| Course | FIN 691 Financial Modeling |
|---|---|
| Module | Module 9 |
| Paper type | graduate milestone reviewing and stress-testing a financial model |
| Length | About 1,050 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MS Finance |
| Updated | October 2026 |
Free sample paper for FIN 691 Module 9
Model Review and Stress Testing of the Mesquite Ridge Buyout Model
[Student Name]
Southern New Hampshire University
FIN 691: Financial Modeling
Milestone Three
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Model Review and Stress Testing of the Mesquite Ridge Buyout Model
Introduction
A model can be wrong in two ways: its formulas can contain errors, or its assumptions can prove too hopeful. This milestone addresses both for the Mesquite Ridge buyout model. A second analyst reviewed the workbook, and the model was then run under stress cases built from conditions that could plausibly occur together.
The Review
The reviewer, who had not built the model, worked from a written checklist. She traced the IRR, the exit equity value and year-three EBITDA back to their inputs, cell by cell. She checked that each row used one formula copied across all years, using Excel's formula view and a consistency tool. She set extreme inputs, zero growth, 20 percent interest and no add-ons, to see whether the model broke or produced nonsense, such as negative debt. She confirmed that every check on the checks sheet showed true and that the circularity switch worked in both positions. Powell et al. (2009) found that errors were common in operational spreadsheets and that structured auditing found more of them than informal review, which is why a checklist was used.
What the Review Found
First, the returns sheet calculated taxes on the exit with a 25 percent rate typed into the formula rather than linked to the inputs sheet; changing the tax input would have left exit proceeds unchanged. It was relinked. Second, the sum of add-on purchases on the debt schedule stopped one column short, missing year five; correcting it raised year-five debt by $21.6 million and lowered the IRR by about two-tenths of a point before the sweep recovered most of it. The range was rebuilt with a whole-row reference. Third, the two-way data table on the valuation sheet showed values from before the last input change because tables recalculate only on request and the check meant to catch this compared the wrong cell, so it passed anyway; the check now points at the table's center cell and flags any gap from the main valuation. Each error and fix is recorded in the change log with the date and the reviewer's initials.
Choosing the Stress Cases
Four inputs drive most of the result: organic growth, the exit multiple, the add-on program and interest rates. The stress cases combine them as they would move in a real downturn. A recession would slow patient visits, especially for elective procedures; make sellers harder to find and lenders more cautious, reducing add-ons; raise or hold up interest rates if inflation persists; and lower the multiples buyers pay at exit. Evidence from Guo et al. (2011) that a large share of buyout gains in the 2000s came from market and financing conditions, not operations alone, supports moving the exit multiple and interest rates together with growth.
Stress Results
Stress cases for the buyout
| Case | Organic growth | Add-ons per year | Interest rate | Exit multiple | IRR | MOIC | Year-1 debt to EBITDA | Year-1 interest coverage |
|---|---|---|---|---|---|---|---|---|
| Base | 5% | 4 | 8.25% | 11x | 20.6% | 2.55 | 5.0x | 2.6x |
| Flat organic growth | 0% | 4 | 8.25% | 10x | 9.1% | 1.55 | 5.2x | 2.4x |
| Combined downside | 2% | 2 | 10% | 9x | 4.2% | 1.23 | 5.2x | 2.0x |
In the flat-growth case, the add-on program continues but free cash flow cannot keep pace with the borrowing that funds it, so debt rises to about $216 million by year five instead of falling. In the combined downside, the equity barely earns back its cost plus a little more than inflation, and EBITDA covers interest less than twice in the first year, close to the level at which lenders would start to worry.
The Debt Path Under Stress
The returns figures hide how the lenders' position changes year by year. In the base case, debt to EBITDA falls from roughly 5.0 times after the first year to roughly 3.1 times by year five, because acquired earnings and swept cash flow both work in the lenders' favor. In the flat-growth case the ratio still declines, from about 5.2 to 4.1 times, but only because purchased practices add EBITDA; the debt itself climbs every year, since each year's acquisitions are funded with new borrowing that cash flow cannot retire. In the combined downside, interest at 10 percent absorbs about $18.7 million of first-year cash, half of EBITDA, and debt falls only to about $180 million by the exit. A lender watching these numbers would see a borrower that is current on payments but making little progress, which usually leads to tighter terms on any request for more debt to fund acquisitions. Single-input tests on their own would understate this: no one change in the downside case breaks the model, but together they leave almost no room for a further surprise such as losing two large clinics.
What Would Make the Deal Fail
The equity loses money, a return below zero, only if the exit multiple falls to about 8 times with growth near zero, or if a severe recession cuts EBITDA by a fifth in years one and two while interest stays high. In that case, debt would exceed 6 times EBITDA, breaching the lenders' likely covenant and forcing either an equity injection or a restructuring. Kaplan and Stromberg (2009) note that the heavy debt in buyouts disciplines managers but also leaves companies more exposed in downturns, which is the risk these cases quantify.
Implications for the Structure
Three changes would make the deal more resilient. Opening the deal with debt near 5 times EBITDA, half a turn below the plan, would cost about one point of base-case IRR but raise downside coverage. Making add-on purchases conditional on a debt to EBITDA test, for example no new acquisitions above 5 times, would stop the program from piling debt onto a weakening business. Buying protection against higher SOFR on about half of the term loan would limit the damage from a rate shock for a modest premium.
Conclusion
A structured review found and fixed three errors that would otherwise have misstated the model's results. The stress tests show that the base case's 21 percent return depends on growth, the add-on program and a stable exit multiple; in a combined downside, returns fall to about 4 percent and the lenders' measures tighten. The deal survives plausible bad cases, but with less cushion than the base case suggests, and its structure can be adjusted to widen that cushion.
References
Guo, S., Hotchkiss, E. S., & Song, W. (2011). Do buyouts (still) create value? The Journal of Finance, 66(2), 479-517. https://doi.org/10.1111/j.1540-6261.2010.01640.x
Kaplan, S. N., & Strömberg, P. (2009). Leveraged buyouts and private equity. Journal of Economic Perspectives, 23(1), 121-146. https://doi.org/10.1257/jep.23.1.121
Powell, S. G., Baker, K. R., & Lawson, B. (2009). Impact of errors in operational spreadsheets. Decision Support Systems, 47(2), 126-132. https://doi.org/10.1016/j.dss.2009.02.002
What the FIN 691 Module 9 instructions ask for
Milestone Three in FIN 691 usually asks you to review your model's integrity and test its conclusions under adverse conditions. Expect to describe a review process, such as tracing outputs to inputs, checking formula consistency and testing extreme values, to document errors found and corrections made, and to run stress tests that combine plausible bad outcomes. Many versions ask what would have to happen for the investment to fail. A strong milestone shows the review was real, with specific findings, explains how each stress case was chosen, reports results on the measures decision makers and lenders care about and draws practical conclusions for the deal and its structure.
How this FIN 691 Module 9 milestone three example is built
The sample describes a review by a second analyst using a checklist: inputs traced to sources, formulas checked for consistency across rows, extreme values tested and every check confirmed. Three errors turned up: a tax rate typed into a formula on the returns sheet, a sum that missed the newest year of add-ons and a sensitivity table that had not recalculated. Each was fixed and logged. Stress tests followed. With flat organic growth and a 10 times exit, the IRR falls to about 9 percent and debt rises to about $216 million. In a combined downside, 2 percent growth, two add-ons a year, 10 percent interest and a 9 times exit, the IRR is about 4 percent, the equity returns about 1.2 times and EBITDA covers interest less than twice in year one.
Where the FIN 691 Module 9 rubric puts the points
The milestone rubric commonly scores the rigor of the model review, the documentation of errors and fixes, the design of stress cases, the accuracy of results, the attention to lender measures and the quality of conclusions. Strong submissions show specific findings from a structured review, explain why each stress case is plausible, combine adverse changes that would occur together, report returns alongside debt and coverage and identify the conditions under which the deal fails. Points are lost for reviews described only as checked the model, for stress tests that change one input by a token amount and for conclusions that ignore the lenders' perspective.
FIN 691 Module 9 help: the mistakes that cost points
Reviews earn credit when they find something. Use a checklist and a second person, trace the main outputs back to inputs and test extreme values, such as zero growth or a very high interest rate, to see whether the model behaves sensibly. Record what you found and how you fixed it, since a review that finds nothing is either a perfect model or a weak review. For stress tests, combine changes that would happen together: a recession slows growth, makes add-ons harder to find and lowers exit multiples at the same time. Report what lenders care about, debt to EBITDA and interest coverage, as well as returns. Finish by stating the conditions under which the investment fails.
Get FIN 691 Module 9 written to your instructions
Upload the FIN 691 Milestone Three guidelines and your model. We review it as a second analyst would, log and fix what we find, then run stress cases on the inputs that matter and report the effect on returns and lender measures. About two days; the first milestone is free. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More FIN 691 papers and related MS Finance samples
- FIN 691 Module 1 Discussion: What Makes a Model Worth Trusting
- FIN 691 Module 2 Model Design Assignment: Structure and Clinic-Level Revenue Drivers
- FIN 691 Module 3 Milestone One: A Linked Three-Statement Model
- FIN 691 Module 4 Discussion: Circular References in the Debt Schedule
- FIN 691 Module 5 Valuation Assignment: A DCF With Its Sensitivity Tables
- FIN 691 Module 6 Milestone Two: The Leveraged Buyout Model
- FIN 691 Module 7 Discussion: Scenarios or Monte Carlo?
- FIN 691 Module 8 Acquisition Modeling Assignment: Four Practices a Year at Six Times EBITDA
- FIN 691 Module 10 Final Project: The Memo to the Investment Committee
- MKT 610 Module 6 Milestone Two: Media Plan and Promotional Budget
- BMB 670 Module 10 Final Project: A Leadership and Ethics Plan
- MGT 630 Module 4 Productivity Analysis Assignment: Ten Weeks of Panel Setting Data
- FIN 640 Module 8 Risk Measurement Assignment: Value at Risk and a March 2020 Replay
FIN 691 Module 9 questions, answered
Where can I find a free FIN 691 Module 9 Milestone Three sample?
The full FIN 691 Module 9 milestone is on this page, with a peer review that found three model errors and stress tests of a dental group buyout.
How do you review a financial model?
Have a second person trace key outputs to inputs, check that formulas are consistent across rows, test extreme inputs, confirm all checks and record any errors and their corrections.
What is the difference between a sensitivity test and a stress test?
A sensitivity test changes one input by a set amount; a stress test combines several adverse changes that could plausibly happen together.
What lender measures matter in a buyout stress test?
Debt to EBITDA, which shows how many years of earnings the debt represents, and interest coverage, which shows how comfortably earnings pay interest.
Why combine adverse assumptions in a stress test?
Because bad outcomes tend to arrive together, and testing them one at a time understates how much a downturn could hurt.