OL 750 Module 2 Milestone One Example

Reviewed by Portia Lambrick, MBA

This OL 750 Module 2 Milestone One sample states the capstone problem and assesses the organization with data on its people, operations, customers and finances. SNHU OL 750 (OL-750) wants this opening milestone by Module 2, so the MS Organizational Leadership capstone starts from evidence. The organization is Halvard Sign Group, an invented Indianapolis sign maker that bought a family-owned Louisville shop in January 2025. The assessment traces turnover in Louisville from 11 to 34 percent, the loss of nine senior fabricators, on-time installs falling to 69 percent, doubled warranty callbacks, a lost bank contract and a survey split between the two plants, then connects those figures to the integration decisions made in Indianapolis.

CourseOL 750 Organizational Leadership Capstone
ModuleModule 2
Paper typegraduate capstone milestone stating the organizational problem and assessing the organization with data on people, operations, customers and finances
LengthAbout 1,200 words, 7 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMS Organizational Leadership
UpdatedOctober 2026

Free sample paper for OL 750 Module 2

1

An Integration Run From Indianapolis: Problem Statement and Assessment for Halvard Sign Group

[Student Name]

Southern New Hampshire University

OL 750: Organizational Leadership Capstone

Milestone One: Problem Statement and Organizational Assessment

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingHalvard Sign Group, Ohio River Signcraft and every figure in this OL 750 milestone are fictional.
2

An Integration Run From Indianapolis: Problem Statement and Assessment for Halvard Sign Group

Introduction

This milestone states the problem my capstone will address at Halvard Sign Group and assesses the organization in which it occurs. Halvard bought Ohio River Signcraft of Louisville in January 2025, and eighteen months later the combined company is losing people, delivery reliability and customers. The milestone describes the organization, states the problem, presents data on people, operations, customers and finances, identifies stakeholders and sets the scope. It closes with the program concepts and research questions that Milestone Two will take up.

What this page is doingStates purpose and organization of the milestone.
3

The Organization

Halvard was founded in Indianapolis in 1987 and designs, fabricates and installs illuminated commercial signs: channel letters, pylon and monument signs and LED message boards for retailers, banks, hospitals and car dealers. Before the merger it employed 330 people and earned about $96 million in revenue. Ohio River Signcraft was founded in Louisville in 1974 by Earl Pruitt and run since 2009 by his son, Wes. It employed 140 people, earned about $31 million and was known for skilled hand fabrication and for installation crews who had worked together for years. Halvard paid $38 million for Signcraft, mainly to gain its customers in Kentucky, Tennessee and southern Ohio and its experienced fabricators. The combined company is organized by function from Indianapolis: sales, engineering, fabrication, installation and service report to vice presidents there, with a plant manager in Louisville.

What this page is doingDescribes mission, structure and the merger.
4

The Integration Decisions

Five decisions shaped the integration. In April 2025 Halvard replaced Signcraft's job-costing and scheduling software with its own system, with two days of training. In May it mapped Signcraft's job titles onto Halvard's grades, which moved 11 senior fabricators to a lower grade with their pay protected. In July it replaced Signcraft's profit-sharing plan, which had paid an average of about 6 percent of wages each year, with Halvard's production bonus, paid on units completed. In September it began routing Louisville estimating and engineering through Indianapolis. And after Wes Pruitt resigned in November, it appointed an Indianapolis production manager to run the Louisville plant. Each decision was made by Halvard's executive team, and the integration had no team or steering group that included Signcraft staff.

What this page is doingSets out what changed and when.
5

Problem Statement

Halvard led the integration of Ohio River Signcraft as an absorption, imposing systems, pay and leadership without the participation of the acquired workforce or a trusted local leader. As a result, Louisville turnover has tripled, the plant has lost much of its senior skill, on-time installation on Louisville jobs has fallen by 24 points and the company is losing customers it paid to acquire. Unless the integration is led differently, Halvard is likely to lose the value it bought.

What this page is doingStates the problem in measurable terms.
6

Assessment: People

Workforce indicators before and after the merger (invented figures)

Indicator2024Year to June 2026
Voluntary turnover, Louisville11 percent34 percent
Voluntary turnover, Indianapolis13 percent15 percent
Senior fabricators, Louisville2213
Project managers, Louisville53
"I understand where the company is headed," LouisvilleNot measured31 percent favorable
Same item, IndianapolisNot measured68 percent favorable
"My manager treats me fairly," LouisvilleNot measured44 percent favorable

The pattern is concentrated in Louisville and among its most experienced people. Exit interviews with 31 departing Louisville employees most often cited the loss of profit-sharing, the title changes and a sense that "Indianapolis decides everything." Krug and Hegarty (2001) found that whether acquired managers stayed depended largely on how they perceived the announcement, their interactions with the acquirer's leaders afterward and the long-term effects of the deal, and those perceptions separated stayers from leavers in almost 80 percent of cases. Louisville's exit interviews describe exactly those perceptions.

What this page is doingPresents workforce data.
7

Assessment: Operations and Customers

On-time installation company-wide fell from 91 percent in 2024 to 78 percent in the first half of 2026, and on Louisville jobs from 93 to 69 percent. Warranty callbacks rose from 2.1 to 4.6 percent of completed jobs, mostly for wiring and sealing faults that the departed fabricators rarely made. In February 2026 a Louisville crew led by a newly promoted foreman let a crane boom come within a few feet of a power line during a pylon install; no one was hurt, but it was the company's most serious near-miss in five years. In March a regional bank that had been a Signcraft customer for twenty years moved a $2.2 million, 34-branch rebrand to a competitor, citing missed dates.

What this page is doingPresents performance data.
8

Assessment: Finances

Halvard expected the deal to add about $4 million a year in operating profit by 2026. Instead, Louisville's operating profit fell from $3.1 million in 2024 to a loss of about $0.4 million in the year to June 2026. Replacement hiring and overtime in Louisville cost about $1.6 million, rework about $0.9 million and the lost bank work about $0.5 million in margin.

What this page is doingShows the cost of the problem.
9

Limits of the Data

Several gaps in this evidence need stating up front. The pulse survey was first run in May 2026, so there is no pre-merger baseline for the attitude items, and the comparison between plants may partly reflect differences that existed before the deal. Exit interviews were conducted by Indianapolis human resources staff, which may have made some departing employees guarded and others more critical than they would have been with a neutral interviewer. The customer data cover only accounts that complained or left; satisfied customers are not represented. Financial figures for Louisville since the merger rely on an allocation of shared Indianapolis costs that Halvard's finance team set and that Louisville managers dispute. Even so, the overall picture holds, since turnover, callbacks and on-time rates are recorded directly, but Milestone Two should seek outside evidence on the attitude questions, and the evaluation plan should establish baselines before any change is made.

What this page is doingNotes what the assessment cannot show.
10

Strengths

The assessment also shows strengths. Indianapolis staff remain engaged, Halvard's engineering and estimating systems are faster than Signcraft's were, and Louisville still has 13 senior fabricators and installation crews that customers trust. Several remaining Louisville employees told interviewers that they want the merger to work and would help shape it.

What this page is doingNotes what the solution can build on.
11

Stakeholders and Scope

The main stakeholders are Louisville employees, Halvard's executive team and board, the Indianapolis departments that now serve Louisville, customers in the Louisville region and the families of employees whose income fell with the end of profit-sharing. The capstone covers leadership of the Louisville integration over the next eighteen months. It does not address Halvard's overall strategy, its Indianapolis operations or its choice of software, except where they affect Louisville.

What this page is doingDefines who is affected and the project's limits.
12

Concepts and Questions for Milestone Two

The problem touches every course in the program: human behavior and identity (OL 500), human resource strategy and pay (OL 600 and OL 620), leading change (OL 663), leadership (OL 670) and responsibility to employees (OL 690). Stahl and Voigt (2008), pooling 46 studies whose samples added up to more than 10,000 deals, found that the same cultural distance could slow the social side of integration in one deal and spur learning in another, so culture alone will not explain Louisville. Oreg et al. (2011) direct attention to how change is carried out. Milestone Two will review research on three questions: why acquired employees disidentify and leave, how fairness in pay and process shapes their response, and what kind of leadership restores commitment after an acquisition.

What this page is doingLinks to the program and next steps.
13

References

Krug, J. A., & Hegarty, W. H. (2001). Predicting who stays and leaves after an acquisition: A study of top managers in multinational firms. Strategic Management Journal, 22(2), 185-196. https://doi.org/10.1002/1097-0266(200101)22:2<185::AID-SMJ149>3.0.CO;2-M

Oreg, S., Vakola, M., & Armenakis, A. (2011). Change recipients' reactions to organizational change: A 60-year review of quantitative studies. The Journal of Applied Behavioral Science, 47(4), 461-524. https://doi.org/10.1177/0021886310396550

Stahl, G. K., & Voigt, A. (2008). Do cultural differences matter in mergers and acquisitions? A tentative model and examination. Organization Science, 19(1), 160-176. https://doi.org/10.1287/orsc.1070.0270

What the OL 750 Module 2 instructions ask for

OL 750 Milestone One asks students to state the problem their capstone will address and to assess the organization in which it occurs. Expect to describe the organization's mission, structure, size and environment, to state the problem clearly with evidence of its significance and to analyze the organization's current condition with data such as performance figures, workforce measures, survey results and financial information. Many versions ask for the stakeholders affected, the scope and limits of the project and the program concepts that apply. Strong milestones separate symptoms from the problem and show the reader how the evidence points to it. The assessment should be balanced, noting strengths the solution can build on as well as weaknesses.

How this OL 750 Module 2 milestone one example is built

The milestone sets out Halvard Sign Group, an imaginary maker and installer of illuminated signs in Indianapolis that bought Ohio River Signcraft, a 140-person Louisville shop, for $38 million in January 2025. It states the problem as an integration led as an absorption without the acquired workforce's participation or local leadership, then assesses the merged company in four areas: people, with Louisville turnover up from 11 to 34 percent; operations, with on-time installs on Louisville jobs down to 69 percent; customers, with callbacks doubled and a bank rebrand lost; and finances. Krug and Hegarty on who stays after an acquisition, the Stahl and Voigt meta-analysis and the Oreg team's review interpret the data.

Where the OL 750 Module 2 rubric puts the points

OL 750 Milestone One is usually assessed on a clear and specific problem statement, a thorough organizational assessment supported by data, analysis that links the evidence to the problem, identification of stakeholders and scope and use of program concepts and research. Top papers show the problem's significance in measurable terms, separate cause from symptom, present data in a readable form and note the organization's strengths. Credit is lost when the problem is vague or is really a solution in disguise, when the assessment relies on opinion, when data are presented without interpretation or when scope is left undefined. APA formatting and organization complete the rubric.

OL 750 Module 2 help: the mistakes that cost points

Gather data before writing: turnover and absence figures, survey results, operational measures such as on-time delivery or quality, customer data and any financial figures you can use. Present them in a compact table and then explain what they show. Write the problem statement last, once the data have told you what it is, and keep it to two or three sentences with a measure in it. A common mistake is a problem statement that already contains the solution, such as the company needs a mentoring program. Another is an assessment that lists departments without showing how they relate to the problem. Note what the organization does well, since Milestone Three will build on those strengths. Define scope so a reader knows what you will not address.

Get OL 750 Module 2 written to your instructions

Upload the OL 750 Milestone One guidelines and describe the organization and problem you chose. A writer drafts a precise problem statement, assesses the organization with data on people, operations, customers and finances, maps stakeholders and scope and links the findings to research, so the literature review in Milestone Two has a clear target. The first OL 750 milestone is free, back in about two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More OL 750 papers and related MS Organizational Leadership samples

OL 750 Module 2 questions, answered

Where can I find a free OL 750 Module 2 Milestone One sample?

Read the full OL 750 Milestone One here: an invented sign company's stalled merger, its problem stated in measurable terms and its organization assessed with data.

What goes in an OL 750 problem statement?

A short statement of the organizational problem, its evidence and significance in measurable terms and why leadership can address it, without proposing the solution yet.

What data should an organizational assessment use?

Whatever shows the organization's condition and the problem's size: turnover, engagement or survey results, operational measures, customer outcomes and financial figures, interpreted rather than just listed.

How do I define the scope of an OL 750 capstone?

State which units, people and time frame the project covers and which related issues you will leave aside, so the solution stays achievable.

Should the assessment include strengths?

Yes. Strengths show what the solution can build on and make the assessment more credible than a list of failures.