| Course | OL 630 Entrepreneurship and Small Business Management |
|---|---|
| Module | Module 8 |
| Paper type | graduate discussion post on what business failure means, its costs and how founders plan for it |
| Length | About 340 words, 3 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MS Organizational Leadership |
| Updated | October 2026 |
Free sample paper for OL 630 Module 8
Module Eight Discussion
What Failure Would Look Like
I imagined that it is March two years from now and Curbside Tread Co. has closed. Why? The most likely story: fleet trials converted slowly, a big-box tire chain launched mobile vans in Columbus in our second spring, our technician left with two fleet accounts and I was working sixty-hour weeks with no break. Any one of those could be survived. Together they would empty the reserve and the line of credit.
Headd (2003), studying businesses that closed, found that about a third of owners reported their business was successful when it closed; many closed for reasons such as retirement or a better opportunity rather than losses. That matters for how I think about the triggers I set in Module 6: closing a household line, or even the business, on purpose and with debts paid is different from failing.
Ucbasaran et al. (2013), reviewing research on life after business failure, described financial costs, such as debt and lost savings, social costs, such as damaged relationships and stigma, and psychological costs, such as grief and lowered confidence, and noted that how founders interpret failure shapes whether they learn and try again. Shepherd (2003) argued that the loss of a business can bring real grief and that recovering from it is what allows a founder to learn rather than avoid thinking about what happened. My largest exposure is financial: I will personally guarantee the $240,000 SBA loan. If the vans sold for half their cost, I could owe more than $100,000.
I will keep my home out of the collateral, carry disability and life insurance sized to the loan, sign noncompete and nonsolicitation agreements with technicians, build relationships with every fleet account myself and take one full day off each week from month four. I will also review the pre-mortem every quarter with my adviser, adding any new risk that shows up in the numbers before it shows up as a crisis.
When you imagine your own venture closed two years from now, which risk had you not considered until you tried?
References
Headd, B. (2003). Redefining business success: Distinguishing between closure and failure. Small Business Economics, 21(1), 51-61. https://doi.org/10.1023/A:1024433630958
Shepherd, D. A. (2003). Learning from business failure: Propositions of grief recovery for the self-employed. Academy of Management Review, 28(2), 318-328. https://doi.org/10.5465/amr.2003.9416377
Ucbasaran, D., Shepherd, D. A., Lockett, A., & Lyon, S. J. (2013). Life after business failure: The process and consequences of business failure for entrepreneurs. Journal of Management, 39(1), 163-202. https://doi.org/10.1177/0149206312457823
What the OL 630 Module 8 instructions ask for
The eighth OL 630 discussion asks students to think about failure: why small businesses close, what failure costs the people involved and how founders can prepare. Expect to apply research on business closure and its consequences to your own venture or the one you are studying. Graduate posts should distinguish failure from closure, since many businesses close for reasons other than losing money, and should consider the financial, social and psychological costs founders bear. A pre-mortem, imagining the business has failed and asking why, is a useful way to make the discussion concrete. Replies should ask classmates which of their own risks they had not considered before.
How this OL 630 Module 8 discussion example is built
The sample comes from the founder of Curbside Tread Co., an imagined mobile tire service in Columbus, Ohio, who runs a pre-mortem by imagining the business closed two years after launch and listing the most likely reasons: fleet trials that never converted, a big-box chain launching its own mobile vans, a technician who left with key accounts and a founder worn down by sixty-hour weeks. Headd's finding that a substantial share of closed businesses were successful when they closed, Ucbasaran, Shepherd, Lockett and Lyon's review of life after business failure and Shepherd's account of grief recovery after failure frame the reflection. The founder names his largest exposure, the personal guarantee on the SBA loan, sets steps to limit it and asks classmates how they would plan for a venture that does not work.
Where the OL 630 Module 8 rubric puts the points
In the eighth OL 630 discussion, instructors typically look for accurate use of research on closure and failure, a concrete pre-mortem or failure analysis, attention to the financial, social and psychological costs for founders, practical steps to limit exposure and replies that probe classmates' unconsidered risks. The strongest OL 630 posts treat failure as a scenario to plan for rather than a taboo. Posts lose credit for confusing closure with failure, for listing generic reasons businesses fail without tying them to the venture, for ignoring the founder's personal financial exposure or for replies that reassure rather than ask about risks.
OL 630 Module 8 help: the mistakes that cost points
Imagine your business has closed two years after launch and write down the most likely reasons, as specifically as you can. For each, ask whether you could see it coming and what early sign would warn you. Use research to separate failure from closure, since owners close businesses for many reasons, and to understand what failure costs founders financially, socially and emotionally. Identify your largest personal exposure, such as a guaranteed loan or a pledged home, and decide how to limit it. Think about what you would learn and how. Close by asking OL 630 classmates which risk they had not considered until now, and in replies ask what early sign they will watch.
Get OL 630 Module 8 written to your instructions
Tell us about your venture and paste the OL 630 Module 8 prompt. We draft a post that runs a pre-mortem on the business, separates closure from failure using research, weighs the costs a founder would bear and proposes steps to limit them, then asks OL 630 classmates how they would plan for failure. The first post for this module is free and ready in two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More OL 630 papers and related MS Organizational Leadership samples
- OL 630 Module 1 Discussion: Opportunity Recognition
- OL 630 Module 2 Customer Discovery Assignment: Testing a Business Idea
- OL 630 Module 3 Milestone One: Business Concept and Market Analysis
- OL 630 Module 4 Discussion: Hiring and HR in a Small Business
- OL 630 Module 5 Milestone Two: Marketing, Operations and Management Plan
- OL 630 Module 6 Discussion: Founder Traits and Persistence
- OL 630 Module 7 Milestone Three: Financial Plan and Funding
- OL 630 Module 9 Final Project: Business Plan
- OL 630 Module 10 Discussion: Entrepreneurial Exit
- ACC 660 Module 1 Discussion: The Controller Under a Private Equity Owner
- MKT 625 Module 9 Discussion: Managing Online Reviews and Reputation
- MKT 645 Module 9 Discussion: Channel Conflict With Offline Partners
- ACC 610 Module 2 Codification Research Assignment: Principal or Agent for Spraying Services
OL 630 Module 8 questions, answered
Where can I find a free OL 630 Module 8 Discussion sample?
The complete OL 630 Module 8 post is on this page: a mobile tire founder runs a pre-mortem and weighs the costs of failure.
Is closing a business the same as failing?
No. A study of closed small businesses found a substantial share were successful when they closed; owners close for many reasons, including retirement and better opportunities.
What are the costs of business failure for founders?
Research describes financial costs such as debt and lost savings, social costs such as damaged relationships and reputation and psychological costs such as grief and lowered confidence.
What is a pre-mortem?
An exercise in which a team imagines a project has already failed and works backward to identify the most likely causes, so they can be prevented or watched for.
Do entrepreneurs learn from failure?
They can, but grief and the way failure is interpreted affect learning; recovering emotionally helps founders draw lessons rather than avoid the experience.