| Course | FIN 640 Investment Analysis & Portfolio Management |
|---|---|
| Module | Module 8 |
| Paper type | graduate assignment measuring portfolio risk with value at risk and stress tests |
| Length | About 1,020 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MS Finance |
| Updated | October 2026 |
Free sample paper for FIN 640 Module 8
Measuring Risk in the Highlands Regional Health Operating Reserves
[Student Name]
Southern New Hampshire University
FIN 640: Investment Analysis and Portfolio Management
Module Eight Assignment
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Measuring Risk in the Highlands Regional Health Operating Reserves
Introduction
Milestone One set a floor of 150 days of cash on hand that a severe loss must not breach. This assignment measures the operating reserves' risk more formally, using value at risk, expected shortfall and two historical stress tests, and asks a practical question: in a crisis, could the system meet its obligations without selling growth assets at the bottom?
Value at Risk
Value at risk estimates the loss that a portfolio should exceed only with a small, stated probability over a given period. The parametric method assumes returns follow a normal distribution and uses volatilities and correlations. For the reserves, the inputs are assumptions based on long-run data: Tier 3, about $340 million of global stocks and real assets, with annual volatility near 15 percent; Tier 2, about $220 million of short bonds, near 3 percent; Tier 1, cash, near zero; and a correlation between stocks and short bonds of about 0.1.
Tier 3's dollar volatility is about $51 million and Tier 2's about $6.6 million. Combined with the correlation, the pool's annual dollar volatility is about $52 million. The expected one-year gain, at about 5.2 percent of $760 million, is roughly $40 million. At 95 percent confidence, value at risk is 1.645 times $52 million minus $40 million, about $46 million. At 99 percent confidence, it is 2.326 times $52 million minus $40 million, about $82 million.
A $46 million loss would take about 13 days off the system's cash cushion, from about 209 to about 196; an $82 million loss by about 23 days, to about 186. Both would leave the system far above its 150-day floor.
What Value at Risk Leaves Out
Value at risk says how often losses should exceed a threshold, not how large they will be when they do. It also depends on the normal distribution, which understates extreme market moves, and on correlations between assets that climb in a panic, which is exactly when a mix of holdings is supposed to help. Artzner et al. (1999) showed that value at risk can fail a basic property of a sound risk measure: combining two portfolios can produce a value at risk larger than the sum of their separate figures, so it can discourage diversification. Expected shortfall, the average loss in the worst cases beyond the threshold, does not have that flaw. Using historical stock returns with their fatter tails, the reserves' expected shortfall at 99 percent is perhaps $110 million to $130 million, well above the $82 million value at risk.
Stress Test One
Re-running the 2008 calendar year against today's holdings gives a growth tier down roughly two-fifths, about $135 million, and safe tiers up a little, so the pool would sit some $127 million lower before any rebalancing, a loss larger than the 99 percent estimate. Days cash on hand would fall to about 176 at the low point, still above the floor. The size of the 2008 loss relative to the 99 percent figure is a reminder that a once-in-a-century event under the normal model has happened several times in living memory.
Stress Test Two
The spring of 2020 tested hospitals in a way that a market stress alone does not. Between mid-February and late March, U.S. stocks fell about a third. Over the same weeks, scheduled surgeries were canceled across the region, and Highlands's patient revenue would have fallen by perhaps 30 percent for two months, an operating shortfall of roughly $70 million to $80 million before federal relief.
Two questions matter. First, could the system cover the shortfall without selling growth assets at the bottom? Tier 1 holds about sixty days of costs, roughly $200 million, so the answer is yes, with room to spare. Second, would anything else have failed? Ma et al. (2022) found that in March 2020 bond mutual funds faced heavy redemptions and sold their most liquid holdings, including Treasuries, while Haddad et al. (2021) documented severe dislocations even in investment-grade corporate bonds until the Federal Reserve intervened. Tier 2's high-quality short bonds could have been sold, but perhaps at temporary discounts, which is why the policy relies on Tier 1 cash first.
Liquidity Risk
Value at risk measures changes in price; it says nothing about whether an asset can be sold at that price when needed. In a crisis, the two risks combine. A fund that reports a daily price may suspend redemptions, a bond that quotes a bid may trade only at a steep discount and a hedge fund may impose a gate. For the reserves, the policy's liquidity rule, at least 70 percent sellable within five business days, is as important as any loss limit. Measuring it requires knowing each fund's redemption terms and the depth of the markets for its holdings, which the consultant will document annually. A portfolio with a modest value at risk can still fail its purpose if the cash cannot be reached in time.
Recommendations
First, the reserves should report expected shortfall at 99 percent alongside value at risk each quarter, and the committee should treat an expected shortfall above $150 million as a signal to review the Tier 3 weight. Second, the 2008 and March 2020 stress tests should be rerun each year with updated holdings and a revenue shock appropriate to the hospital's situation. Third, Tier 1 should never fall below fifty days of costs, which the policy already requires. Fourth, the committee should review liquidity terms of every fund in Tier 2 and Tier 3 annually, since a fund that can be sold daily in calm markets may gate or suspend redemptions in a crisis.
Conclusion
On a normal model, the reserves' one-year value at risk is about $46 million at 95 percent and $82 million at 99 percent, both well within the system's tolerance. Historical crises show losses beyond those figures, and the March 2020 replay shows that operating and market losses can arrive together. The reserves pass both stress tests because of their cash tier, which is the feature that protects the hospital when the statistics fail.
References
Artzner, P., Delbaen, F., Eber, J.-M., & Heath, D. (1999). Coherent measures of risk. Mathematical Finance, 9(3), 203-228. https://doi.org/10.1111/1467-9965.00068
Haddad, V., Moreira, A., & Muir, T. (2021). When selling becomes viral: Disruptions in debt markets in the COVID-19 crisis and the Fed's response. The Review of Financial Studies, 34(11), 5309-5351. https://doi.org/10.1093/rfs/hhaa145
Ma, Y., Xiao, K., & Zeng, Y. (2022). Mutual fund liquidity transformation and reverse flight to liquidity. The Review of Financial Studies, 35(10), 4674-4711. https://doi.org/10.1093/rfs/hhac007
What the FIN 640 Module 8 instructions ask for
The Module Eight assignment in FIN 640 commonly asks you to measure and manage portfolio risk. Expect to compute value at risk using a parametric or historical method, interpret it at stated confidence levels and horizons, explain its limitations, consider expected shortfall or similar measures and run stress tests based on historical crises or hypothetical scenarios. Many versions ask how the investor should respond to the results. A strong submission states its assumptions, computes the measures correctly, explains in plain terms what each figure means and does not mean, tests the portfolio against crises that matter for this investor and recommends limits or actions.
How this FIN 640 Module 8 risk measurement assignment example is built
The sample estimates the reserves' annual volatility at about $52 million, combining Tier 3's 15 percent volatility on $340 million with Tier 2's 3 percent on $220 million and a low correlation between them. Subtracting the expected gain of about $40 million, one-year value at risk is about $46 million at 95 percent confidence and about $82 million at 99 percent. Yet a replay of 2008 would cost about $127 million before rebalancing, beyond the 99 percent figure, because market losses have fatter tails than the bell curve assumes. A March 2020 replay, with stocks down about a third in five weeks and patient revenue down sharply, shows that sixty days of cash in Tier 1 would have covered operating shortfalls without selling growth assets. The paper recommends expected shortfall and stress limits alongside value at risk.
Where the FIN 640 Module 8 rubric puts the points
Risk measurement assignments are generally marked on the correct calculation of value at risk and related measures, clear statement of assumptions, accurate interpretation, recognition of limitations, relevant stress testing and practical recommendations. High-scoring papers show the volatility and correlation inputs, explain that value at risk is a threshold rather than a worst case, compare it with historical losses, consider liquidity as well as price risk and tie the results to limits or actions. Points come off for treating value at risk as the maximum loss, for normal-distribution results presented without caveat, for stress tests that ignore the investor's operating situation and for advice that the figures in the paper never actually support.
FIN 640 Module 8 help: the mistakes that cost points
The most important sentence in a value at risk paper explains what the number does not say. A 99 percent one-year value at risk of $82 million means losses should exceed that only one year in a hundred if the model is right, not that losses cannot exceed it. Markets have fatter tails than the bell curve, and correlations rise in crises, so complement the calculation with expected shortfall, the average loss beyond the threshold, and with historical stress tests. Choose crises that matter to the investor, and include its operating side: a hospital loses revenue in some crises as markets fall. Finish by asking whether the investor could meet its obligations without selling at the bottom, which is the risk that matters most.
Get FIN 640 Module 8 written to your instructions
Send the FIN 640 Module 8 directions and the portfolio or pool in your case. We compute value at risk and expected shortfall, replay the crises that matter for this investor and show where the bell-curve numbers understate the danger. Usually two days; the first assignment is free. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More FIN 640 papers and related MS Finance samples
- FIN 640 Module 1 Discussion: Three Pools, Three Jobs
- FIN 640 Module 2 Risk and Return Assignment: What History Says Each Pool Can Expect
- FIN 640 Module 3 Milestone One: An Investment Policy Statement for Operating Reserves
- FIN 640 Module 4 Discussion: Should the System Keep Paying Active Managers?
- FIN 640 Module 5 Factor Analysis Assignment: What the Small-Cap Value Manager Is Really Selling
- FIN 640 Module 6 Milestone Two: Allocations for All Three Pools
- FIN 640 Module 7 Discussion: Should a Health System Invest in Tobacco and Vaping Makers?
- FIN 640 Module 9 Milestone Three: Performance Evaluation and a Manager Review
- FIN 640 Module 10 Final Project: The Report to the Finance Committee
- OL 655 Module 6 Discussion: Mentoring and Knowledge Transfer
- ACC 610 Module 10 Final Project: The Technical Accounting Memo Package
- MKT 618 Module 7 Discussion: Interpreting an A/B Test
- INT 620 Module 8 Milestone Two: Financing the Plant: Rupees, Dollars or Euros
FIN 640 Module 8 questions, answered
Where can I find a free FIN 640 Module 8 Risk Measurement sample?
The complete FIN 640 Module 8 paper is on this page, with value at risk, expected shortfall and 2008 and March 2020 stress tests for a hospital's reserves.
What is value at risk?
A loss threshold that a portfolio should exceed only with a stated small probability over a stated period, such as the loss exceeded in only one year out of twenty at 95 percent confidence.
What is expected shortfall?
The average loss in the cases beyond the value at risk threshold; it describes how bad the bad outcomes are and is considered a more complete risk measure.
Why do stress tests matter if you have value at risk?
Because value at risk relies on statistical assumptions that understate extreme losses, while stress tests show what actual crises would do to the portfolio.
What happened to hospitals financially in March 2020?
Elective procedures were halted, cutting revenue sharply, while markets fell, so many hospitals faced operating losses and investment losses at the same time until federal relief arrived.