| Course | OL 630 Entrepreneurship and Small Business Management |
|---|---|
| Module | Module 10 |
| Paper type | graduate discussion post reflecting on entrepreneurial exit options and what the founder wants from the business in the long run |
| Length | About 340 words, 3 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MS Organizational Leadership |
| Updated | October 2026 |
Free sample paper for OL 630 Module 10
Module Ten Discussion
Planning the Exit Before the Start
Before I sign for an SBA loan and buy a van, it seems odd to think about leaving Curbside Tread Co. But the way I hope to leave should shape what I build.
DeTienne (2010) treated leaving as a stage of entrepreneurship with its own logic rather than a footnote to it, and that founders' exit intentions shape their decisions long before they leave. Wennberg et al. (2010), studying founders' exits, distinguished four routes, harvest sales, distress sales, harvest liquidations and distress liquidations, and found that they were driven by different factors, including the founder's human capital and the firm's performance. Hurst and Pugsley (2011) showed that most new owners expect to stay small and value perks money cannot measure, like answering to no boss and setting their own hours.
I could build Curbside to sell to a regional tire chain, which would mean growing fleet accounts fast and documenting everything. I could sell gradually to a lead technician over five to seven years. I could run it as a stable income until retirement. Or I could close it on purpose once the loan is paid. Honestly, I want independence more than wealth, which points to the second or third option. A sale to a chain would pay the most, but it would also mean building a company designed to be absorbed, with growth targets I did not start this business to chase.
If a gradual employee sale is the likely exit, fleet relationships cannot depend on me alone, processes must be written down and the books must be clean from day one. The technician I hire should be someone who could lead the business someday.
I came in with a household business in my head and leave with a fleet business on paper, tested by real customers. The biggest lesson was to test before spending, and the second was to decide in advance what evidence would make me stop.
How do you picture leaving your own venture someday, and what would you do differently now because of it?
References
DeTienne, D. R. (2010). Entrepreneurial exit as a critical component of the entrepreneurial process: Theoretical development. Journal of Business Venturing, 25(2), 203-215. https://doi.org/10.1016/j.jbusvent.2008.05.004
Hurst, E., & Pugsley, B. W. (2011). What do small businesses do? Brookings Papers on Economic Activity, 2011(2), 73-118. https://doi.org/10.1353/eca.2011.0017
Wennberg, K., Wiklund, J., DeTienne, D. R., & Cardon, M. S. (2010). Reconceptualizing entrepreneurial exit: Divergent exit routes and their drivers. Journal of Business Venturing, 25(4), 361-375. https://doi.org/10.1016/j.jbusvent.2009.01.001
What the OL 630 Module 10 instructions ask for
The final OL 630 discussion asks students to look ahead to the end of the entrepreneurial process, exit, and back over the course. Expect to consider how you, or the founder you studied, might eventually leave the business, through sale, succession, closure or another route, and how that intended exit shapes decisions now. Graduate posts should use research on entrepreneurial exit, which treats it as a planned part of the process rather than an afterthought, and should connect exit to what the founder wants from the business: wealth, independence, a legacy or something else. Reflection on what the course changed is usually expected. Replies should ask classmates which present decision their exit plan would change.
How this OL 630 Module 10 discussion example is built
The sample comes from the founder of Curbside Tread Co., an imagined mobile tire service in Columbus, Ohio, who, before buying the first van, considers four ways he might eventually leave: selling to a regional tire chain, selling to a lead technician over several years, running the business as a stable source of income until retirement or closing it on purpose when the loan is repaid. DeTienne's argument that exit belongs to the entrepreneurial process, Wennberg, Wiklund, DeTienne and Cardon's study of four exit routes with different drivers and Hurst and Pugsley's evidence that many owners value independence over growth frame his choice. He explains how a likely exit, a gradual sale to employees, changes what he does now, reflects on the course and asks classmates how they picture leaving.
Where the OL 630 Module 10 rubric puts the points
The final OL 630 discussion is marked on careful use of exit research, a thoughtful comparison of exit routes, a clear link between the intended exit and present decisions, honest reflection on the founder's goals and on the course and replies that probe classmates' plans. The strongest OL 630 reflections show that thinking about the end changes how the business is built. Posts lose credit for treating exit as only a sale for profit, for ignoring the founder's personal goals, for reciting the syllabus instead of reflecting or for replies that admire classmates' plans without asking what they would change today.
OL 630 Module 10 help: the mistakes that cost points
List the realistic ways you could leave the business: sale to a competitor or larger firm, sale to employees or family, running it until retirement or closing it. Ask what each would require you to build now, such as transferable customer relationships, documented processes or clean financial records. Use research on exit to understand that routes differ, that some are planned harvests and others distress and that their drivers differ. Be honest about what you want: money, independence, legacy or something else. Explain how your likely exit changes a decision you face now. Say in a few lines how the term shifted your view of your venture. Close by asking OL 630 classmates how they picture leaving their ventures.
Get OL 630 Module 10 written to your instructions
Paste the OL 630 Module 10 prompt and a few notes on your venture and what you want from it long term. We draft a closing post that weighs exit routes with research on entrepreneurial exit, connects them to choices you make now and ends with a question that invites OL 630 classmates to imagine their own exits. Your first OL 630 closing post is free and arrives within two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More OL 630 papers and related MS Organizational Leadership samples
- OL 630 Module 1 Discussion: Opportunity Recognition
- OL 630 Module 2 Customer Discovery Assignment: Testing a Business Idea
- OL 630 Module 3 Milestone One: Business Concept and Market Analysis
- OL 630 Module 4 Discussion: Hiring and HR in a Small Business
- OL 630 Module 5 Milestone Two: Marketing, Operations and Management Plan
- OL 630 Module 6 Discussion: Founder Traits and Persistence
- OL 630 Module 7 Milestone Three: Financial Plan and Funding
- OL 630 Module 8 Discussion: Business Failure and Closure
- OL 630 Module 9 Final Project: Business Plan
- MGT 701 Module 5 Milestone One: Critical Issue Analysis and Problem Statement
- FIN 550 Module 1 Discussion: Whose Interests the Firm Should Serve
- BMB 655 Module 3 Milestone One: A Financial Analysis of the Publisher
- MGT 630 Module 6 Discussion: Percent Plan Complete on the Framing Floors
OL 630 Module 10 questions, answered
Where can I find a free OL 630 Module 10 Discussion sample?
The full OL 630 Module 10 reflection is on this page: a mobile tire founder plans how he might exit the business before it launches.
What is entrepreneurial exit?
The process by which founders leave the businesses they created, through sale, succession, closure or other routes, which research treats as part of the entrepreneurial process.
In what ways can an owner leave a small business?
Selling to an outside buyer, selling to employees or family, passing the business to a successor or closing it, either as a planned harvest or under financial distress.
Why should founders plan an exit early?
Because the intended exit shapes what to build now, such as documented processes, customer relationships that do not depend on the founder and clean records.
Is growth the goal for most owners of small firms?
Research finds many do not; owners often value independence and flexible hours over growth, which affects how and when they choose to exit.