

FIN 700: Graduate Finance Capstone

Cost of Capital Assignment

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingSabine Hollow, its peers and its market data are an invented teaching case; inputs are illustrative.
2

Cost of Capital and Target Capital Structure for Sabine Hollow Building Products

Introduction

Every option before the board will be judged against the cost of the capital used to pay for it, and the amount of new debt the company can take on depends on its target capital structure. This paper estimates Sabine Hollow's weighted average cost of capital, explains each input, cross-checks the result and tests how the rate would change at different debt levels. Graham and Harvey (2001) found that about three-quarters of the finance chiefs they surveyed relied on the CAPM when setting what shareholders expect to earn, so it anchors the estimate here, with checks from others.

What this page is doingPurpose.
3

Cost of Equity

For the riskless return, the analysis uses a ten-year Treasury yield, assumed at 4.3 percent for this case, because the options have long lives and the ten-year matches them better than short bills. For the extra return investors want from stocks over Treasuries, the case uses 5.5 percent, a middle figure among those practitioners and academic surveys report. The company's own five-year regression beta is 1.25, but individual betas are noisy, so the estimate uses four comparable producers instead. Their betas, unlevered to remove the effect of their debt, have a median of 0.95. Relevered at Sabine Hollow's market debt to equity ratio of about 0.28 and its 24 percent tax rate, the beta becomes 1.15. The cost of equity is therefore 4.3 percent plus 1.15 times 5.5 percent, or about 10.6 percent.

What this page is doingBuilding from the beta.
4

Cost of Debt

The company has $200 million of debt: a $120 million term loan at a floating rate and $80 million of senior notes issued in 2021 with a 4.25 percent coupon. The coupon reflects rates when the notes were sold, not today's. The notes now trade to yield about 6.8 percent, roughly 2.5 points over Treasuries, consistent with a borrower near the boundary between investment grade and high yield. That yield is the pretax cost of debt. After the 24 percent tax deduction for interest, the cost is about 5.2 percent.

What this page is doingWhat lenders demand today.
5

Weights and the Result

Weighted average cost of capital

ComponentMarket value ($ millions)WeightCost after taxContribution
Equity72078.3%10.6%8.3%
Debt20021.7%5.2%1.1%
Total920100%9.4%

Equity is valued at its market capitalization, 40 million shares at $18, rather than its book value of $410 million. Debt is close to its book value because most of it floats. The result is a cost of capital of about 9.4 percent.

What this page is doingMarket values.
6

Cross-Checks and Range

A dividend growth model, using next year's dividend of $0.42 and long-run growth near 5 percent, implies a cost of equity of only about 7.3 percent, but it ignores the large share of earnings retained and the likely slowdown in growth, so it is a low bound. A bond yield plus premium approach, adding 4 points to the 6.8 percent yield, gives 10.8 percent, close to the CAPM result. Changing the beta by 0.15 either way moves the cost of capital by about 0.65 points, and moving the market premium between 5.0 and 6.0 percent moves it by about 0.45 points. Combining these gives a reasonable range of about 8.8 to 10.1 percent, with 9.4 percent as the central estimate.

What this page is doingHow confident to be.
7

Capital Structure

Cost of capital at different debt levels

Net debt to EBITDADebt ($ millions)Debt weightRelevered betaPretax cost of debtCost of equityWACC
1.5x16417.8%1.116.5%10.4%9.42%
1.9x (today)20222.0%1.156.8%10.6%9.44%
2.5x26028.3%1.237.0%11.1%9.46%
3.5x35638.7%1.418.0%12.0%9.73%

At each level, the beta is relevered to the new debt to equity ratio, and the cost of debt rises as coverage weakens and the likely rating falls. From one and a half to two and a half years of EBITDA in net debt, the blended rate hardly moves; the tax savings from more debt are offset by a riskier cost of equity. Beyond about 2.5 times, both costs rise faster and the cost of capital climbs. The grid does not show the larger risk of distress in a deep housing downturn, when EBITDA could fall by a third and 3.5 times could become more than 5 times.

What this page is doingTesting debt levels.
8

What the Rate Means for the Options

The estimate matters most where projects are close to the line. A plant whose return sits near 10 percent looks acceptable at 9.4 percent and unacceptable at 10.1 percent, the top of the range, while an investment returning 14 percent clears every plausible rate. For that reason, the next milestone will report each option's internal rate of return beside its net present value, so the board can see how far each sits above the range rather than relying on one discount rate. It will also apply a higher rate to the greenfield plant than to the acquisition, since the plant's risks, selling into a region where it has never had a builder account, differ from those of the business as a whole. Krüger and colleagues' evidence, discussed in Module Four, is the reason not to use 9.4 percent for everything.

What this page is doingWhy precision matters here.
9

Recommendation

Frank and Goyal (2009) found that the most reliable predictors of debt levels are industry norms, profitability, asset tangibility and size, and that firms in cyclical industries carry less debt. Myers and Majluf (1984) argued that firms prefer internal cash and then debt to new equity, because issuing shares signals that managers think them overvalued. Both point to a moderate target. Sabine Hollow should aim for net debt of 2.0 to 2.5 times EBITDA, with 2.5 times as a ceiling it can exceed only briefly for a clearly valuable acquisition and with a plan to return within two years. At current EBITDA, that range allows roughly $60 million to $100 million of new borrowing, and more if an acquisition adds earnings. Equity issuance should be a last resort while the shares trade near what the next milestone finds them to be worth.

What this page is doingA target range.
10

Conclusion

The company's cost of capital is about 9.4 percent, within a range of 8.8 to 10.1 percent, and is nearly flat across moderate debt levels. A target of 2.0 to 2.5 times EBITDA keeps the cost of capital low while leaving room for a downturn. The next milestone values each option against this rate and within this limit.

What this page is doingThe rate and the room.
11

References

Frank, M. Z., & Goyal, V. K. (2009). Capital structure decisions: Which factors are reliably important? Financial Management, 38(1), 1-37. https://doi.org/10.1111/j.1755-053X.2009.01026.x

Graham, J. R., & Harvey, C. R. (2001). The theory and practice of corporate finance: Evidence from the field. Journal of Financial Economics, 60(2-3), 187-243. https://doi.org/10.1016/S0304-405X(01)00044-7

Myers, S. C., & Majluf, N. S. (1984). Corporate financing and investment decisions when firms have information that investors do not have. Journal of Financial Economics, 13(2), 187-221. https://doi.org/10.1016/0304-405X(84)90023-0

What the FIN 700 Module 5 instructions ask for

The cost of capital assignment in FIN 700 usually asks you to estimate your capstone company's weighted average cost of capital and to evaluate its capital structure. Expect to estimate the cost of equity, typically with the capital asset pricing model, to determine the cost of debt from yields or ratings, to weight each at market values and to discuss the assumptions behind each input. Many versions ask whether the company's current debt level is appropriate. A strong paper explains each input's source and judgment, cross-checks the result, shows how the rate would change with more or less debt and recommends a target that balances tax savings against financial distress risk.

How this FIN 700 Module 5 cost of capital assignment example is built

The sample builds Sabine Hollow's cost of capital step by step. A median asset beta of 0.95 for comparable producers, relevered at the company's debt to equity ratio, gives a beta of 1.15; with a 4.3 percent Treasury yield and a 5.5 percent market premium, the cost of equity is 10.6 percent. Bonds yielding 6.8 percent cost 5.2 percent after the 24 percent tax rate. Weighted 78 percent equity and 22 percent debt at market values, the cost of capital is 9.4 percent, with a reasonable range of 8.8 to 10.1 percent. A grid of debt levels shows the rate barely changes between 1.5 and 2.5 times EBITDA but rises at 3.5 times, so the paper recommends a target of 2.0 to 2.5 times.

Where the FIN 700 Module 5 rubric puts the points

The rubric typically scores how the equity and debt costs are estimated, how they are weighted, how well assumptions are explained, the cross-checks and sensitivity, the capital structure analysis and the recommendation. High-scoring papers justify each input with a source, use market rather than book weights, relever betas from comparable companies, show a range rather than one number and connect the target structure to the capital decision. Points are lost for betas taken from a website without question, for book-value weights, for using the coupon rate instead of the current yield on debt and for capital structure recommendations made without testing coverage or the cost of distress.

FIN 700 Module 5 help: the mistakes that cost points

Treat each input as a judgment you have to defend. Explain why you chose a ten-year Treasury yield, how you picked the market premium and why a peer beta may be better than the company's own regression. Use the yield investors would demand today for the cost of debt, not the coupon on old bonds. Weight by market values, since those are what investors could sell for. Show a range by changing the beta and the premium. For capital structure, build a small grid of debt levels, relever the beta at each and raise the cost of debt as coverage falls; the point where the rate starts climbing marks the sensible ceiling.

Get FIN 700 Module 5 written to your instructions

Upload the FIN 700 Module 5 instructions and your company's market data. We build the cost of equity and debt step by step, weight them correctly, cross-check the result and test a range of debt levels to set a target. About two days; the first assignment is free. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More FIN 700 papers and related MS Finance samples

FIN 700 Module 5 questions, answered

Where can I find a free FIN 700 Module 5 Cost of Capital Assignment sample?

The full FIN 700 Module 5 assignment is on this page, building a 9.4 percent cost of capital and a target debt range for a brick maker.

What model do most firms use for the cost of equity?

Most companies use the capital asset pricing model: the risk-free rate plus beta times the market risk premium, with beta often taken from comparable firms.

Why relever a beta from comparable companies?

Because a company's own historical beta is noisy; unlevering peers' betas removes the effect of their debt, and relevering applies the company's own structure.

Why use market values rather than book values to weight the WACC?

Market values reflect what investors could sell their claims for and therefore the returns they require on current, not historical, amounts.

How do you choose a target capital structure?

Compare the tax savings of debt with the rising cost of distress, test coverage in a downturn and look for the debt level beyond which the cost of capital begins to rise.