FIN 691 Module 3 Milestone One Example

Reviewed by Portia Lambrick, MBA

This FIN 691 Module 3 Milestone One sample builds an integrated three-statement model in which every number flows from inputs and schedules, and the balance sheet balances without any plug line, as every forecast should. SNHU FIN 691 (FIN-691) assigns this first milestone in Module Three of its MS Finance course on financial modeling. For the composite Mesquite Ridge Dental Partners, the paper links three years of earnings, financial position and cash flows under the management case, before any buyout financing, explains each link, shows the debt schedule and working capital logic and sets out the checks that would flag an error.

CourseFIN 691 Financial Modeling
ModuleModule 3
Paper typegraduate milestone building an integrated three-statement financial model
LengthAbout 1,050 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMS Finance
UpdatedOctober 2026

Free sample paper for FIN 691 Module 3

1

Integrated Three-Statement Model for Mesquite Ridge Dental Partners

[Student Name]

Southern New Hampshire University

FIN 691: Financial Modeling

Milestone One

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingMesquite Ridge is an invented teaching case; forecast figures come from the course model's management-case inputs.
2

Integrated Three-Statement Model for Mesquite Ridge Dental Partners

Introduction

Before modeling a buyout, the analyst needs the company as it stands: the management case, with Mesquite Ridge's existing capital structure and its own growth plan. This milestone links the three statements for three forecast years from the drivers designed in Module Two. The buyout financing will be layered on in Milestone Two.

What this page is doingThe management case, linked.
3

Income Statement

Management-case income statement (millions of dollars)

Mesquite Ridge P&LForecast Y1Forecast Y2Forecast Y3
Revenue205.5223.8245.0
EBITDA37.441.446.1
Depreciation and amortization6.67.27.8
Interest expense2.52.01.4
Pretax income28.332.236.9
Taxes at 25%7.18.09.2
Net income21.224.227.6

Revenue comes from the clinic operations sheet: existing clinics grow 5 percent a year, about 2 percent from visits and 3 percent from revenue per visit, and two new clinics open each year, starting at 60 percent of mature volume and adding 20 percent a year until mature. EBITDA margin rises by about three-tenths of a point a year as corporate overhead is spread across more clinics. Depreciation is 3.2 percent of revenue, consistent with history.

What this page is doingFrom drivers to net income.
4

Supporting Schedules

Fixed assets. The opening balance of net property and equipment is $60 million. Each year, capital spending of 4 percent of revenue adds to it and depreciation subtracts, so net fixed assets rise slowly, from about $62 million to $65 million.

Working capital. Patient receivables, mostly from insurers, and supplies less payables and accrued wages net to about 5 percent of revenue. As revenue grows, working capital rises by about $1 million a year, a use of cash.

Debt. The existing $40 million term loan amortizes $8 million a year. Interest at 7 percent is charged on the average of the beginning and ending balance, so year-one interest is 7 percent of $36 million, about $2.5 million. Using the average introduces no circularity here because the repayment is scheduled, not taken from available cash; Module Four discusses the case where it is.

What this page is doingFixed assets, working capital and debt.
5

Cash Flow Statement

Management-case cash flow (millions of dollars)

LineYr 1Yr 2Yr 3
Net income21.224.227.6
Depreciation and amortization6.67.27.8
Increase in working capital(0.8)(0.9)(1.0)
Cash from operations27.030.534.4
Capital spending(8.2)(9.0)(9.8)
Debt repayment(8.0)(8.0)(8.0)
Change in cash10.813.516.6
Ending cash22.836.352.9

Cash flow from operations is derived from net income, the noncash depreciation charge and the change in working capital taken from the balance sheet, not estimated separately. Dechow (1994) showed that accounting earnings, adjusted through accruals, measure performance better than raw cash flow over short periods, while Barth et al. (2001) showed that knowing the cash and accrual parts of earnings separately makes future cash flow easier to predict; a three-statement model makes that split explicit.

What this page is doingExplaining the change in cash.
6

Balance Sheet

Management-case balance sheet (millions of dollars)

LineOpeningYr 1Yr 2Yr 3
Cash12.022.836.352.9
Working capital, net9.510.311.212.2
Property and equipment, net60.061.663.465.4
Goodwill and intangibles95.095.095.095.0
Total176.5189.7205.9225.5
Debt40.032.024.016.0
Equity136.5157.7181.9209.5
Total176.5189.7205.9225.5

Every line comes from a schedule or the cash flow statement: cash from ending cash, working capital and fixed assets from their schedules, debt from the debt schedule and equity from opening equity plus net income, since the management case assumes no dividends. Assets equal debt plus equity in every year without any balancing line. Nissim and Penman (2001) recommend separating operating assets from financing items in analyzing profitability; the balance sheet above does that by netting operating working capital and showing debt and cash separately, which will make the buyout layering simpler.

What this page is doingBuilt from schedules, balanced without a plug.
7

Checks

The checks sheet tests that total assets minus debt and equity equals zero in each year, that the cash balance the cash flow statement closes with matches the balance sheet's cash line, that cash never falls below $5 million, the company's minimum operating balance, and that debt never goes negative. Each check shows TRUE or a red flag, and a single summary cell turns red if any check fails. All checks pass in the management case.

What this page is doingWhat would reveal an error.
8

Testing the Links

A model that ties at its base inputs may still be wired incorrectly, so three tests were run. First, revenue growth was raised from 5 to 8 percent: EBITDA, taxes, working capital and cash all moved, and the balance check stayed at zero, showing that the working capital and tax links are live. Second, capital spending was doubled in year two: net property rose, depreciation in later years rose with it, cash fell by the same amount and the balance still held. Third, the loan amortization was set to zero: interest rose because average debt was higher, net income fell by the after-tax amount, cash rose by the repayment not made less the extra interest, and debt stayed at $40 million. Each change produced the expected effect in every statement, and none required touching a formula, which is the best evidence that the links are correct rather than coincidentally balanced.

What this page is doingThree changes that prove the model works.
9

Limits of the Management Case

The management case assumes no dividends, no acquisitions and no change in tax rules, and it treats goodwill as unchanged because no new practices are bought. It also holds working capital at a constant share of revenue, although insurer payment delays can stretch receivables in some years. These simplifications are reasonable for a baseline but would need revisiting before the model supports lending decisions.

What this page is doingWhat it leaves out.
10

What the Model Shows

Without a buyout, Mesquite Ridge generates more cash than it uses: cash builds from $12 million to about $53 million in three years while debt falls to $16 million. That cash, and the company's capacity to carry more debt, is what a private equity buyer will use. A company accumulating this much cash under current management is a natural target for a buyer who would put it to work through borrowing and acquisitions.

What this page is doingThe management case in brief.
11

Conclusion

The three statements are linked from drivers through schedules, with interest on average debt, cash flow derived from the balance sheet and a balance sheet that balances without a plug. The management case shows revenue reaching about $245 million and EBITDA about $46 million by year three, with steadily rising cash. Milestone Two will replace the capital structure with the buyout's.

What this page is doingThe base the buyout will build on.
12

References

Barth, M. E., Cram, D. P., & Nelson, K. K. (2001). Accruals and the prediction of future cash flows. The Accounting Review, 76(1), 27-58. https://doi.org/10.2308/accr.2001.76.1.27

Dechow, P. M. (1994). Accounting earnings and cash flows as measures of firm performance: The role of accounting accruals. Journal of Accounting and Economics, 18(1), 3-42. https://doi.org/10.1016/0165-4101(94)90016-7

Nissim, D., & Penman, S. H. (2001). Ratio analysis and equity valuation: From research to practice. Review of Accounting Studies, 6(1), 109-154. https://doi.org/10.1023/A:1011338221623

What the FIN 691 Module 3 instructions ask for

Milestone One in FIN 691 usually asks you to build an integrated three-statement model for the course company. Expect to forecast the income statement from your drivers, build supporting schedules for fixed assets, working capital and debt, link them to a balance sheet and derive the cash flow statement, so that cash on the balance sheet equals the ending cash from the cash flow statement. Many versions ask you to explain each link and show checks. A strong milestone has no plugs, makes every line traceable to an input or a schedule, explains how depreciation, capital spending, working capital and debt connect the statements and shows the balance check holding in every year.

How this FIN 691 Module 3 milestone one example is built

The sample forecasts the management case for three years. Revenue grows from $190 million to about $205 million, $224 million and $245 million, combining 5 percent same-clinic growth with two new clinics a year that ramp over three years. EBITDA margin rises from about 18.2 to 18.8 percent, giving EBITDA of about $37 million, $41 million and $46 million. Depreciation is 3.2 percent of revenue and capital spending 4 percent. Working capital is held at 5 percent of revenue. The existing $40 million loan amortizes $8 million a year, with interest on the average balance. Cash flow from operations rises from about $27 million to $34 million, cash builds to about $53 million and the balance sheet balances in every year, confirmed by a checks block.

Where the FIN 691 Module 3 rubric puts the points

Marks for this milestone go first to whether the three statements are right and complete, then to the integrity of the links between them, the supporting schedules, the absence of plugs, the checks and the clarity of explanation. Strong submissions derive the cash flow statement from changes in the balance sheet and net income, tie ending cash in every year, show the fixed asset, working capital and debt schedules and explain any assumption that drives a large change. Points are lost for balance sheets forced to balance with a plug line, for cash flow statements built independently of the balance sheet, for hard-coded numbers in forecast years and for missing checks.

FIN 691 Module 3 help: the mistakes that cost points

The surest way to build a model that ties is to let the cash flow statement do the work. Start each year with net income, add back depreciation and other noncash charges, subtract increases in working capital and capital spending, add or subtract debt flows, and the result is the change in cash. Put that ending cash on the balance sheet, build every other balance sheet line from a schedule, and the balance sheet will balance on its own. If it does not, the difference tells you something is missing, not that you need a plug. Add checks for the balance, for cash staying positive and for debt not exceeding its limit, and look at them every time you change an input.

Get FIN 691 Module 3 written to your instructions

Upload the FIN 691 Milestone One guidelines and your company's historical statements and drivers. We link the three statements year by year, build the debt and working capital schedules and add checks so the balance sheet ties without a plug. About two days; the first milestone is free. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More FIN 691 papers and related MS Finance samples

FIN 691 Module 3 questions, answered

Where can I find a free FIN 691 Module 3 Milestone One sample?

This page has the full FIN 691 Module 3 milestone, linking a dental group's three statements over three years with schedules, checks and no plug.

How do the three financial statements link in a model?

Net income flows from the income statement to retained earnings and the cash flow statement; the cash flow statement explains the change in cash, which becomes the balance sheet's cash; schedules for assets, working capital and debt tie the rest.

What is a plug in a financial model?

A line forced to whatever value makes the balance sheet balance, which hides errors instead of revealing them.

Why calculate interest on average debt?

Because debt changes during the year, and interest on the average balance is more accurate than interest on the beginning or ending balance.

What checks should a three-statement model include?

At minimum, that assets equal liabilities plus equity in every period, that cash flow ending cash matches balance sheet cash and that cash and debt stay within allowed limits.