FIN 640 Module 6 Milestone Two Example

Reviewed by Portia Lambrick, MBA

This FIN 640 Module 6 Milestone Two sample sets strategic asset allocations for three pools with different purposes, including a liability-driven approach for a pension plan. SNHU FIN 640 (FIN-640) assigns this second milestone in Module Six of its MS Finance course on investment analysis and portfolio management. For the composite Highlands Regional Health, the paper keeps the operating reserves in the tiers set in Milestone One, rebuilds the frozen pension plan around bonds that move with its liabilities and a glide path tied to funded status, and designs the foundation endowment's mix, testing each against its required return and its tolerance for loss.

CourseFIN 640 Investment Analysis & Portfolio Management
ModuleModule 6
Paper typegraduate milestone on strategic asset allocation and liability-driven investing
LengthAbout 1,040 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMS Finance
UpdatedOctober 2026

Free sample paper for FIN 640 Module 6

1

Strategic Asset Allocation for the Three Highlands Regional Health Pools

[Student Name]

Southern New Hampshire University

FIN 640: Investment Analysis and Portfolio Management

Milestone Two

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingThe hospital system is a teaching composite; expected returns and durations are planning assumptions for illustration.
2

Strategic Asset Allocation for the Three Highlands Regional Health Pools

Introduction

Milestone One set the policy for the operating reserves; this milestone sets allocations for all three pools. Each is judged against its own purpose: the reserves against safety and days of cash, the pension against its promises to retirees and the endowment against its spending and permanence.

What this page is doingThree pools, three allocations.
3

Operating Reserves

The reserves keep the three tiers from Milestone One: about $200 million in cash and Treasury bills, about $220 million in bonds maturing within five years and about $340 million in growth assets, mostly global stock index funds and publicly traded real assets. The expected return is about 5.2 percent, and a 2008-style loss would leave about 181 days of cash, above the 150-day floor. No private investments are added, because the reserves must be available in a crisis.

What this page is doingThe tiers stand.
4

Pension Plan

The frozen pension plan owes benefits worth about $520 million, discounted at about 5.4 percent, with a duration near 12 years: a one-point fall in interest rates would raise the liability by about 12 percent, roughly $62 million. Today the plan holds $455 million, about 65 percent in stocks and 35 percent in intermediate bonds. If rates fell a point while stocks were flat, its funded status would drop several points even though nothing had gone wrong with its investments. Sharpe and Tint (1990) proposed measuring a pension's risk by the surplus, assets minus liabilities, rather than by assets alone, which is the basis of liability-driven investing.

The proposed allocation puts about 60 percent of assets, $273 million, in long high-grade corporate and Treasury bonds with a duration near 14 years. Their sensitivity, $273 million times 14, is about 61 percent of the liabilities' sensitivity, $520 million times 12, so roughly 60 percent of the plan's interest rate risk is hedged. The other 40 percent stays in return-seeking assets: 30 percent global stocks and 10 percent high-yield and other credit. The expected return is about 5.8 percent, above the 5.4 percent liability growth rate, and together with planned contributions of about $10 million a year, it should close the funding gap within about seven years.

A glide path will move the plan toward safety as it improves. At 92 percent funded, the hedge rises to 70 percent of rate risk; at 100 percent, to 85 percent, with return-seeking assets falling to 20 percent. Once fully funded, the system could consider buying annuities from an insurer for retirees already receiving benefits, removing that part of the risk entirely.

What this page is doingMatching assets to promises.
5

Foundation Endowment

The endowment's $140 million must support spending indefinitely and can bear short-term losses.

Proposed endowment allocation

Asset classWeightExpected returnLiquidity
Global public stocks50%About 7.2%Daily
Private equity (buyout and growth funds)15%About 9.5%Locked up 10 or more years
Private real assets (infrastructure, real estate)10%About 7.5%Locked up 7 or more years
Diversifiers (hedge funds with low stock correlation)10%About 5.5%Quarterly
High-grade bonds15%About 4.5%Daily
Total100%About 7.0%

Harris et al. (2014) found that U.S. buyout funds outperformed public stock markets by roughly 3 percentage points a year on average after fees, using public market equivalents, though venture results were more mixed and dispersion among funds was wide. The endowment can hold 25 percent in private assets because, even if public stocks fell 40 percent, its liquid assets would cover more than five years of spending. Brown et al. (2010) found that differences in endowment returns are driven largely by asset allocation policy rather than manager selection or timing, which is why this milestone concentrates on the mix rather than the managers.

The expected return of about 7 percent falls short of the 7.5 percent required to sustain 4.5 percent spending after inflation and costs. Rather than add more risk, the paper recommends reducing the spending rate to 4.25 percent over three years, which lowers the requirement to about 7.25 percent, within reach.

What this page is doingBuilt for permanence.
6

Testing the Allocations

Each allocation was tested against a replay of 2008. The reserves, as Milestone One showed, would fall about $100 million after rebalancing and keep about 181 days of cash. The pension's assets would fall about 14 percent, but because long bond yields fell sharply that year, its liabilities would rise; with 60 percent of rate risk hedged, its funded status would drop about eight points, to around 80 percent, against more than twenty points under the old mix. The endowment would fall about 27 percent on paper, more in public stocks and less in reported private values, which are marked with a lag. Spending at 4.25 percent of a twelve-quarter average would continue without selling private holdings, though the fund would take several years to recover in real terms. A 2022-style year, with stocks and bonds falling together, would hurt the pension's bond hedge in absolute terms, but its liabilities would fall even more as rates rose, so its funded status would improve, which is exactly what liability matching is meant to achieve.

What this page is doingA bad year for each pool.
7

Liquidity in the Endowment

Private equity and private real assets are bought through commitments that funds draw over several years. To reach 25 percent of the endowment, the foundation would commit roughly $12 million a year for four years, sized so that capital calls can be met from bond holdings and spending can continue even if distributions from older funds stop, as they did in 2009. A commitment schedule, rather than a target weight alone, keeps the private allocation from overshooting in a falling market.

What this page is doingCommitments and capital calls.
8

How the Pools Fit Together

Across all three pools, about $1.36 billion, the combined public stock exposure is about 35 percent and private investments about 3 percent of the total. A severe market decline would hit the endowment hardest, the reserves moderately and the pension least, because of its bond hedge. That ordering matches the pools' purposes.

What this page is doingThe system as a whole.
9

Conclusion

The reserves keep their three tiers. The pension hedges about 60 percent of its interest rate risk with long bonds, follows a glide path as funding improves and keeps enough return-seeking assets to close its gap with contributions. The endowment holds a diversified mix with a quarter in private assets for an expected return near 7 percent, paired with a modest cut in its spending rate.

What this page is doingThe allocations.
10

References

Brown, K. C., Garlappi, L., & Tiu, C. (2010). Asset allocation and portfolio performance: Evidence from university endowment funds. Journal of Financial Markets, 13(2), 268-294. https://doi.org/10.1016/j.finmar.2009.12.001

Harris, R. S., Jenkinson, T., & Kaplan, S. N. (2014). Private equity performance: What do we know? The Journal of Finance, 69(5), 1851-1882. https://doi.org/10.1111/jofi.12154

Sharpe, W. F., & Tint, L. G. (1990). Liabilities: A new approach. The Journal of Portfolio Management, 16(2), 5-10. https://doi.org/10.3905/jpm.1990.409248

What the FIN 640 Module 6 instructions ask for

Milestone Two in FIN 640 usually asks you to develop a strategic asset allocation for the case investor, justify it with expected returns, risks and correlations and show that it meets the objectives in the investment policy. When the investor has liabilities, such as a pension plan, expect to consider liability-driven investing, which measures risk against the liabilities rather than in absolute terms. Many versions ask about alternatives such as private equity and real assets. A strong milestone sets a separate allocation for each pool with its own purpose, shows expected return and a downside measure for each, explains how pension assets are matched to liabilities and addresses the liquidity and evidence behind any alternatives.

How this FIN 640 Module 6 milestone two example is built

The sample keeps the reserves in Milestone One's three tiers, with an expected return near 5.2 percent. For the pension, whose $520 million of liabilities have a duration near 12 years, it moves about 60 percent of assets into long high-grade bonds with a duration near 14, hedging about 60 percent of the plan's interest rate risk, and keeps 40 percent in return-seeking assets; a glide path raises the hedge as funded status climbs from 88 percent toward 100. For the endowment, it proposes 50 percent global stocks, 15 percent private equity, 10 percent private real assets, 10 percent diversifiers and 15 percent bonds, with an expected return near 7 percent. Because that falls short of the 7.5 percent needed, it recommends a 4.25 percent spending rate.

Where the FIN 640 Module 6 rubric puts the points

The milestone rubric commonly scores the fit of each allocation to its pool's objectives, the quality of return, risk and correlation assumptions, the treatment of liabilities through liability-driven investing, the evidence and liquidity analysis behind alternatives and the consistency with the investment policy. High marks go to papers that set distinct allocations by purpose, quantify interest rate hedging for the pension, explain a glide path, test downside risk and are candid when expected returns fall short of needs. Points come off for one allocation applied to all pools, for pension portfolios judged only by return, for alternatives added without liquidity analysis and for ignoring a gap between required and expected return.

FIN 640 Module 6 help: the mistakes that cost points

The step students most often skip is measuring a pension's risk against its liabilities. A pension plan holding mostly stocks may look diversified, but if rates fall its liabilities rise while its stocks may not, so its funded status can collapse. Match part of the assets to the liabilities' duration, and express the result as the share of interest rate risk hedged. Add a glide path that hedges more as the plan becomes better funded, since the plan then has less need to take risk. For an endowment, weigh the evidence on private equity and its illiquidity, and check that spending can continue through a bad stretch without forced sales. Finally, compare each pool's expected return with its requirement and say what gives if they do not match.

Get FIN 640 Module 6 written to your instructions

Upload the FIN 640 Milestone Two guidelines with each pool's goals, liabilities and current holdings. We design a mix for every pool, match pension bonds to the liabilities, set a glide path and test each allocation against its required return. Ready in about two days; a first milestone carries no fee. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More FIN 640 papers and related MS Finance samples

FIN 640 Module 6 questions, answered

Where can I find a free FIN 640 Module 6 Milestone Two sample?

The full FIN 640 Module 6 milestone is posted here, setting allocations for a hospital's reserves, a liability-matched pension and a foundation endowment.

What is liability-driven investing?

An approach that invests a pension plan's assets with its liabilities in mind, typically holding bonds whose value moves with the liabilities so that funded status is protected when interest rates change.

What is a pension glide path?

A schedule that shifts assets from return-seeking investments toward liability-hedging bonds as the plan's funded status improves.

Do endowments benefit from private equity?

Research finds buyout funds have, on average, outperformed public stocks after fees, but results vary widely, the investments are illiquid and the best results have been concentrated among top managers.

How do you calculate a pension's interest rate hedge ratio?

Divide the interest rate sensitivity of the hedging assets, value times duration, by the sensitivity of the liabilities; that share of the rate risk is offset.