FIN 691 is SNHU’s Financial Modeling course. It centers on financial modeling: model design and error control, driver-based forecasting, integrated three-statement models, debt schedules and circularity, discounted cash flow valuation, leveraged buyout models with sources and uses and returns, scenario and Monte Carlo analysis, acquisition modeling, model audit and a model-based recommendation. Every module below opens a full sample paper or takes a free request for one; searches like "fin 691 module 3", "FIN691 sample paper" and "FIN 691 milestone example" land on this page.
What FIN 691 is really about
FIN 691 is SNHU's graduate course in financial modeling, and the models that earn the most credit separate inputs from calculations, build revenue from operating drivers rather than growth rates, make every statement tie with visible checks and show how the answer moves when the key assumptions do. The best papers also say plainly where the model is weakest.
The samples follow one composite company: Mesquite Ridge Dental Partners of Phoenix, Arizona, with 38 clinics, about $190 million of revenue and $34 million of EBITDA, being considered by a private equity firm for a buyout at about $374 million with roughly half of it borrowed and a plan to buy four small practices a year. The company and its figures are illustrative.
What FIN 691’s modules ask for
Across ten modules, FIN 691 commonly asks for discussions on model reliability, circularity and simulation, assignments on model design, valuation and acquisition modeling, three milestones on a three-statement model, a leveraged buyout model and a model review, and a final model-based recommendation in Module Ten.
Where students lose points in FIN 691
FIN 691 work loses the most credit on models that hide their logic: hard-coded numbers inside formulas, revenue grown at a single rate with no drivers, balance sheets that do not balance or that are forced to balance with a plug, and buyout returns reported without showing how much comes from debt, growth and a higher exit multiple.
The FIN 691 drawers
FIN 691 Module 1 Discussion example
The first FIN 691 post asks why anyone should believe a spreadsheet, using the model a private equity analyst must build for Mesquite Ridge Dental Partners: research finding errors in most operational spreadsheets, the 2013 discovery that a famous debt and growth study had left five countries out of an average, and a habit of hard-coding numbers inside formulas; it proposes four disciplines, separate inputs, one formula per row, visible checks and a second reviewer, drawing on Herndon, Ash and Pollin, Powell, Baker and Lawson, and Graham and Harvey, and asks classmates which control they would never skip. Full sample paper, read it free.
FIN 691 Module 2 Model Design Assignment example
Module Two lays out the Mesquite Ridge workbook before any statement is built: separate sheets for inputs, clinic operations, the three statements, debt, valuation and checks; revenue built from clinics, patient visits per clinic and revenue per visit by payer, about 14,500 visits at roughly $345 each per clinic, with chair capacity and dentist and hygienist hiring as limits; same-clinic growth near 5 percent split into visits and price; and a naming, color and version convention, drawing on research about how long growth lasts and on private equity's spread into health care. Full sample paper, read it free.
FIN 691 Module 3 Milestone One example
The first milestone, due in Module Three, links Mesquite Ridge Dental Partners' income statement, balance sheet and cash flow for three forecast years in the management case before any buyout debt: revenue rising from $190 million to about $245 million on 5 percent same-clinic growth and two new clinics a year, EBITDA from about $37 million to $46 million, interest on average debt as the old loan amortizes $8 million a year, cash flow built from net income, depreciation and working capital, a balance sheet that balances in every year without a plug and a checks block that would flag any break, citing Dechow, Barth, Cram and Nelson, and Nissim and Penman. Full sample paper, read it free.
FIN 691 Module 4 Discussion example
Module Four's post takes up the loop that appears once the Mesquite Ridge buyout model sweeps spare cash to repay debt: interest depends on average debt, debt depends on cash left after interest, so the spreadsheet chases its own tail; the post compares turning on iterative calculation, using beginning balances and adding a circuit breaker, and recommends the breaker plus a check, noting how small the error from beginning balances is at $187 million of debt and why a model that silently iterates can hide mistakes, citing Powell, Baker and Lawson, Herndon, Ash and Pollin, and Kaplan and Strömberg. Full sample paper, read it free.
FIN 691 Module 5 Valuation Assignment example
Module Five adds a valuation sheet to the Mesquite Ridge model: unlevered free cash flow from EBITDA less capital spending, taxes on operating profit and working capital, five forecast years growing about 5 percent, a 9.5 percent cost of capital and 3 percent terminal growth give an enterprise value near $371 million, about 10.9 times EBITDA and close to the $374 million asking price, with three-quarters of the value in the terminal year; a two-way data table runs the value from about $306 million to $475 million, and an exit-multiple cross-check and a mid-year adjustment are explained, citing Kaplan and Ruback, Liu, Nissim and Thomas, and Fama and French. Full sample paper, read it free.
FIN 691 Module 6 Milestone Two example
The second milestone, due in Module Six, builds the Mesquite Ridge buyout: sources and uses with $374 million of enterprise value and $10 million of fees funded by $187 million of term debt at 5.5 times EBITDA and $197 million of sponsor equity, five years of 5 percent organic growth plus four practices a year bought at six times their $0.9 million of EBITDA, interest near 8.25 percent with a cash sweep, debt near 3 times EBITDA at exit and an 11 times exit that returns about 2.55 times the equity, an IRR near 21 percent, then a returns attribution showing how much comes from growth, debt paydown and buying small practices cheaply, citing Kaplan and Strömberg, Guo, Hotchkiss and Song, and Harris, Jenkinson and Kaplan. Full sample paper, read it free.
FIN 691 Module 7 Discussion example
The seventh discussion compares two ways to show the investment committee the uncertainty in the Mesquite Ridge buyout: three hand-built scenarios, easy to explain but silent on likelihood, and a 10,000-run simulation that varies organic growth, the exit multiple, the number and price of add-ons and the interest rate, which gives a median IRR near 19 percent, a one-in-ten chance below about 11 percent and roughly a one-in-four chance of missing the fund's 15 percent hurdle; the post recommends both, with the simulation's assumptions shown, citing Graham and Harvey, Harris, Jenkinson and Kaplan, and Guo, Hotchkiss and Song. Full sample paper, read it free.
FIN 691 Module 8 Acquisition Modeling Assignment example
Module Eight models a single add-on practice the way the buyout plan will repeat it four times a year: a one-dentist practice with $3.6 million of revenue and $0.9 million of EBITDA bought for about $5.4 million, purchasing and insurer-contract gains of about $180,000 a year, $150,000 of integration cost and a 20 percent equity rollover to keep the selling dentist; valued at the platform's 11 times, it is worth about $11.9 million, but if the dentist leaves and a quarter of revenue follows, much of the gain disappears, which is why the model weights that risk and ties part of the price to retention, citing Moeller, Schlingemann and Stulz, Andrade, Mitchell and Stafford, and Gondi and Song. Full sample paper, read it free.
FIN 691 Module 9 Milestone Three example
The third milestone, due in Module Nine, has a second analyst review the Mesquite Ridge buyout model and then pushes it hard: the review finds a hard-coded tax rate on the returns sheet, a sum range that skipped the newest add-on year and a data table left stale, all fixed and logged; the stress tests show that flat organic growth with a 10 times exit cuts the IRR to about 9 percent while debt climbs to about $216 million, and a combined downside with 2 percent growth, only two add-ons a year, 10 percent interest and a 9 times exit leaves about 4 percent and 1.2 times the money, with interest covered under two times in year one, citing Powell, Baker and Lawson, Guo, Hotchkiss and Song, and Kaplan and Strömberg. Full sample paper, read it free.
FIN 691 Module 10 Final Project example
The closing memo asks the fund's investment committee to approve the Mesquite Ridge buyout on revised terms and backs every point with the reviewed model: the business alone is worth about what the fund would pay, so the return rests on four practices a year bought near six times; the base case earns about 20 percent, the simulation shows a one-in-four chance of missing the 15 percent hurdle and the combined downside about 4 percent; the memo recommends 5.0 times opening debt, an acquisition brake above 5 times debt to EBITDA, a cap on half the loan and retention terms for every selling dentist, citing Harris, Jenkinson and Kaplan, Moeller, Schlingemann and Stulz, and Kaplan and Ruback. Full sample paper, read it free.
Your classroom shows something else?
Southern New Hampshire University revises courses; module counts and deliverables shift between terms. Send what your classroom shows and the desk matches it exactly.
Using a FIN 691 sample the right way
Read a FIN 691 sample by tracing one number, say year-three EBITDA, back to the inputs that drive it and forward to the returns it produces. For FIN 691, send your case files and rubric; the first custom sample is free and usually takes about two days.
FIN 691 questions, answered
What does FIN 691 cover?
Financial modeling: model design, driver-based forecasting, three-statement integration, debt schedules, DCF valuation, LBO models, scenario and simulation analysis, acquisition models and model review.
What is the FIN 691 final project?
A recommendation backed by the full model, built from milestones on a three-statement model, a leveraged buyout model and a model review.
Is the dental group in the FIN 691 samples real?
No. Mesquite Ridge Dental Partners is an invented teaching case whose numbers were chosen so each module's model could build on the last.