| Course | MKT 618 Marketing Analytics |
|---|---|
| Module | Module 7 |
| Paper type | graduate discussion post interpreting the results of a marketing experiment, including a result that shows no clear effect |
| Length | About 350 words, 3 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MS in Marketing |
| Updated | October 2026 |
Free sample paper for MKT 618 Module 7
Module Seven Discussion
The Free-Shipping Test Came Back Flat
For eight weeks, Bobbin and Feed's website randomly showed half its visitors free shipping on orders of $35 or more and half the usual threshold of $50. The owner expected the lower threshold to bring in more orders. About 118,000 visitors were split evenly. In the $35 group, 3.1 percent placed an order; in the $50 group, 3.0 percent. Average order value was $59 in the $35 group and $66 in the $50 group. The owner's verdict was that the test failed and he would try something else.
Kohavi et al. (2009), describing years of controlled experiments at large websites, emphasized that many ideas confidently expected to help have no measurable effect, and that the value of testing lies in learning this before a change is rolled out. A difference of 0.1 percentage point on about 59,000 visitors per group is well within what chance would produce; the test, large enough to detect a lift of about half a point, found no sign of one. That answers the question: a lower threshold does not bring meaningfully more orders.
It also cost money. Lewis et al. (2006), studying an online retailer that experimented with many shipping-fee schedules, found consumers very sensitive to shipping charges and threshold offers effective at generating additional sales, but noted that the lost shipping revenue could outweigh the gain. At Bobbin and Feed, orders between $35 and $50, previously paying shipping, now shipped free, and many customers who would have added a pack of needles to reach $50 stopped at $35, which explains the lower average order.
Shehu et al. (2020) found that free-shipping promotions led customers to buy riskier items and raised return rates. Parts buyers who are unsure whether a presser foot fits their machine may be exactly that kind of buyer. Before closing the test, the shop should compare return rates by group over the next month.
Keep the $50 threshold, finish the returns check and treat the test as a success: it prevented a costly change.
What has a test with no clear winner taught your organization?
References
Kohavi, R., Longbotham, R., Sommerfield, D., & Henne, R. M. (2009). Controlled experiments on the web: Survey and practical guide. Data Mining and Knowledge Discovery, 18(1), 140-181. https://doi.org/10.1007/s10618-008-0114-1
Lewis, M., Singh, V., & Fay, S. (2006). An empirical study of the impact of nonlinear shipping and handling fees on purchase incidence and expenditure decisions. Marketing Science, 25(1), 51-64. https://doi.org/10.1287/mksc.1050.0150
Shehu, E., Papies, D., & Neslin, S. A. (2020). Free shipping promotions and product returns. Journal of Marketing Research, 57(4), 640-658. https://doi.org/10.1177/0022243720921812
What the MKT 618 Module 7 instructions ask for
The seventh MKT 618 discussion typically asks you to design or interpret a marketing experiment, such as an A/B test of a price, offer, email or web page, and to explain what the results mean. Expect to describe the test, the groups, the measure and the result, judge whether any difference is likely to be real or due to chance, and say what decision follows. Strong posts look beyond the headline metric to the outcome that matters, such as profit rather than conversion, consider side effects such as returns or cannibalization and treat a result with no clear effect as evidence rather than failure. They also check that the test was run properly, with random assignment and enough time.
How this MKT 618 Module 7 discussion example is built
The sample interprets an eight-week test at Bobbin and Feed Supply, a composite online sewing parts shop, in which website visitors were randomly assigned to free shipping from $35 or from $50. Conversion was 3.1 against 3.0 percent, a difference well within chance, while average order value fell from $66 to $59 and shipping costs rose. Lewis, Singh and Fay on shipping-fee schedules, Shehu, Papies and Neslin on how free-shipping promotions raise returns and Kohavi and colleagues on reading online experiments support the conclusion: the lower threshold costs money without adding orders. The post recommends keeping $50, checking returns before closing the test, and asks classmates what a null result has taught them.
Where the MKT 618 Module 7 rubric puts the points
For this experiment discussion, grading usually looks at a clear description of the test, correct interpretation of whether the difference is meaningful, attention to the outcome that matters and to side effects, a sound decision and engagement with peers. High-scoring posts report the numbers with some sense of uncertainty, connect them to profit and explain what the result rules out. Posts lose credit when they declare a winner from a tiny difference, judge only by conversion rate, ignore whether the test was randomized or call a flat result a waste. A reply that asks what a classmate's test would have needed to detect a real effect adds the most.
MKT 618 Module 7 help: the mistakes that cost points
Describe the test plainly: what was changed, who saw each version, for how long and what was measured. Report the results for each group with the numbers behind any percentages. Ask whether the difference could be chance, using a confidence interval or test if you can. Then look at the outcome that matters to the business, usually profit, not just clicks or conversions, and check side effects such as returns or smaller orders. If the result is flat, say what it rules out and whether the test was large enough to detect a meaningful effect. State the decision. Ask classmates about a time a test surprised them.
Get MKT 618 Module 7 written to your instructions
Paste the MKT 618 Module 7 prompt and the test results you are interpreting. We read the numbers, judge whether the difference is real, explain what a flat or surprising result still tells you and set out the decision, with research on experiments and pricing. The first post is written free and normally arrives within two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More MKT 618 papers and related MS in Marketing samples
- MKT 618 Module 1 Discussion: Marketing Metrics and Analytics That Matter
- MKT 618 Module 2 Marketing Metrics Assignment: Marketing Metrics and Dashboard
- MKT 618 Module 3 Milestone One: Business Question and Data Plan
- MKT 618 Module 4 Discussion: Correlation, Causation and Marketing Data
- MKT 618 Module 5 Customer Analytics Assignment: Customer Lifetime Value and RFM Segmentation
- MKT 618 Module 6 Milestone Two: Analysis Results: Drivers of Weekly Orders
- ACC 550 Module 6 Joint Cost Assignment: Halves, Pieces, Meal and Shells From One Pound
- MGT 600 Module 7 Performance Metrics Assignment: What to Measure at Each Branch
- ACC 610 Module 6 Milestone Two: Impairment of a Service Center and of Goodwill
- MKT 555 Module 5 Content Evaluation Assignment: Constructing and Evaluating Social Media Content
MKT 618 Module 7 questions, answered
Where can I find a free MKT 618 Module 7 Discussion sample?
This page carries the complete MKT 618 Module 7 post interpreting a free-shipping threshold test at a composite online sewing parts shop.
What does it mean when an A/B test shows no significant difference?
The test did not detect an effect large enough to rule out chance; if it was big enough, it suggests the change has little or no effect, which is itself useful for a decision.
Does free shipping increase online sales?
Research on an online retailer found shoppers very sensitive to shipping fees and threshold offers effective at raising sales, though the lost shipping revenue can outweigh the gain.
Does free shipping increase product returns?
Studies found free-shipping promotions encourage riskier purchases, raising the share of items returned, so returns should be counted when judging the promotion.
How long should an online marketing test run?
Long enough to include full weekly cycles and reach a sample large enough to detect the smallest effect that would change the decision, often several weeks for a small retailer.