MGT 701 Module 5 Milestone One Example

Reviewed by Portia Lambrick, MBA

This MGT 701 Module 5 Milestone One sample presents a critical issue analysis: the evidence that an issue matters, the root causes behind it, a precise problem statement and the criteria any solution must meet. SNHU MGT 701 (MGT-701) has MS in Management students in Milestone One define the issue their capstone will resolve. Cayadutta Leather Works, a composite family glove maker, is losing a customer worth 38 percent of its sales. The milestone traces that vulnerability to its causes, states the problem in one sentence, sets the scope and lists decision criteria, grounded in research on how strategic decisions are diagnosed and why many fail.

CourseMGT 701 Critical Issues in Management Capstone
ModuleModule 5
Paper typegraduate milestone presenting a critical issue analysis with root causes, a problem statement and decision criteria
LengthAbout 1,010 words, 6 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMS in Management
UpdatedOctober 2026

Free sample paper for MGT 701 Module 5

1

Why One Customer Could Hurt So Much: The Critical Issue Analysis for Cayadutta Leather Works

[Student Name]

Southern New Hampshire University

MGT 701: Critical Issues in Management Capstone

Milestone One: Critical Issue Analysis

[Instructor Name]

[Date]

The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.

What this page is doingCayadutta Leather Works, its data and its people are invented for this capstone.
2

Why One Customer Could Hurt So Much: The Critical Issue Analysis for Cayadutta Leather Works

Background

Cayadutta Leather Works is a third-generation family company in Gloversville, New York, with 84 employees and $14.2 million in annual revenue. Its product line runs from cowhide work gloves to lined dress gloves, belts and wallets. For twenty years its largest customer has been a national farm and ranch retail chain, which buys private-label work gloves and accounted for $5.4 million, or 38 percent, of last year's sales. That retailer's buyers have said the private-label order goes to a factory abroad once the current agreement runs out, fourteen months from now.

What this page is doingIntroduces the organization.
3

Why Diagnosis Comes First

Mintzberg et al. (1976), studying 25 strategic decision processes, found that such decisions move through identification, development and selection, with diagnosis as a key routine in the identification phase, and that processes frequently cycle back when later steps reveal the problem was misunderstood. Nutt (1999) tracked 358 real decisions in midsize and large organizations and saw roughly one in two fall apart; the failures shared a pattern of a manager's pet answer pushed through with authority after a narrow look at options, while the successes began by showing people why action was needed, naming the goal, scanning broadly and bringing the affected people in. At Cayadutta, the owner's first instinct was to cut the price to keep the chain, an imposed solution offered before the problem had been examined. This milestone examines it first.

What this page is doingGrounds the approach.
4

Evidence

Evidence of the critical issue

IndicatorFinding
Share of revenue from largest customer38%
Share of revenue from five largest customers61%
Gross margin on the departing account24%, lowest of four segments
Gross profit lost when the account endsAbout $1.3 million a year
Operating cash earnings (EBITDA), with the chain and without itAbout $1.1 million, then a loss near $0.2 million
Cutters over age 5511 of 14
Apprentice cutters trained since 2014None
Industrial orders declined for delivery time last year23 orders, about $410,000

Two facts in the table tell most of the story. The company depended on one customer that earned it the least per dollar of sales, and the skill that makes its gloves different rests with people close to retirement.

What this page is doingShows the size of the issue.
5

Root Causes

Root cause chain

QuestionAnswer
Why will the loss hurt so much?One customer provides 38% of revenue and fills 40% of production hours
Why did one customer grow so large?Its steady orders filled capacity, so the company stopped looking for other business
Why did the company stop looking?It has had no dedicated salesperson since 2005; the owner sells part-time
Why have other segments not grown?Industrial buyers were turned away for slow delivery when the chain's orders took priority, and the own brand has had almost no marketing budget
Why is the core skill at risk?No apprentice has been trained since 2014, and cutting wages fell behind other local manufacturers

The chain points to three root causes that management controls: an absence of selling, a production schedule that put one customer ahead of all others and a failure to renew skills. The departing customer is not a cause. It is the event that exposed them. Each of the three causes also suggests where a solution must work: in selling to new customers, in scheduling the plant so that no single buyer crowds out the rest and in training the next generation of cutters. A response that addresses only one of them, such as hiring a salesperson without freeing capacity or training apprentices without new orders to give them, would leave the company exposed again.

What this page is doingTraces the vulnerability back.
6

Framing the Issue

Dutton and Jackson (1987) proposed that the label managers attach to a strategic issue matters: called a threat, it tends to draw guarded, narrow moves; called an opportunity, it opens a wider search. Framed only as a threat, the chain's departure invites cost cuts and a price fight. Framed as an opportunity, it frees 40 percent of the plant's hours for customers who value what the company does well and who were turned away when the chain came first. This analysis treats it as both: a real threat to the company's finances that also creates room for change.

What this page is doingChooses how to label it.
7

Problem Statement

Cayadutta Leather Works depends on one low-margin customer for 38 percent of revenue and on 14 aging cutters for its core skill. With that customer leaving in fourteen months, the company must replace about $1.3 million in annual gross profit within 24 months while keeping and renewing the cutting skill that gives it an advantage, or it will breach its loan covenant and begin to shrink.

What this page is doingStates what must be achieved.
8

Scope

The scope is deliberately limited to what the company can act on within the next two years.

The capstone covers the company's customer base, product and market choices, sales capability and workforce skills, and the implementation of the recommended response over 24 months. It does not cover the family's ownership succession, which the board is handling separately, or a full redesign of the plant's layout, although equipment needed for the response is included.

What this page is doingSets the boundaries.
9

Decision Criteria

Decision criteria

CriterionTargetWeight
Profit restoredReplace at least $1.3 million in annual gross profit, net of new costs, by month 2430%
Financial riskKeep earnings at least three times interest throughout; investment paid back within two years20%
Fit with resourcesBuild on hand-cutting skill and the heritage brand20%
Time to resultsMeaningful new gross profit within 12 months15%
Employees and communityKeep at least 12 cutters and add apprentices; avoid layoffs beyond attrition15%

The weights reflect the bank's covenant, which makes profit and financial risk the first concerns, and the family's stated wish to keep the business in Gloversville, which makes employees and community a real criterion rather than an afterthought.

What this page is doingSets the tests any solution must pass.
10

Conclusion

Cayadutta's critical issue is not losing a customer but having built a business that one customer's decision could break. The problem statement asks the capstone to replace lost gross profit within two years while renewing the skill at the company's core, and the decision criteria will judge every alternative against the same standard.

What this page is doingSums up.
11

References

Dutton, J. E., & Jackson, S. E. (1987). Categorizing strategic issues: Links to organizational action. Academy of Management Review, 12(1), 76-90. https://doi.org/10.2307/257995

Mintzberg, H., Raisinghani, D., & Theoret, A. (1976). The structure of "unstructured" decision processes. Administrative Science Quarterly, 21(2), 246-275. https://doi.org/10.2307/2392045

Nutt, P. C. (1999). Surprising but true: Half the decisions in organizations fail. Academy of Management Executive, 13(4), 75-90. https://doi.org/10.5465/ame.1999.2570556

What the MGT 701 Module 5 instructions ask for

Milestone One in MGT 701 typically asks you to present the critical issue your capstone will address: background on the organization, evidence that the issue is significant, analysis of its causes, a clear problem statement and the scope of the project. Many versions also ask for the criteria a solution must meet. A strong milestone uses data to show why the issue matters, traces causes back past the obvious explanation, writes a problem statement specific enough to guide the rest of the project and sets criteria before any solution is considered, so that the later evaluation of alternatives is fair rather than designed to favor a preferred answer.

How this MGT 701 Module 5 milestone one example is built

The sample presents Cayadutta Leather Works' issue. Evidence shows 38 percent of sales with one departing buyer and 11 of 14 skilled cutters over 55. A root cause chain traces the vulnerability to twenty years without a dedicated salesperson, industrial buyers turned away for slow delivery and no apprentice trained since 2014. The problem statement names the need to replace about $1.3 million in annual gross profit while renewing the cutting skill. Five decision criteria follow. Mintzberg, Raisinghani and Théorêt on diagnosis, Nutt on why decisions fail and Dutton and Jackson on issue labels support the approach. It also shows how each root cause points to where a solution must work.

Where the MGT 701 Module 5 rubric puts the points

Graders of this first MGT 701 milestone weigh how clear and important the issue is, how well evidence supports it, how deep the root cause work goes, how exact the problem statement is, whether scope and criteria are set, and the research and writing. Strong milestones quantify the issue, trace causes to things management can change, write a problem statement that names what must be achieved and set criteria before discussing solutions. Weak ones describe the issue in general terms, stop at the first cause, write a problem statement that already contains the answer or define a scope too broad to analyze in the time available.

MGT 701 Module 5 help: the mistakes that cost points

Start with a short background and the evidence that the issue matters, using numbers wherever possible. Then ask why the issue arose, repeating the question until you reach causes management can change, and show the chain. Write the problem statement in one or two sentences that say what must be achieved without naming the solution. Define what the capstone will and will not cover. Finally, set four to six decision criteria, with targets where possible, that any alternative will be judged against. Use research on decision making to explain why you diagnose before you search for solutions. Check that your problem statement could be met by more than one solution, which shows it does not assume the answer.

Get MGT 701 Module 5 written to your instructions

Share the MGT 701 Milestone One guidelines and your work so far. We set out the background and evidence, trace root causes, write a precise problem statement, define scope and set decision criteria, with research on diagnosis and decision making behind each step. Milestone One is written for you free the first time, normally inside two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More MGT 701 papers and related MS in Management samples

MGT 701 Module 5 questions, answered

Where can I find a free MGT 701 Module 5 Milestone One sample?

The complete MGT 701 Module 5 Milestone One is published here: a critical issue analysis for a family glove maker losing its largest customer.

What makes a good problem statement?

It states specifically what the organization must achieve or resolve, with measurable terms where possible, without naming the solution in advance.

What is root cause analysis?

A method of tracing a problem back through its causes, often by repeatedly asking why, until reaching causes that management can change.

Why set decision criteria before considering solutions?

Criteria set in advance keep the evaluation of alternatives fair and prevent managers from shaping criteria to fit a preferred option.

Why do many management decisions fail?

A study of 358 decisions found failures were linked to imposing solutions, limiting the search for alternatives and using power to push plans through.