FIN 610 Module 5 Inventory Assignment Example

Reviewed by Portia Lambrick, MBA

This FIN 610 Module 5 Inventory Assignment sample applies the standard inventory models to a real-world stock problem and shows where they help and where they fail. SNHU FIN 610 (FIN-610) assigns this inventory analysis in Module Five of its MS Finance course on short-term financial management. For the composite Rappahannock Pool and Patio Supply, the paper sorts 2,400 items by value, calculates the economic order quantity, safety stock and reorder point for the company's best-selling pump seal kit, tests a supplier's quantity discount and explains why seasonal products such as chlorine tablets need a different approach than the textbook formula.

CourseFIN 610 Short-Term Financial Management
ModuleModule 5
Paper typegraduate assignment applying inventory management models
LengthAbout 1,050 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMS Finance
UpdatedOctober 2026

Free sample paper for FIN 610 Module 5

1

Ordering, Safety Stock and Seasonal Buying at Rappahannock Pool and Patio Supply

[Student Name]

Southern New Hampshire University

FIN 610: Short-Term Financial Management

Module Five Assignment

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingRappahannock and its figures are invented for teaching; demand, cost and lead-time data are illustrative.
2

Ordering, Safety Stock and Seasonal Buying at Rappahannock Pool and Patio Supply

Introduction

Inventory is the largest part of Rappahannock's working capital, averaging about $10.3 million across the year and peaking near $16 million before the pool season. Milestone One found that a long tail of slow items ties up cash while the fast movers drive sales. This assignment applies the standard inventory models to decide how much to order, when to reorder and how much protection to carry, and it marks where those models fit the business and where they do not.

What this page is doingWhy inventory matters to cash.
3

Sorting the Stock

Rappahannock carries about 2,400 items. Ranked by annual sales, about 300 items, the A class, produce about 75 percent of sales: chemicals, the most common pumps, filters, cartridges and replacement parts. About 600 items, the B class, produce another 20 percent. The remaining 1,500 items, the C class, produce only 5 percent of sales but hold nearly a quarter of inventory dollars, because many are specialty parts for older equipment bought in case lots. The three classes deserve different rules: weekly review and calculated order quantities for A items, monthly review for B items and minimum stocking or special order for C items.

What this page is doingAn ABC analysis.
4

The Holding Cost

Holding cost drives every calculation, so it is built from its parts. The cost of money is about 7.25 percent, the rate on the credit line that finances inventory. Warehouse space, utilities and handling add about 8 percent of inventory value, insurance and taxes about 2 percent, and shrinkage, damage and obsolescence about 4.75 percent, higher for pool chemicals, which degrade, and for parts tied to discontinued equipment. The total is about 22 percent of unit cost per year.

Gaur et al. (2005) found that inventory turnover varies widely among retailers and depends on gross margin, capital intensity and sales surprises, which suggests a distributor's holding policy should be judged against its own product mix rather than a single industry figure.

What this page is doingWhat a unit on the shelf costs each year.
5

Economic Order Quantity

Rappahannock's best-selling item is a pump seal kit used by service companies on most residential pump repairs. Annual demand is about 24,000 kits. Each purchase order costs about $45 to place, receive and pay, and each kit costs $14, so holding a kit for a year costs about $3.08.

Plugging those figures into the formula, the root of (2 x 24,000 x $45) / $3.08 comes to about 837, rounded to 840 kits. At that size Rappahannock orders about 29 times a year. Yearly ordering cost is about $1,290 and yearly holding cost on an average of about 420 kits is about $1,290, for a combined cost of about $2,580; at the economic order quantity, the two are equal by design.

Rumyantsev and Netessine (2007) tested classic inventory models against company data and found that firms' inventory levels respond to demand uncertainty, lead times and margins broadly as the models predict, which supports using them for steady, high-volume items like this one.

What this page is doingThe pump seal kit.
6

Safety Stock and the Reorder Point

Demand for seal kits is not steady through the year. About 60 percent of sales fall between April and August, so peak daily demand is about 96 kits, with a standard deviation of about 30 kits a day. The supplier's lead time is about 10 days. To keep the shelf stocked through 95 percent of reorder cycles, the service factor is 1.65, so safety stock is 1.65 x 30 x the square root of 10, about 157 kits, rounded to 160. The reorder point is average demand during the lead time, 960 kits, plus safety stock, or about 1,120 kits. Outside the season, demand and therefore the reorder point fall by more than half, so the reorder point should be reset each March and September.

Running out has real costs. Hendricks and Singhal (2005) found that companies announcing supply chain disruptions suffered lasting declines in operating performance; for Rappahannock, a stockout of seal kits in June sends a service company to a competitor for the whole repair, not just the kit.

What this page is doingProtecting the peak season.
7

A Quantity Discount

The supplier offers 3 percent off on orders of 2,000 kits or more. At 2,000 kits, Rappahannock would order 12 times a year, cutting ordering cost to about $540, but would hold an average of 1,000 kits, raising holding cost to about $2,990 at the discounted price. Combined, those costs are about $3,530, roughly $950 more than at the economic order quantity. The discount saves 3 percent of $336,000 of annual purchases, about $10,080. The net saving is about $9,100 a year, so the discount should be taken, with orders of 2,000 kits outside the season and possibly larger during it.

What this page is doingIs the bigger order worth it?
8

Where the Formula Fails

The economic order quantity assumes steady demand and an unlimited supply. Chlorine tablets break both assumptions. Demand is concentrated in about five months, prices often rise during the season and manufacturers limit allocations in a tight year. Rappahannock therefore buys most of its tablet supply in a few large pre-season orders, often under the early-buy dating described in Milestone One, and treats the decision as a forecast and price problem rather than an order-size problem. The right tools are a season demand forecast with a range, a comparison of pre-season and in-season prices and a plan for disposing of leftover stock, which can carry over to the next year if stored properly.

What this page is doingChlorine and other seasonal items.
9

Recommendations

For A items with steady demand, Rappahannock should use calculated order quantities and reorder points reset twice a year. It should accept quantity discounts when, as with the seal kit, the price saving outweighs the added holding cost. For seasonal A items such as chlorine, it should keep pre-season buying under early-buy dating and set an end-of-season target for leftover stock. For C items, it should move about 700 slow items to special order, as Milestone One proposed. These steps protect service on the items that drive sales while releasing cash from the ones that do not.

What this page is doingInventory policy by class.
10

Conclusion

The economic order quantity, safety stock and reorder point give Rappahannock clear rules for its fast-moving, steady items, and the seal kit analysis shows the discount is worth taking. For seasonal products the formulas do not fit, and buying decisions should rest on forecasts, prices and dating terms. Applied by class, these rules support the inventory reduction the cash plan relies on.

What this page is doingWhat the models say.
11

References

Gaur, V., Fisher, M. L., & Raman, A. (2005). An econometric analysis of inventory turnover performance in retail services. Management Science, 51(2), 181-194. https://doi.org/10.1287/mnsc.1040.0298

Hendricks, K. B., & Singhal, V. R. (2005). Association between supply chain glitches and operating performance. Management Science, 51(5), 695-711. https://doi.org/10.1287/mnsc.1040.0353

Rumyantsev, S., & Netessine, S. (2007). What can be learned from classical inventory models? A cross-industry exploratory investigation. Manufacturing and Service Operations Management, 9(4), 409-429. https://doi.org/10.1287/msom.1070.0166

What the FIN 610 Module 5 instructions ask for

The Module Five assignment in FIN 610 typically asks you to analyze a company's inventory and recommend policies. Expect to classify items by their contribution to sales or value, compute the economic order quantity for one or more items using demand, ordering cost and holding cost, set safety stock and a reorder point from demand variability and lead time, and evaluate a quantity discount or other purchasing option. Many versions ask about the financial effect of inventory decisions on working capital. A strong submission shows each formula with the company's numbers, explains the assumptions behind them, notes where real demand breaks those assumptions and connects the results to cash tied up and service to customers.

How this FIN 610 Module 5 inventory assignment example is built

The sample first sorts Rappahannock's items: about 300 produce three-quarters of sales, 600 another fifth and the remaining 1,500 only 5 percent. For its best-selling pump seal kit, with annual demand of 24,000 kits, an ordering cost of $45 and a holding cost of 22 percent of the $14 unit cost, the economic order quantity is about 840 kits, ordered about 29 times a year at a combined yearly ordering and holding cost near $2,600. With peak-season demand of about 96 kits a day, a standard deviation of 30 and a 10-day lead time, a 95 percent service level calls for about 160 kits of safety stock and a reorder point near 1,120. A 3 percent discount on orders of 2,000 saves about $10,000 a year in price against about $1,000 of added holding cost, so it should be taken.

Where the FIN 610 Module 5 rubric puts the points

For this inventory paper, expect marks to rest on the correct classification of items, the accurate calculation of EOQ, safety stock and reorder point, the evaluation of discounts or alternatives, the discussion of model assumptions and limits and the link to working capital and service. Strong submissions show inputs and units, explain the holding cost's components, use peak-season demand where it matters and compare total costs, including purchase price, when a discount is offered. Points come off for applying EOQ to seasonal or perishable items without comment, for safety stock based on average rather than peak demand, and for discount decisions that ignore the purchase price saving.

FIN 610 Module 5 help: the mistakes that cost points

The formulas are the easy part; the judgment is knowing when they fit. EOQ assumes steady demand, a fixed ordering cost and no price breaks, which suits a fast-moving part sold all year but not a product bought once before a season. Say so, and use a different method for those items. Build the holding cost from its parts, the cost of the money tied up, storage, insurance and obsolescence, because that percentage drives the answer. Use the demand and lead time of the busiest period for safety stock, since that is when stockouts happen. For any discount, compare total annual cost, purchase price included, at each order size. Finally, translate the result into dollars of inventory and service level.

Get FIN 610 Module 5 written to your instructions

Upload the FIN 610 Module 5 directions and the item data in your case. We classify stock by value, work out order quantities, safety stock and reorder points, test any discount offered and say where the formulas stop fitting the business. About two days, with your first assignment free. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More FIN 610 papers and related MS Finance samples

FIN 610 Module 5 questions, answered

Where can I find a free FIN 610 Module 5 Inventory sample?

The full FIN 610 Module 5 paper is on this page, with ABC analysis, EOQ, safety stock, a reorder point and a quantity discount test for a pool supply distributor.

What is the economic order quantity formula?

The square root of two times annual demand times the cost per order, divided by the annual holding cost per unit; it minimizes the combined cost of ordering and holding.

How do you calculate safety stock?

Multiply the service-level factor, such as 1.65 for 95 percent, by the standard deviation of daily demand and by the square root of the lead time in days.

When should a company accept a quantity discount?

When the yearly savings on purchase price exceed the added cost of holding the larger average inventory, after accounting for any reduction in ordering costs.

What is ABC inventory analysis?

Sorting items by their share of sales or value so that the few high-value items get close control and the many low-value items get simpler rules.