| Course | OL 750 Organizational Leadership Capstone |
|---|---|
| Module | Module 5 |
| Paper type | graduate capstone discussion post judging the fairness of a pay change after an acquisition with organizational justice research |
| Length | About 400 words, 3 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MS Organizational Leadership |
| Updated | October 2026 |
Free sample paper for OL 750 Module 5
Module Five Discussion
A Memo, a Bonus and a Missing Explanation
For thirty years, Ohio River Signcraft paid its employees a share of each year's profit, which averaged about 6 percent of wages and came as a single check before Christmas. In July 2025, six months after Halvard Sign Group bought the company, a two-paragraph memo announced that the plan would end and that Louisville employees would join Halvard's production bonus, paid monthly on units completed above a standard. The memo did not compare the two plans or say why the change was made. Halvard's leaders saw it as treating both plants the same. In Louisville, where the production standards had been set for Indianapolis's line process, most fabricators earned less under the bonus than they had under profit-sharing.
Colquitt et al. (2001) synthesized 183 studies and found that fairness of outcomes, procedures, interpersonal treatment and information are related but distinct, and that each predicts outcomes such as commitment, trust in leaders and withdrawal. Judged that way, the outcome was mixed: a single pay system has a fair logic, but Louisville staff lost income on standards built for another plant. The procedure was poor, since no Louisville employee was consulted. The information was worst. A memo that explains nothing tells people they are not owed an explanation.
Greenberg (1990) studied manufacturing plants that temporarily cut pay by 15 percent. Theft rose where the cut was explained briefly, and much less where managers explained the reasons thoroughly and with evident concern. The cut was the same; the explanation changed how people responded. O'Boyle et al. (2016), in a meta-analysis of 102 samples covering almost 57,000 firms, found a small but positive relationship between employee ownership and firm performance, which suggests Signcraft's profit-sharing was not merely sentimental. It was part of how the shop worked.
I would not simply restore the old plan, which would create a two-tier system the Indianapolis plant would resent. I would admit in person that the change was handled badly, show Louisville employees the comparison the memo left out and form a joint group from both plants to design a gainsharing plan that rewards both output and quality, with a transition payment for 2026 equal to the difference employees lost.
If you were Halvard's chief executive, would you restore profit-sharing for Louisville, explain the change properly or design something new, and what would each choice signal to Indianapolis?
References
Colquitt, J. A., Conlon, D. E., Wesson, M. J., Porter, C. O. L. H., & Ng, K. Y. (2001). Justice at the millennium: A meta-analytic review of 25 years of organizational justice research. Journal of Applied Psychology, 86(3), 425-445. https://doi.org/10.1037/0021-9010.86.3.425
Greenberg, J. (1990). Employee theft as a reaction to underpayment inequity: The hidden cost of pay cuts. Journal of Applied Psychology, 75(5), 561-568. https://doi.org/10.1037/0021-9010.75.5.561
O'Boyle, E. H., Patel, P. C., & Gonzalez-Mulé, E. (2016). Employee ownership and firm performance: A meta-analysis. Human Resource Management Journal, 26(4), 425-448. https://doi.org/10.1111/1748-8583.12115
What the OL 750 Module 5 instructions ask for
The Module 5 discussion in OL 750 often asks students to examine an ethical or human resource dimension of their capstone problem, such as fairness, employee well-being or the organization's obligations to the people affected. For many capstones, the question is whether a decision was fair and what fairness requires now. Strong posts break fairness into its parts, since an outcome can be reasonable while the process that produced it is not, and they use research to predict how employees respond. They also propose what a leader should do next, which may be different from reversing the decision. Replies often push a classmate to consider the costs of a remedy or the views of stakeholders who benefited from the change.
How this OL 750 Module 5 discussion example is built
The post examines a decision at Halvard Sign Group, a fictional company that bought a Louisville sign shop in 2025. Signcraft's profit-sharing plan had paid about 6 percent of wages each year; Halvard replaced it with its production bonus, paid per unit completed, through a short memo with no comparison or consultation. The Colquitt team's meta-analysis separates distributive, procedural, interpersonal and informational justice; Greenberg's study of plants that cut pay by 15 percent shows that a thorough explanation reduced theft and resentment; and the O'Boyle, Patel and Gonzalez-Mulé meta-analysis finds a small positive link between shared ownership and performance. The post concludes that the process was the larger failure and asks whether to restore the plan or explain it.
Where the OL 750 Module 5 rubric puts the points
Grading for the OL 750 fairness discussion usually rewards a precise account of the decision, analysis of fairness through more than one dimension, accurate use of research on justice and employee reactions, a practical recommendation and replies that probe a classmate's remedy. The top-scoring posts separate the outcome from the process, predict employee responses with evidence and propose a remedy that accounts for cost and for other stakeholders. Points drop when a post treats fairness as a feeling rather than a set of criteria, assumes any pay change is unfair, ignores the organization's reasons or answers peers with agreement only. APA citations and careful writing count toward the grade.
OL 750 Module 5 help: the mistakes that cost points
Describe the decision exactly: what changed, for whom, by how much, who decided and how it was communicated. Then judge each part of fairness separately. Was the outcome reasonable compared with what people had and what others receive? Were the procedures consistent, unbiased and open to input? Were people treated with respect and given an honest explanation? A common mistake is concluding that a decision was unfair simply because people disliked it; another is assuming an apology will fix a process failure. Research suggests that explanation and voice can soften unfavorable outcomes, but not erase them. Propose a remedy that is affordable and that the company's other employees would also see as fair. Ask classmates which part of fairness they would repair first.
Get OL 750 Module 5 written to your instructions
Send the OL 750 Module 5 prompt and the decision you are examining in your capstone. A writer judges its fairness through outcome, procedure, treatment and information, applies research on how people react to unfair change, proposes a remedy that fits the organization and closes with a question that lets OL 750 peers weigh in. Your first fairness post is drafted free in about two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More OL 750 papers and related MS Organizational Leadership samples
- OL 750 Module 1 Discussion: Choosing a Capstone Problem After a Merger
- OL 750 Module 2 Milestone One: Problem Statement and Organizational Assessment
- OL 750 Module 3 Discussion: Do Two Cultures Doom a Merger?
- OL 750 Module 4 Milestone Two: Literature Review and Analysis of Causes
- OL 750 Module 6 Milestone Three: The Leadership and Change Strategy
- OL 750 Module 7 Discussion: Who Should Lead the Louisville Plant?
- OL 750 Module 8 Implementation and Evaluation Plan: Owners, Costs, Measures and Risks
- OL 750 Module 9 Final Project: The Capstone Report
- OL 750 Module 10 Journal: What the Program Changed in My Leadership
- MKT 500 Module 10 Final Project: Strategic Marketing Plan
- QSO 700 Module 3 Literature Review Assignment: What Research Says About Faster Decisions
- CSR 610 Module 10 Final Project: An Ethics and Culture Strategy
- ACC 620 Module 8 Business Combinations Assignment: Buying a Minnesota Carrier
OL 750 Module 5 questions, answered
Where can I find a free OL 750 Module 5 Discussion sample?
The full OL 750 Module 5 post is on this page: an invented sign company's replacement of profit-sharing after an acquisition, judged with organizational justice research.
What are the four types of organizational justice?
Distributive (fairness of outcomes), procedural (fairness of the process), interpersonal (respectful treatment) and informational (honest, adequate explanation).
Why does explanation matter in pay changes?
In a study of plants that cut pay temporarily, employees who received a thorough, sensitive explanation reported less inequity and theft fell, compared with plants given a brief explanation.
Does profit-sharing improve performance?
Research on employee ownership and shared rewards finds a small but positive average link with firm performance, with effects depending on how the plan is designed and communicated.
How do you fix an unfair decision after it is made?
Admit the process failure, explain the reasons honestly, give affected employees a voice in what happens next and, where possible, offer a transition or partial remedy for the loss.