OL 750 Module 1 Discussion Example

Reviewed by Portia Lambrick, MBA

This OL 750 Module 1 Discussion sample picks a capstone problem by pulling one real organizational problem apart from the symptoms that surround it. SNHU OL 750 (OL-750), the capstone of the MS Organizational Leadership, opens by asking students to name the problem they will work on all term. The writer, an operations director at Halvard Sign Group, an invented Indianapolis maker of illuminated signs, looks at the company's purchase of a family-owned Louisville shop eighteen months on: late installations, warranty callbacks and a lost bank rebrand are symptoms, and the problem is an integration run from headquarters without the acquired workforce's voice. Research on merger transitions, reactions to change and readiness frames the choice.

CourseOL 750 Organizational Leadership Capstone
ModuleModule 1
Paper typegraduate capstone discussion post defining an organizational problem precisely enough to study, separating the problem from its symptoms
LengthAbout 400 words, 3 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMS Organizational Leadership
UpdatedOctober 2026

Free sample paper for OL 750 Module 1

1

Module One Discussion

Symptoms in Louisville, a Problem in Indianapolis

I direct operations excellence at Halvard Sign Group, an Indianapolis company that designs, builds and installs illuminated signs for retailers, banks and hospitals. In January 2025 Halvard bought Ohio River Signcraft, a family-owned Louisville shop with 140 employees, for $38 million. Eighteen months later the list of troubles is long. Company-wide on-time installation has fallen from 91 percent to 78 percent, and from 93 to 69 percent on Louisville jobs. Warranty callbacks have doubled. A regional bank moved its 34-branch rebrand to a competitor in March. Louisville's voluntary turnover reached 34 percent over the last twelve months, against 11 percent before the deal, and Wes Pruitt, the founder's son who stayed on to run the plant, resigned in November.

What this page is doingWhere I work and what is going wrong.
2

Each of those items is real, but none is my capstone problem. Late installs follow from losing experienced installers; lost customers follow from late installs; turnover follows from something else. When I ask what that something is, the answers from exit interviews and a May 2026 pulse survey converge. Halvard replaced Signcraft's job-costing system, its job titles and its profit-sharing plan within seven months, all decided in Indianapolis, and only 31 percent of Louisville staff now agree that they understand where the company is headed. My problem statement is this: Halvard led the integration as an absorption, without the acquired workforce's participation or local leadership, and the result is a loss of people and trust that is now costing customers.

What this page is doingSymptoms or problem?
3

Marks and Mirvis (2000) argue that combinations need a deliberate transition structure, with integration teams drawing on both sides, because left alone the stronger partner simply imposes its ways. Oreg et al. (2011), reviewing 79 quantitative studies, found that recipients' reactions to change depend heavily on the change process, including participation and communication, as well as on what the change means for them. Rafferty et al. (2013) describe readiness as including emotion as well as belief, at the level of the individual, the work group and the organization. All three point to leadership choices, not to the people in Louisville.

What this page is doingWhy this is a leadership problem.
4

I will not try to fix the whole merger. I will focus on the Louisville workforce and its leadership over the next eighteen months.

What this page is doingScope check.
5

Is "an integration led as an absorption" narrow enough to solve in a capstone, or should I pick one piece, such as the pay change or the plant's leadership?

What this page is doingHelp me test it.
6

References

Marks, M. L., & Mirvis, P. H. (2000). Managing mergers, acquisitions, and alliances: Creating an effective transition structure. Organizational Dynamics, 28(3), 35-47. https://doi.org/10.1016/S0090-2616(00)88448-X

Oreg, S., Vakola, M., & Armenakis, A. (2011). Change recipients' reactions to organizational change: A 60-year review of quantitative studies. The Journal of Applied Behavioral Science, 47(4), 461-524. https://doi.org/10.1177/0021886310396550

Rafferty, A. E., Jimmieson, N. L., & Armenakis, A. A. (2013). Change readiness: A multilevel review. Journal of Management, 39(1), 110-135. https://doi.org/10.1177/0149206312457417

What the OL 750 Module 1 instructions ask for

The first OL 750 discussion asks students to introduce the organizational problem their capstone will address and to explain why it matters. Expect to describe the organization briefly, state the problem in a sentence or two, give initial evidence of its size and impact and say why it falls within the scope of organizational leadership. Many prompts ask what courses in the program bear on it. Strong posts state a cause-level problem that leadership can act on, rather than a symptom such as low profits or high turnover, and they show early evidence instead of impressions. Replies should help classmates narrow or sharpen their problems, since a capstone that tries to fix everything usually fixes nothing.

How this OL 750 Module 1 discussion example is built

The writer leads operations excellence at Halvard Sign Group, a fictional sign manufacturer that bought Ohio River Signcraft of Louisville in January 2025. Eighteen months later, on-time installations have fallen from 91 to 78 percent, warranty callbacks have doubled, a bank chain moved its rebrand to a rival and Louisville turnover has tripled. The post argues that these are symptoms and that the problem is how the integration was led: systems, pay and leaders imposed from Indianapolis without the acquired staff's participation. Marks and Mirvis on transition structures, the Oreg, Vakola and Armenakis review of how people react to change and the readiness model of Rafferty, Jimmieson and Armenakis support the framing, and the post asks peers to test its scope.

Where the OL 750 Module 1 rubric puts the points

Instructors grading the first OL 750 discussion generally look for a clearly stated organizational problem, early evidence of its scope and impact, a reason it suits a leadership capstone, links to program concepts or research and replies that help classmates refine their problems. The best posts separate cause from symptom, quantify the problem where possible and keep it narrow enough to solve in one term. Points slip when a post names a broad topic such as communication or culture without specifics, offers no evidence, chooses a problem the student cannot access information about or gives replies that only encourage. Clear writing and APA citations matter too.

OL 750 Module 1 help: the mistakes that cost points

List everything that seems to be going wrong in your organization, then ask of each item what is causing it until the answers converge on something leadership can change. That item is usually your problem; the rest are symptoms you will use as evidence. Check that you can get data about it, such as turnover figures, survey results, customer records or interviews, and that it touches several courses in the program. A common slip is picking a problem so large, such as fixing the culture, that no plan could address it in ten modules. Another is picking one you cannot discuss honestly at work. Write the problem in one sentence with a measure in it, and ask classmates to try to break it.

Get OL 750 Module 1 written to your instructions

Share the OL 750 Module 1 prompt and the organization where you plan your capstone. A writer separates the problem from its symptoms, states it so it can be measured and solved within the course, links it to research from the program and asks OL 750 peers whether it is narrow enough. Your opening capstone post is free and typically ready inside two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More OL 750 papers and related MS Organizational Leadership samples

OL 750 Module 1 questions, answered

Where can I find a free OL 750 Module 1 Discussion sample?

This page carries the whole OL 750 Module 1 post: a sign maker's stalled merger, with the capstone problem separated from its symptoms.

How do I choose an OL 750 capstone problem?

Pick a cause-level problem in an organization you can study, with data available, that leadership can act on and that draws on several program courses.

What is the difference between a problem and a symptom?

A symptom is a visible result, such as turnover or late deliveries; the problem is the underlying condition that produces it and that a leader can change.

Can my OL 750 capstone be about my own workplace?

Usually yes, and it often makes the capstone stronger, provided you can obtain data and discuss the organization honestly while protecting confidential information.

How narrow should a capstone problem be?

Narrow enough that one plan, with owners and measures, could address it within a year or two; broad topics such as culture need a specific angle.