| Course | FIN 691 Financial Modeling |
|---|---|
| Module | Module 6 |
| Paper type | graduate milestone building a leveraged buyout model |
| Length | About 1,030 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MS Finance |
| Updated | October 2026 |
Free sample paper for FIN 691 Module 6
Leveraged Buyout Model for Mesquite Ridge Dental Partners
[Student Name]
Southern New Hampshire University
FIN 691: Financial Modeling
Milestone Two
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Leveraged Buyout Model for Mesquite Ridge Dental Partners
Introduction
Module Five found Mesquite Ridge worth about $371 million on its own, close to the $374 million the buyer would pay. The buyer's case for a return above its cost of capital therefore rests on what it will add: borrowed money, acquisitions of small practices and the growth of the combined group. This milestone builds the buyout model that tests that case.
Sources and Uses
Sources and uses at closing (millions of dollars)
| Uses | Amount | Sources | Amount |
|---|---|---|---|
| Purchase of the business, enterprise value | 374.0 | Term loan, 5.5 times EBITDA | 187.0 |
| Transaction and financing fees | 10.0 | Sponsor equity | 197.0 |
| Total uses | 384.0 | Total sources | 384.0 |
The enterprise value pays off the existing $40 million loan and the sellers' equity. Fees cover advisors, lenders' arrangement fees and diligence. The term loan carries interest near 8.25 percent, amortizes 1 percent a year and requires all excess cash flow above a $5 million minimum to be applied to repayment. A delayed-draw facility, part of the same loan agreement, funds add-on acquisitions.
The Buyer's Plan
Existing clinics grow about 5 percent a year, as in the management case. Each year, the buyer acquires four small single-location practices, each with about $0.9 million of EBITDA, at about 6 times EBITDA, $21.6 million a year in total, drawn on the delayed-draw facility. Small practices sell at lower multiples than a 38-clinic platform because they are riskier, have less negotiating power and often depend on one owner-dentist; once inside a larger group, they share its billing, purchasing and insurance contracts. Buyout firms seek value through financial, governance and operational engineering (Kaplan & Strömberg, 2009), and this plan relies on all three.
Projection and Debt Schedule
Buyer's case (millions of dollars)
| Year | EBITDA | Interest | Free cash flow after interest | Add-on purchases | Ending debt | Debt to EBITDA |
|---|---|---|---|---|---|---|
| 1 | 39.3 | 15.4 | 13.2 | 21.6 | 195.4 | 5.0 |
| 2 | 44.9 | 16.1 | 16.4 | 21.6 | 200.7 | 4.5 |
| 3 | 50.7 | 16.6 | 19.9 | 21.6 | 202.4 | 4.0 |
| 4 | 56.8 | 16.7 | 23.9 | 21.6 | 200.0 | 3.5 |
| 5 | 63.3 | 16.5 | 28.4 | 21.6 | 193.3 | 3.1 |
Free cash flow after interest, taxes, capital spending and working capital is swept to repay debt, while add-ons are funded with new borrowing, so total debt stays near $190 million to $200 million even as EBITDA nearly doubles. The ratio of debt to EBITDA falls from 5.5 at closing to about 3.1 by year five, and EBITDA covers interest by more than 2.5 times in year one and nearly 4 times by year five.
Exit and Returns
At the end of year five, the company is assumed to be sold at 11 times EBITDA, the multiple paid at entry, for about $696 million. After repaying about $193 million of debt, equity proceeds are about $503 million. The sponsor invested $197 million, so the multiple of invested capital is about 2.55 times and the annual return on the equity, the IRR, comes to about 20.6 percent.
Returns by exit multiple
| Exit multiple | IRR | MOIC |
|---|---|---|
| 9 times | 13.8% | 1.91 |
| 10 times | 17.4% | 2.23 |
| 11 times | 20.6% | 2.55 |
| 12 times | 23.5% | 2.87 |
Returns Attribution
The equity grows from $197 million to about $503 million, a gain of about $306 million. Breaking it down: organic growth in the original clinics, at a constant 11 times multiple, adds roughly $100 million of enterprise value; the twenty acquired practices, bought for about $108 million in total and worth about $220 million at 11 times their year-five EBITDA, add roughly $110 million beyond their cost; and about $108 million of free cash flow, swept to repay the borrowing that bought them, keeps total debt near its starting level, with fees of $10 million as a drag. Without the add-ons, the IRR falls to about 13 percent. Guo et al. (2011) found that returns to buyouts in the 2000s came from a mix of industry-adjusted operating gains, falling interest rates and tax benefits of debt, and that operating improvements were smaller than in earlier decades; Harris et al. (2014) found that buyout funds have on average beaten public stock markets after fees, but with wide dispersion, so a plan's reliance on one source of value deserves scrutiny.
Model Mechanics
The buyout sits on top of the three-statement model rather than replacing it. A transaction switch on the inputs sheet changes the opening balance sheet: the old $40 million loan and the sellers' equity are removed, the new term loan and sponsor equity are added and the excess of the price over the book value of assets becomes additional goodwill. Fees are split between financing fees, capitalized and amortized over the loan's life, and deal costs, charged to equity. The debt schedule calculates mandatory amortization first, then the sweep from cash above the minimum, then draws on the delayed-draw facility for each year's add-ons, with the circularity switch from Module Four controlling interest on average balances. The returns sheet takes dated cash flows, the equity invested at closing and the proceeds at exit, and uses Excel's dated return function so that the IRR reflects actual timing rather than assuming exact years.
Checks Specific to the Buyout
Three checks are added: sources must equal uses at closing, the term loan balance may never fall below zero even when the sweep is large and debt to EBITDA may never exceed the 6.0 times limit the lenders will set. In the base case all three pass, but the third comes within one turn of its limit in year one, which is a warning for the stress tests.
Credit Check
Lenders to middle-market health care roll-ups commonly accept opening debt of around 5 to 6 times EBITDA if it falls steadily. This plan's peak of 5.5 times and decline to about 3 times meet that test, but they depend on the add-ons performing; if acquired practices underperform, debt would rise relative to EBITDA, which Milestone Three will stress.
Conclusion
At an 11 times entry and exit, the buyout returns about 2.55 times the equity and an IRR near 21 percent over five years. Those returns depend heavily on buying small practices at 6 times and valuing them at the platform's multiple; without that, returns fall to about 13 percent. The investment committee should see the deal as a bet on the add-on program as much as on the existing business.
References
Guo, S., Hotchkiss, E. S., & Song, W. (2011). Do buyouts (still) create value? The Journal of Finance, 66(2), 479-517. https://doi.org/10.1111/j.1540-6261.2010.01640.x
Harris, R. S., Jenkinson, T., & Kaplan, S. N. (2014). Private equity performance: What do we know? The Journal of Finance, 69(5), 1851-1882. https://doi.org/10.1111/jofi.12154
Kaplan, S. N., & Strömberg, P. (2009). Leveraged buyouts and private equity. Journal of Economic Perspectives, 23(1), 121-146. https://doi.org/10.1257/jep.23.1.121
What the FIN 691 Module 6 instructions ask for
Milestone Two in FIN 691 usually asks you to build a leveraged buyout model on top of your three-statement model. Expect to create a sources and uses table, set the new capital structure, build a debt schedule with mandatory amortization and a cash sweep, project the company's performance under the buyer's plan, compute exit value and equity proceeds and calculate returns as an internal rate of return and a multiple of invested capital. Many versions ask for sensitivity of returns to the exit multiple and for an explanation of what drives the returns. A strong milestone keeps the model integrated, shows debt and credit statistics each year, tests returns across exit multiples and attributes returns to their sources.
How this FIN 691 Module 6 milestone two example is built
The sample's sources and uses show $374 million of enterprise value and $10 million of fees funded by $187 million of term debt, 5.5 times EBITDA at about 8.25 percent, and $197 million of sponsor equity. The buyer's plan grows existing clinics about 5 percent a year and buys four small practices a year at 6 times their roughly $0.9 million of EBITDA, funded with delayed-draw debt and repaid from free cash flow through a sweep. EBITDA reaches about $63 million in year five with debt near $193 million, about 3 times EBITDA. At an 11 times exit, equity is worth about $503 million, 2.55 times the investment and an IRR near 21 percent. The returns attribution shows that buying practices at 6 times and valuing them at 11 times supplies a large share of the gain.
Where the FIN 691 Module 6 rubric puts the points
The milestone rubric commonly scores the accuracy of sources and uses, the construction of the debt schedule and cash sweep, the integration with the operating model, the calculation of exit value and returns, the sensitivity analysis and the explanation of where returns come from. High marks go to models that tie sources to uses, show credit statistics such as debt to EBITDA and interest coverage each year, compute IRR from dated cash flows and attribute returns to growth, debt reduction and multiple effects. Points come off for returns calculated without fees, for debt schedules disconnected from cash flow, for a single exit assumption and for attributing all returns to operations.
FIN 691 Module 6 help: the mistakes that cost points
The most revealing part of a buyout model is the returns attribution, and students often skip it. Once you have the IRR, ask how much came from EBITDA growth at a constant multiple, how much from paying down debt with cash flow and how much from selling at a higher multiple than was paid, including any gap between the multiple paid for add-on acquisitions and the exit multiple. A deal that depends mostly on multiple expansion carries a different risk from one that depends on cash flow. Also show credit statistics each year, since lenders and the investment committee will want to see that debt falls and interest stays covered, and run returns across a range of exit multiples rather than one.
Get FIN 691 Module 6 written to your instructions
Upload the FIN 691 Milestone Two guidelines and your model. We build sources and uses, the buyout debt schedule and cash sweep, exit and returns, then break the return into growth, paydown and multiple effects. About two days; the first milestone is free. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More FIN 691 papers and related MS Finance samples
- FIN 691 Module 1 Discussion: What Makes a Model Worth Trusting
- FIN 691 Module 2 Model Design Assignment: Structure and Clinic-Level Revenue Drivers
- FIN 691 Module 3 Milestone One: A Linked Three-Statement Model
- FIN 691 Module 4 Discussion: Circular References in the Debt Schedule
- FIN 691 Module 5 Valuation Assignment: A DCF With Its Sensitivity Tables
- FIN 691 Module 7 Discussion: Scenarios or Monte Carlo?
- FIN 691 Module 8 Acquisition Modeling Assignment: Four Practices a Year at Six Times EBITDA
- FIN 691 Module 9 Milestone Three: Reviewing and Stress-Testing the Model
- FIN 691 Module 10 Final Project: The Memo to the Investment Committee
- MBA 540 Module 2 Project Milestone One Strategic Position: Northfield's strategic position
- BMB 670 Module 10 Final Project: A Leadership and Ethics Plan
- MGT 630 Module 7 Cost Control Assignment: Earned Value on the Framing Package
- QSO 530 Module 4 Confidence Interval Assignment: What Members Think, Within a Margin
FIN 691 Module 6 questions, answered
Where can I find a free FIN 691 Module 6 Milestone Two sample?
The full FIN 691 Module 6 milestone is posted on this page, with a dental group LBO, its sources and uses, debt schedule, add-on acquisitions, returns and attribution.
What is a sources and uses table?
A table showing where the money for a transaction comes from, such as debt and sponsor equity, and where it goes, such as the purchase price, refinancing and fees; the two must be equal.
What is a cash sweep in an LBO model?
A provision that uses excess cash flow, above a minimum balance, to repay debt early, which reduces interest and debt over the holding period.
What is MOIC?
Multiple on invested capital: the equity value received at exit divided by the equity invested, a measure of total return that ignores timing.
Why do roll-up buyouts focus on add-on acquisitions?
Because small companies often sell at lower multiples than larger platforms, so buying them and valuing the combined company at the platform's multiple can create value even without operating improvements.