| Course | MKT 555 Social Media Marketing |
|---|---|
| Module | Module 5 |
| Paper type | graduate assignment constructing a set of test posts, running them and evaluating the results against engagement research and the plan's goals |
| Length | About 1,010 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MS in Marketing |
| Updated | October 2026 |
Free sample paper for MKT 555 Module 5
Twelve Test Posts and What They Showed: Evaluating Content for Laurel Fork Banjo Company
[Student Name]
Southern New Hampshire University
MKT 555: Social Media Marketing
Content Evaluation Assignment
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Twelve Test Posts and What They Showed: Evaluating Content for Laurel Fork Banjo Company
Introduction
Earlier evidence from Module 2 hinted that Laurel Fork's process, player and sound posts drew far more engagement than its finished-banjo and sale posts, but those posts were few, irregular and on different platforms. Before committing a content budget, the shop needed a fairer comparison. This assignment describes twelve test posts, how they were run, what happened and what the results mean for the content plan in Milestone Two.
The Test Posts
Four content types were built, with three posts of each. All were posted between 7 p.m. and 9 p.m. Eastern time, when the audit showed the young audience most active, on Instagram as short videos, on the new video channel as shorts and on Facebook, over six weeks.
Content types tested
| Type | What each post contained | Example caption |
|---|---|---|
| Sound clip | One minute of a tune played on a finished banjo, opening on the first note; logo at the end; price in caption | "Big Pine in walnut, tuned to double C. Cluck Old Hen." |
| Workshop process | Forty seconds of one step, such as shaping a neck, with the maker explaining one choice | "Why we quarter-saw our necks, in forty seconds." |
| Player story | A young player, filmed at a jam, on why they play and what they play | "Maya learned on her phone. This is her first jam with a real banjo." |
| Product and price | A still photo of a finished banjo with specifications and price | "Spring Creek 11, maple, 11-inch pot, $1,950." |
The player stories featured three players from the Milestone One interviews who agreed to be filmed and to have their first names used; none was paid, and each played a Laurel Fork banjo lent for the jam, which the captions said plainly.
Results
Six-week results, three posts per type, all platforms combined
| Type | Views | Average completion | Shares | Saves | Inquiries from under-40 players |
|---|---|---|---|---|---|
| Sound clip | 41,200 | 68% | 1,140 | 620 | 9 |
| Workshop process | 23,900 | 61% | 410 | 880 | 6 |
| Player story | 30,600 | 57% | 690 | 340 | 17 |
| Product and price | 6,100 | Not applicable | 38 | 120 | 4 |
Sound clips reached the most people and were shared most. Workshop process clips were saved most, which in this audience usually means a player wanting to show someone else or come back to it. Player stories produced the most inquiries from young players by a wide margin. Product and price posts trailed on every measure.
Why Sound Spread
Tellis et al. (2019), studying the sharing of video ads across platforms in two field studies, found that information-focused content reduced sharing except in risky contexts, that positive emotions such as amusement, excitement, inspiration and warmth increased it, that drama elements such as surprise and characters helped, and that prominent brand placement, early, long or persistent, reduced sharing. The sound clips fit almost every finding: they open on a tune, carry warmth and a little surprise for anyone who has only heard a cheap banjo, and leave the logo until the end. The price-only posts are pure information with the brand in the center of the frame.
Why Stories Brought Inquiries
A study of brand fan pages that coded 355 posts across six product categories (de Vries et al., 2012) reported that lively, participatory posts collected more likes, that a post placed at the top of the page gained popularity and that the drivers of likes differed from the drivers of comments; questions, for instance, raised comments but lowered likes. Our player stories invited the most comments, many of them questions such as "Where can I try one?" and "What's the neck like for small hands?", and those questions turned into inquiries when the owner answered them.
Lee et al. (2018) found that informative content performed better when combined with brand personality than when it appeared alone. The player stories combined both: warmth and character, plus useful facts in the caption about the model, the price and where to try one. That combination appears to be what moved young players from watching to asking.
What the Comments Revealed
The table leaves out what turned out to matter most in the test: the questions people typed. Across the twelve posts, viewers left 312 comments, and 94 of them asked something. The questions fell into a few clear groups. The largest, 31 questions, was about where to try a banjo, usually from players who lived nowhere near a store that carries Laurel Fork. Next came questions about neck shape and width, mostly from players with small hands, then about the difference between the 11-inch and 12-inch pots, then about the wait for custom orders and finally about price compared with factory banjos.
Those questions are a content plan in themselves. Each one is a short answer video, a forum reply and a caption waiting to be written, and each comes from the exact audience the plan targets. They also confirm something the interviews suggested: the barrier for young players is less about wanting a better banjo than about knowing where to hold one and whether it will suit them. Content alone cannot solve the first problem, which is why the test-play goal in Milestone One matters as much as any social measure.
Limits
Twelve posts over six weeks are a small sample. Platforms show posts to different people depending on early reactions, so one strong post can lift a whole type. The player stories may have drawn inquiries partly because the players were likable rather than because stories work in general. And inquiries are not sales; Milestone Three will set up a test that follows inquiries to purchase.
Content Rules
First, open every video on sound or hands, never on the logo. Second, give each week at least one player story, with the model, price and a place to try one in the caption. Third, use process clips to build saves and trust, especially about neck construction, which forum members care about most. Fourth, stop stand-alone price posts; put price in captions instead. Fifth, answer every question in comments within a day under the owner's name, since that is where interest turns into inquiries.
References
de Vries, L., Gensler, S., & Leeflang, P. S. H. (2012). Popularity of brand posts on brand fan pages: An investigation of the effects of social media marketing. Journal of Interactive Marketing, 26(2), 83-91. https://doi.org/10.1016/j.intmar.2012.01.003
Lee, D., Hosanagar, K., & Nair, H. S. (2018). Advertising content and consumer engagement on social media: Evidence from Facebook. Management Science, 64(11), 5105-5131. https://doi.org/10.1287/mnsc.2017.2902
Tellis, G. J., MacInnis, D. J., Tirunillai, S., & Zhang, Y. (2019). What drives virality (sharing) of online digital content? The critical role of information, emotion, and brand prominence. Journal of Marketing, 83(4), 1-20. https://doi.org/10.1177/0022242919841034
What the MKT 555 Module 5 instructions ask for
The Module 5 assignment in MKT 555 generally asks you to construct social media content for your organization and evaluate it. Some versions ask for sample posts with a rationale; others ask you to compare content types using real or projected results. Expect to show the content itself, explain the audience, platform and goal for each piece and evaluate performance with suitable measures. A strong assignment sets up a fair comparison, for example the same number of posts per type at similar times, uses measures that match the goal, such as shares for reach and inquiries for sales, and explains results with research rather than guesswork. It ends with rules the organization can apply to future content.
How this MKT 555 Module 5 content evaluation assignment example is built
The sample describes twelve test posts for the composite Laurel Fork workshop: three each of one-minute sound clips, workshop process clips, player stories and plain product posts with price, run over six weeks on Instagram, a new video channel and Facebook. It reports views, completion rate, saves, shares and inquiries by type. Sound clips earned the most shares, player stories the most inquiries and price-only posts the least of everything. Tellis and colleagues on what drives sharing of video ads, de Vries, Gensler and Leeflang on brand post popularity and Lee, Hosanagar and Nair on combining information with personality explain the pattern, and five content rules follow.
Where the MKT 555 Module 5 rubric puts the points
Content assignments in MKT 555 tend to be graded on the quality and fit of the content created, the soundness of the evaluation method, the choice of measures, the interpretation of results using research and the practical recommendations, along with writing and APA style. Strong work shows the content, compares like with like, reports results in a table and separates measures of reach from measures of business response. Work loses credit when the content is described but not shown, when one post is compared with another posted at a different time on a different platform, when likes are treated as success on their own or when the recommendations would fit any organization.
MKT 555 Module 5 help: the mistakes that cost points
Decide the question first: which kinds of content work best for your audience and goal. Build several posts of each type so one lucky post does not decide the answer, and post them at similar times. Choose measures that match the goal: shares or saves for reach and interest, clicks or inquiries for sales. Report results in a table by type, with the numbers behind any percentages. Explain the pattern with research on emotion, information and brand placement. Be honest about the limits of a small test, such as few posts or a short period. Finish with a handful of rules your organization can follow in the content plan.
Get MKT 555 Module 5 written to your instructions
Send the MKT 555 Module 5 guidelines and the posts or ideas you are working with. We build test content for your audience, set up a fair comparison, report the results by content type and explain them with research on sharing and engagement. Your first content evaluation is written without charge, usually inside two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More MKT 555 papers and related MS in Marketing samples
- MKT 555 Module 1 Discussion: The Possibilities and Limits of Social Media
- MKT 555 Module 2 Social Media Audit Assignment: Social Media Audit
- MKT 555 Module 3 Milestone One: Audience Analysis and Social Media Goals
- MKT 555 Module 4 Discussion: Content That Earns Attention
- MKT 555 Module 6 Milestone Two: Content Strategy, Calendar and Creators
- ACC 550 Module 6 Joint Cost Assignment: Halves, Pieces, Meal and Shells From One Pound
- FIN 640 Module 8 Risk Measurement Assignment: Value at Risk and a March 2020 Replay
- ACC 692 Module 2 Interview Planning Assignment: Who to Talk To, and in What Order
- MGT 630 Module 8 Milestone Two: The Productivity and Equipment Plan
MKT 555 Module 5 questions, answered
Where can I find a free MKT 555 Module 5 content evaluation sample?
This page carries the complete MKT 555 Module 5 assignment: twelve test posts for a composite banjo workshop, the results by content type and the content rules that follow.
How do I evaluate social media content?
Compare several posts of each content type under similar conditions, using measures that match the goal, such as shares for reach and inquiries for sales, and explain results with research.
What drives sharing of video content?
Research on video ads found positive emotions such as amusement, excitement, inspiration and warmth increase sharing, while heavy information and early, prominent branding reduce it.
Does putting the brand logo early in a video hurt it?
Studies of video ad sharing found that prominent brand placement, such as early or persistent logos, reduced sharing, so many brands introduce the logo later.
How many test posts do I need to compare content types?
More than one per type; a few posts of each type at similar times give a fairer comparison, though small tests still show direction rather than proof.