| Course | MKT 500 Marketing Strategies |
|---|---|
| Module | Module 10 |
| Paper type | graduate final project presenting a complete strategic marketing plan that takes a new product from an existing corporation from concept to market |
| Length | About 1,460 words, 8 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MS in Marketing |
| Updated | October 2026 |
Free sample paper for MKT 500 Module 10
The Walkway Strategic Marketing Plan: Taking a Battery-Electric Sidewalk Plow From Concept to Market
[Student Name]
Southern New Hampshire University
MKT 500: Marketing Strategies
Final Project: Strategic Marketing Plan
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
The Walkway Strategic Marketing Plan: Taking a Battery-Electric Sidewalk Plow From Concept to Market
Executive Summary
The recommendation is to bring the Walkway, a quiet battery-run sidewalk blade with an optional brine tank, to five upper Midwest states in September 2028 and to Ontario the following fall. The product answers a need dealers have reported for four winters: grounds crews at universities and hospitals must clear walks before dawn, near sleeping students and patients, with equipment that is loud, burns fuel and cannot draw power from the electric vehicles campuses now buy. The Walkway works quietly for a full shift on its own cold-rated battery, and its brine sprayer cuts salt use enough that a buyer saves about $3,700 over five winters at list price.
The plan targets university grounds departments first and hospital facilities teams second, sells through 60 selected dealers and a cooperative purchasing contract, prices from the buyer's lifetime cost at $10,400 and $13,900 and relies on overnight demonstrations that let buyers hear the difference. It aims to sell 450 units by the end of the second winter. First-year marketing costs $610,000 and development $1.4 million. The largest risks are battery performance in deep cold and a fast response from larger rivals; two cold seasons of testing on real campuses, a warranty covering five winters and a start confined to dealers with institutional accounts answer both.
Company and Opportunity
Wolf River Plow Works, founded in Shawano, Wisconsin, in 1961 and still family owned, earns $118 million a year from truck plows, spreaders, dump bodies and parts, sold through 210 independent dealers across 14 states plus Ontario, Manitoba and Quebec. Revenue has barely moved since 2022 while its gross margin has narrowed from 29 to 25 percent, and plow sales, almost half of revenue, rise or fall by about a quarter with the winter. The plant runs short weeks from February to July. The company's greatest asset is its dealers, who also carry the requests it has not answered: for four winters, institutions have asked them for a quiet sidewalk plow.
Varadarajan (2010) described the subject of strategic marketing as the choices an organization makes about the markets it serves, the products it offers and how it deploys resources to compete in them. For Wolf River, the Walkway is that kind of choice: a product aimed at buyers the company has never served, reached through a channel it already owns.
The Product and the Mission
Two models make up the line: the Walkway 60, a five-foot steel blade carrying its own lithium pack, pump and universal mounts, and the 60B, which pairs the same blade with a brine tank and spray bar. Henard and Szymanski (2001) found in their meta-analysis that product advantage and a close match to customer needs were among the strongest drivers of new product results, and the plan rests on both: quiet operation that a buyer can hear in seconds and a design built from interviews with the crews who will run it.
The company's 1988 mission promises plows and spreaders that keep "America's roads open." Read literally, it excludes sidewalks and Canada. The plan proposes a revision built on keeping people moving safely through winter, which the board will consider in November; the Walkway fits the purpose of the old mission even if not its wording.
Situation Analysis
Three outside forces favor the Walkway: quiet-hours commitments at hospitals and campuses, state and local efforts to reduce road salt and the move to electric utility vehicles. Three work against it: lithium batteries weaken in deep cold, institutional budgets are tight and slow and larger plow brands could add electric models within two or three winters. Institutions buy through groups that include grounds supervisors, facilities directors, purchasing officers and risk managers, so the plan must persuade several people with different concerns.
The weighted SWOT showed the company's strongest asset, its dealers, meeting its most serious gap, no relationships with institutional buyers, and its two best opportunities depending on the battery that is also its largest threat. Pairing the four lists produced four strategies that the plan adopts together: launch through dealers with institutional customers, move fast and compete on service rather than price, close the battery and buyer gaps through a supplier and a specialist, and contain the downside by testing first, guaranteeing the battery and starting in five states only.
Customers and Objectives
Thirty interviews with grounds supervisors, facilities directors and risk managers ranked speed before dawn first, then noise, cold-weather reliability and slip-and-fall claims. A survey of 412 facility buyers found 55 percent interested overall and 63 percent among universities, with universities also the most likely to own electric vehicles. A five-winter cost comparison showed the Walkway with sprayer costing $29,100 to own against $33,500 for a gasoline plow at the original price assumption.
Objectives
| Objective | Target | Deadline |
|---|---|---|
| Walkway units sold, all models | 450, including 200 or more 60B units | Close of the 2029-30 season |
| Dealers trained with demonstration units | 60 | Launch, September 2028 |
| Awareness among target buyers in launch states | 40 percent | End of first winter |
| Repeat orders from first-year buyers | 25 percent of institutions | End of third winter |
Targeting and Positioning
Of six segments scored on size, fit, reachability and competition, universities ranked first and hospitals second. Snow removal contractors, the largest group, were deliberately deferred because they buy on price and are loyal to larger brands. The launch position, in brief: to campus and hospital crews racing the morning shift change, the Walkway offers a plow that barely makes a sound, never borrows power from the vehicle, survives the coldest night and pays for itself over five seasons, with a dealer on call after midnight.
Marketing Mix
Each Walkway comes with a five-winter battery and pump warranty, crew training in pre-storm brining and a loaner within 12 hours during a storm. Hinterhuber (2008) showed that most firms still price from cost or rivals despite the case for pricing from customer value. This plan does the reverse: the 60B's value to a buyer, the price of a gasoline plow plus five winters of avoided running costs, is about $17,600, and the list price of $13,900 leaves the buyer ahead while giving Wolf River about $2,740 per unit after a 22 percent dealer margin. The Walkway 60 lists at $10,400.
Sixty dealers that already sell to institutions and can service at night receive protected institutional territories and a higher margin. A cooperative purchasing contract lets public universities buy without a separate bid, with the local dealer delivering and servicing. Promotion centers on demonstrations held before dawn beside the buyer's own gasoline plow, supported by videos with measured sound, trade shows for facilities managers and a lifetime-cost calculator.
Global Entry
Ontario follows in the second winter through Wolf River's existing Canadian dealers. The charger must be certified by an accredited Canadian body, battery packs must ship under dangerous-goods rules and all Canadian labels, manuals and warranties will be bilingual so that the same materials serve Quebec, where French is required. Canadian dealers lead every sale, and Canadian case studies replace American ones as soon as possible.
Implementation and Control
The calendar runs from supplier selection in January 2027 through two field winters to commercial launch in September 2028 and a formal review in April 2029, with an owner for every step and a new institutional sales specialist. Noble and Mokwa (1999) found that managers' commitment to carrying out a marketing strategy depends heavily on whether they see the strategy as fitting the organization's direction and their own role as important; regional managers therefore earn goal credit for demonstrations, and dealers and regional managers sit on the launch team. A monthly dashboard tracks dealers trained, demonstrations, quotes, units, warranty claims and buyers' salt savings, each with a trigger and a named response.
Risks
The battery is the risk that could end the launch: a public failure on a cold night would travel faster than any advertisement. Field testing, the warranty and the loaner policy are the answer. A larger rival's electric plow is likely within three winters, which makes speed and service, not patents, the defense. Institutional budgets may slow sales below target, in which case the board should judge the first winter by demonstrations and quotes rather than units alone. Finally, the company's own caution could starve the launch of attention once plow season begins; giving the Walkway its own product manager, budget and board review protects it.
Conclusion
The Walkway uses what Wolf River already has, its dealers, its fabrication skill and its idle spring capacity, to reach buyers with a need nobody is meeting well. The plan asks the board to approve development, the specialist hire and the first-year budget, and to judge the result in April 2029.
References
Henard, D. H., & Szymanski, D. M. (2001). Why some new products are more successful than others. Journal of Marketing Research, 38(3), 362-375. https://doi.org/10.1509/jmkr.38.3.362.18861
Hinterhuber, A. (2008). Customer value-based pricing strategies: Why companies resist. Journal of Business Strategy, 29(4), 41-50. https://doi.org/10.1108/02756660810887079
Noble, C. H., & Mokwa, M. P. (1999). Implementing marketing strategies: Developing and testing a managerial theory. Journal of Marketing, 63(4), 57-73. https://doi.org/10.1177/002224299906300406
Varadarajan, R. (2010). Strategic marketing and marketing strategy: Domain, definition, fundamental issues and foundational premises. Journal of the Academy of Marketing Science, 38(2), 119-140. https://doi.org/10.1007/s11747-009-0176-7
What the MKT 500 Module 10 instructions ask for
The MKT 500 Final Project usually asks for a complete strategic marketing plan for a new product or service from an existing corporation, assembled from the milestones submitted in Modules One through Nine and revised in light of feedback. Expect the plan to include an executive summary, the company and its mission, the product, the situation analysis and SWOT, customer analysis, marketing objectives, segmentation, targeting and positioning, the marketing mix, any global considerations, implementation, evaluation and control. Graders reward a plan that persuades as a whole instead of reading like nine stapled assignments: each section leads to the next, figures match from beginning to end and the recommendation follows from the evidence. It also states the main risks and what the company will do about them.
How this MKT 500 Module 10 final project example is built
The sample presents the full plan for the Walkway, the composite company's battery-electric sidewalk plow. It opens with a one-page executive summary and then covers the company and its dependence on snowfall, the product, the mission and its proposed revision, the environment, a weighted SWOT turned into four strategies, interview and survey findings, four objectives, the choice of university grounds teams first, a position built on quiet, a full shift and lifetime cost, value-based prices, 60 selected dealers, overnight demonstrations, an Ontario launch, the calendar, the $610,000 first-year budget, the control dashboard and the main risks. Varadarajan, Henard and Szymanski, Hinterhuber and Noble and Mokwa anchor key decisions.
Where the MKT 500 Module 10 rubric puts the points
The MKT 500 Final Project rubric generally weighs the executive summary, the situation analysis, the strength of the customer and market evidence, the clarity of objectives, how well the targeting follows from the segments, whether the four mix decisions agree, the treatment of global factors, the implementation and control plan and the overall integration, research and writing. Top plans read as a single argument with consistent numbers and show that milestone feedback was used. Plans lose marks when sections contradict each other, when figures change between sections without explanation, when the executive summary merely lists contents or when risks are ignored. A plan that shows how earlier choices changed after new evidence demonstrates strategic thinking.
MKT 500 Module 10 help: the mistakes that cost points
Revise each milestone before you join them, using your instructor's comments. Build a table of every key figure, such as prices, segment sizes, objectives and budgets, and make sure each appears the same way everywhere. Write transitions so each section leads to the next. Where a later milestone changed an earlier choice, say so and explain why. Add a risks section if your milestones lacked one. Leave the opening summary until everything else is finished, then fit onto a single page what you sell, to whom, on what promise, at what price and through which channel, plus the targets, the cost and the payoff. Check that every cited source appears in the reference list.
Get MKT 500 Module 10 written to your instructions
Upload the MKT 500 Final Project guidelines along with your nine graded milestones. We revise and join them into one strategic marketing plan with an executive summary, consistent figures throughout, the instructor's comments addressed and research behind each decision. A first final plan is written free and typically returned in about two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More MKT 500 papers and related MS in Marketing samples
- MKT 500 Module 1 Milestone One: Corporation Selection and Research
- MKT 500 Module 2 Milestone Two: New Product Proposal
- MKT 500 Module 3 Milestone Three: Mission Statement Analysis
- MKT 500 Module 4 Milestone Four: Environmental Analysis
- MKT 500 Module 5 Milestone Five: SWOT Analysis
- MKT 500 Module 6 Milestone Six: Customer Research and Marketing Objectives
- MKT 500 Module 7 Milestone Seven: Segmentation, Targeting and Positioning
- MKT 500 Module 8 Milestone Eight: Marketing Mix and Global Entry
- MKT 500 Module 9 Milestone Nine: Implementation, Evaluation and Control
- MKT 625 Module 5 Customer Journey Assignment: Customer Journey Mapping and Touchpoints
- OL 751 Module 5 Milestone Three: The Detailed HR Proposal
- OL 630 Module 8 Discussion: Business Failure and Closure
- SPT 565 Module 8 International Event Assignment: Hosting a Liga MX Friendly
MKT 500 Module 10 questions, answered
Where can I find a free MKT 500 Module 10 Final Project sample?
This page contains the complete MKT 500 Final Project: a strategic marketing plan for a composite snowplow maker's battery-electric sidewalk plow, from company analysis to control.
What does the MKT 500 strategic marketing plan include?
An executive summary, company and mission, product, situation analysis and SWOT, customer analysis, objectives, segmentation, targeting and positioning, the marketing mix, global entry, implementation and control.
How do I turn the MKT 500 milestones into the final project?
Revise each milestone using feedback, reconcile all figures, add transitions and an executive summary, and present the result as one plan with a single line of reasoning.
How long is the MKT 500 final project?
Length varies by section, but complete plans often run 15 to 25 pages plus tables; follow your guidelines and keep every required element.
What is the most common mistake in a strategic marketing plan?
Sections that do not agree with one another, such as a premium position paired with a low price or objectives that ignore the customer data.