OL 750 Module 4 Milestone Two Example

Reviewed by Portia Lambrick, MBA

This OL 750 Module 4 Milestone Two sample reviews research on the causes of an organizational problem and analyzes the organization's own evidence against it. SNHU OL 750 (OL-750) sets this review for Module 4 of the MS Organizational Leadership capstone, once the problem has been stated. The problem is the stalled integration of a family-owned Louisville sign shop into Halvard Sign Group, an invented Indianapolis company. Research on identification after mergers, organizational justice, the departure of acquired leaders and commitment to change is set beside exit interviews, survey results and the timeline of integration decisions, and four causes are ranked by the strength of the evidence for each.

CourseOL 750 Organizational Leadership Capstone
ModuleModule 4
Paper typegraduate capstone milestone reviewing research on the causes of an organizational problem and analyzing the organization's evidence against it
LengthAbout 1,220 words, 7 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMS Organizational Leadership
UpdatedOctober 2026

Free sample paper for OL 750 Module 4

1

Why Louisville Is Leaving: Research on Post-Acquisition Disengagement Applied to Halvard Sign Group

[Student Name]

Southern New Hampshire University

OL 750: Organizational Leadership Capstone

Milestone Two: Literature Review and Analysis

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingThe merger, the exit interviews and the survey results analyzed in this OL 750 milestone are invented.
2

Why Louisville Is Leaving: Research on Post-Acquisition Disengagement Applied to Halvard Sign Group

Introduction

Milestone One stated the capstone problem: Halvard Sign Group folded the Louisville shop into its own systems as though it were a new department, and Louisville turnover, delivery and customer results have deteriorated since. This milestone asks why. It reviews research on four possible causes, each suggested by the Milestone One evidence: the loss of organizational identity among acquired employees, unfairness in how decisions and pay changes were made, the departure of acquired leaders and the absence of leadership that builds commitment to change. After each review section the paper tests the research against Halvard's evidence. A final section maps the causes and ranks them.

What this page is doingSets the questions for the review.
3

Cause One: Identity and Continuity

Employees of an acquired firm often lose more than a logo. Van Knippenberg et al. (2002), in two surveys of merged organizations, found that identification with the new organization depended on a sense of continuity with the old one, and that this continuity depended on whether one's own firm dominated or was dominated. For employees of the dominated partner, pre-merger identification carried over weakly, and perceived differences between the partners reduced their identification more than they did for the dominant side. Stahl and Voigt (2008), across 46 studies, showed that cultural distance is not automatically harmful; what matters is how the combination is managed, particularly how tightly the acquired firm is absorbed.

Halvard's evidence fits this research closely. Within seven months Louisville lost its software, its job titles, its profit-sharing plan and its leader. Exit interviews repeatedly used the phrase "we used to be the shop," and the pulse survey found only 31 percent of Louisville staff understood where the company was headed, against 68 percent in Indianapolis. The dominant side reports little change in its own experience. Identity loss is strongly supported as a cause.

What this page is doingReviews research on identification after a merger.
4

Cause Two: Fairness of Process and Pay

Research on organizational justice distinguishes the fairness of outcomes (distributive justice), of procedures (procedural justice), of interpersonal treatment and of the information people receive (informational justice). Pooling 183 justice studies, Colquitt et al. (2001) showed that the four overlap yet each explains part of a person's fairness judgment on its own, and found that fairness related to job satisfaction, commitment, trust in authorities, citizenship behavior, withdrawal and performance. Procedural and informational fairness matter especially when outcomes are unfavorable, because a well-explained loss is easier to accept than an unexplained one.

The replacement of profit-sharing is Halvard's clearest justice failure. For most Louisville employees the production bonus paid less than the profit check had, and the change was announced in a two-paragraph memo with no explanation of how the two plans compared. The grade mapping that moved 11 senior fabricators to lower grades protected their pay but not their standing, and no one in Louisville had a say in it. Twenty of the 31 exit interviews mentioned pay or titles, and only 44 percent of remaining Louisville staff agree that their manager treats them fairly. Unfair process is strongly supported as a cause.

What this page is doingReviews organizational justice research.
5

Cause Three: Departure of Acquired Leaders

Hambrick and Cannella (1993) explained the departures of acquired executives through relative standing: executives of a bought firm are more likely to leave when the acquisition lowers their status, for example when they lose autonomy or when the acquirer treats them as inferior. Krug and Hegarty (2001), studying top managers of firms bought by multinationals, could sort stayers from leavers correctly nearly four times in five using just three things: how the deal was announced to them, how the new owners' leaders dealt with them in the months that followed and what they expected the deal to mean for them over time.

At Halvard, Wes Pruitt went from owner to vice president to a plant manager whose estimating and engineering decisions were routed through Indianapolis, a clear loss of standing, and he resigned in November 2025. Two of five Louisville project managers followed. The senior fabricators who left, nine of 22, were informal leaders on the shop floor, and the grade mapping lowered their standing as well. Their departures removed the people other employees trusted, which helps explain why turnover accelerated in the winter of 2026. The research supports this cause, but the evidence suggests it amplified the first two rather than acting alone.

What this page is doingReviews research on who leaves after acquisitions.
6

Cause Four: Leadership of the Change

Herscovitch and Meyer (2002) distinguished three forms of commitment to a change: affective, from believing in its value; normative, from a sense of obligation; and continuance, from the cost of opposing it. Across three studies, affective and normative commitment predicted more behavioral support for a change than continuance commitment did, and commitment to the change predicted support better than general commitment to the organization. Bommer et al. (2005), tracking 372 employees over nine months, found that transformational leader behaviors were associated with lower cynicism about organizational change and that the direction of influence ran from the leader's behavior to employees' attitudes.

Halvard's integration relied on continuance commitment. Louisville employees complied with the new systems because they had to, and the survey suggests few believed in them. No leader in Louisville explained the integration's purpose, and the Indianapolis production manager appointed in November 2025 was, by her own account, told to "get the numbers back." Weak leadership of the change is supported as a cause and is the cause most within Halvard's control.

What this page is doingReviews research on commitment to change.
7

Gaps and Disagreements

The literature leaves two questions open for this case. First, most identity research studies white-collar employees in large mergers, and evidence on skilled trades in small acquisitions is thin. Second, research on justice explains reactions to a pay change but says less about how to restore trust once a change has been made. The solution will need to rely on evidence about rebuilding trust and on Halvard's own pilot results.

A third tension runs through the research itself. Studies of mergers tend to recommend speed, on the view that a long period of uncertainty breeds anxiety and departures, while studies of justice and identity recommend participation, which takes time. Halvard moved fast and lost people anyway, which suggests that speed without voice is the worst combination. The case cannot settle the general debate, but it does indicate that the remaining integration decisions, such as estimating and engineering, should be made more slowly and with Louisville in the room, while decisions that restore something lost, such as local leadership, should be made quickly. That distinction will shape the sequence of the strategy in Milestone Three.

What this page is doingNotes what the research does not settle.
8

Causal Map

Causes of the Louisville integration problem, ranked

RankCauseResearch supportHalvard evidenceRole
1Loss of identity and continuityStrongStrong: exit interviews, survey gapPrimary
2Unfair process and pay changeStrongStrong: 20 of 31 exits cite pay or titlesPrimary
3Absence of leadership that builds commitmentStrongModerate to strong: compliance without beliefEnabling
4Departure of acquired leadersModerateStrong: Pruitt, two project managers, nine senior fabricatorsAmplifier
What this page is doingRanks the causes by evidence.
9

Conclusion

The review points to a clear diagnosis. Louisville employees lost the identity they had and were given no fair voice in what replaced it, while the leaders they trusted left and no one built commitment to the new company. Milestone Three will propose a leadership and change strategy aimed at the two primary causes and at the leadership gap that allowed them to compound.

What this page is doingSets up the leadership and change strategy.
10

References

Bommer, W. H., Rich, G. A., & Rubin, R. S. (2005). Changing attitudes about change: Longitudinal effects of transformational leader behavior on employee cynicism about organizational change. Journal of Organizational Behavior, 26(7), 733-753. https://doi.org/10.1002/job.342

Colquitt, J. A., Conlon, D. E., Wesson, M. J., Porter, C. O. L. H., & Ng, K. Y. (2001). Justice at the millennium: A meta-analytic review of 25 years of organizational justice research. Journal of Applied Psychology, 86(3), 425-445. https://doi.org/10.1037/0021-9010.86.3.425

Hambrick, D. C., & Cannella, A. A., Jr. (1993). Relative standing: A framework for understanding departures of acquired executives. Academy of Management Journal, 36(4), 733-762. https://doi.org/10.5465/256757

Herscovitch, L., & Meyer, J. P. (2002). Commitment to organizational change: Extension of a three-component model. Journal of Applied Psychology, 87(3), 474-487. https://doi.org/10.1037/0021-9010.87.3.474

Krug, J. A., & Hegarty, W. H. (2001). Predicting who stays and leaves after an acquisition: A study of top managers in multinational firms. Strategic Management Journal, 22(2), 185-196. https://doi.org/10.1002/1097-0266(200101)22:2<185::AID-SMJ149>3.0.CO;2-M

Stahl, G. K., & Voigt, A. (2008). Do cultural differences matter in mergers and acquisitions? A tentative model and examination. Organization Science, 19(1), 160-176. https://doi.org/10.1287/orsc.1070.0270

van Knippenberg, D., van Knippenberg, B., Monden, L., & de Lima, F. (2002). Organizational identification after a merger: A social identity perspective. British Journal of Social Psychology, 41(2), 233-252. https://doi.org/10.1348/014466602760060228

What the OL 750 Module 4 instructions ask for

The second OL 750 milestone asks students to review scholarly research related to their capstone problem and to use it to analyze the problem's causes in their organization. Expect to synthesize peer-reviewed sources on the factors that produce the problem, compare what research predicts with the evidence gathered in Milestone One and identify the causes the solution must address. Many versions also ask for program concepts and theories that explain the problem and for gaps or disagreements in the literature. Strong reviews are organized by theme or cause, not as a list of article summaries, and every theme returns to the organization's data. The milestone should close with a clear statement of which causes matter most and why.

How this OL 750 Module 4 milestone two example is built

The milestone reviews four bodies of research and tests each against Halvard Sign Group's invented Louisville data. Work by van Knippenberg and colleagues predicts that staff of a dominated firm lose identification when continuity disappears; the Colquitt team's justice meta-analysis links fair procedures, explanations and pay to commitment and withdrawal; Hambrick and Cannella's relative standing framework and Krug and Hegarty's study explain why the founder's son and senior fabricators left; and the commitment-to-change model of Herscovitch and Meyer, with the Bommer team's longitudinal work, shows what leaders do to cynicism. A causal map ranks identity loss and unfair process as primary causes and the leadership vacuum as the amplifier.

Where the OL 750 Module 4 rubric puts the points

OL 750 Milestone Two is generally marked on a well-organized synthesis of relevant scholarly research, accurate explanation of the theories and findings, analysis that applies the research to the organization's evidence, identification of the most important causes and connections to program concepts. The best papers organize by cause, note where studies disagree or do not fit the case and end with a ranked set of causes that a solution can address. Papers lose credit when they summarize sources one by one, use research that does not bear on the problem, never return to the organization's data or rank causes without evidence. APA formatting and clear organization make up the rest.

OL 750 Module 4 help: the mistakes that cost points

Start from the causes your Milestone One data suggest, then search for research on each one, aiming for peer-reviewed studies with real samples. Read for findings, not just definitions, and note the size and conditions of each effect. Organize the review by cause, and after each section ask what your organization's data say: do they fit, partly fit or contradict the research? A common mistake is a review that could sit in any paper on the topic because it never mentions the organization; another is ignoring research that does not support your preferred explanation. Draw a simple causal map or table that ranks causes by the strength of the evidence. Close with the causes your solution will target and the ones it will leave aside.

Get OL 750 Module 4 written to your instructions

Send us the Module 4 directions for OL 750, your problem statement and the comments it earned. A writer reviews the research on the causes of your problem, organizes it by cause rather than by author, tests each body of evidence against your organization's data and ranks the causes so Milestone Three can target them. No charge applies to your first OL 750 literature review, which we turn around in roughly two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More OL 750 papers and related MS Organizational Leadership samples

OL 750 Module 4 questions, answered

Where can I find a free OL 750 Module 4 Milestone Two sample?

The complete OL 750 Milestone Two is on this page: research on why acquired employees disengage, tested against an invented sign company's merger evidence and ranked by cause.

How do I organize a capstone literature review?

By theme or cause, synthesizing several sources in each section and ending each section with what the research means for your organization's evidence.

How many sources does the OL 750 literature review need?

Guidelines vary by section; many expect at least six to ten scholarly sources, chosen for their relevance to the problem's causes rather than their number.

What is a causal analysis in a capstone?

An explanation of why the problem occurs, linking research to the organization's data and ranking causes by how strongly the evidence supports each one.

Should I include research that does not support my view?

Yes. Showing where the evidence is mixed, and explaining why your organization fits one side, makes the analysis more credible.