This MGT 701 Module 9 Discussion sample looks at resistance during implementation and how a leader can respond without either forcing the change or abandoning it. SNHU MGT 701 (MGT-701) asks MS in Management students in the later modules to consider leadership of the change their capstone proposes. The post follows Cayadutta Leather Works, a composite family glove maker, where the most senior cutter sees a new cutting machine as a threat to his trade. It reads his reaction through research on resistance, commitment to change and change leadership, recommends giving him control over the machine's use and asks classmates how they have turned resistance into leadership.

CourseMGT 701 Critical Issues in Management Capstone
ModuleModule 9
Paper typegraduate discussion post on resistance to change and how leaders respond to it
LengthAbout 350 words, 3 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMS in Management
UpdatedOctober 2026

Free sample paper for MGT 701 Module 9

1

Module Nine Discussion

The Cutter Who Said No to the Machine

Four months into the rollout I designed for the glove company, the computer-guided cutter was bolted to the floor. The next morning the most senior cutter, who has worked at the bench for 41 years and trained most of the others, told the plant manager that the machine was "the first step to getting rid of us" and that he would not teach apprentices to run it.

What this page is doingThe moment.
2

His concern has content, and it deserves a straight answer rather than reassurance. Machines have replaced skilled workers in this industry before, and nobody had told him which work the machine would do. Oreg (2003) found that resistance has dispositional sources, including emotional reaction to imposed change and routine seeking, and the machine arrived exactly that way, imposed and disruptive to a routine of four decades. Herscovitch and Meyer (2002) reported that employees who back a change because they believe in it go well beyond compliance, while those who stay only because leaving costs too much rarely do. Right now he has only the second kind: he stays because he must, and that is a weak foundation for teaching apprentices.

What this page is doingReading the resistance.
3

Higgs and Rowland (2005) found that leaders who framed change and built others' capacity to carry it out achieved more than those who drove change through their own actions. I would ask him to decide, with the advisory group, which patterns go to the machine and which stay hand-cut, and to lead the apprenticeship. The machine takes the simple, repetitive cuts; the complex work, where his skill matters, grows with the industrial orders. If he still refuses, I would not force him onto the machine; his hand-cutting is too valuable. I would also show him the order numbers each month, so he can see for himself that the complex hand-cut work is growing, not shrinking. His reaction is a warning the plan should have heeded earlier: the machine should have been explained to the cutters before it arrived, not after.

What this page is doingWhat I would do.
4

Have you seen someone who resisted a change become one of its leaders, and what made the difference?

What this page is doingA question for classmates.
5

References

Herscovitch, L., & Meyer, J. P. (2002). Commitment to organizational change: Extension of a three-component model. Journal of Applied Psychology, 87(3), 474-487. https://doi.org/10.1037/0021-9010.87.3.474

Higgs, M., & Rowland, D. (2005). All changes great and small: Exploring approaches to change and its leadership. Journal of Change Management, 5(2), 121-151. https://doi.org/10.1080/14697010500082902

Oreg, S. (2003). Resistance to change: Developing an individual differences measure. Journal of Applied Psychology, 88(4), 680-693. https://doi.org/10.1037/0021-9010.88.4.680

What the MGT 701 Module 9 instructions ask for

The Module 9 discussion in MGT 701 often asks about leading the change your capstone recommends, including resistance, communication, motivation or the leader's own role. A strong post takes a specific moment or person, interprets the resistance with research rather than treating it as stubbornness, distinguishes reasonable concerns from opposition to change itself and recommends a response that keeps the change moving while respecting the people involved. It recognizes that resisters often hold knowledge the organization needs, so the best response may draw them into leading part of the change rather than working around them. Admitting what the leader could have done better earlier adds credibility.

How this MGT 701 Module 9 discussion example is built

In the sample, the most senior cutter at Cayadutta Leather Works, 41 years at the bench, tells the plant manager the new cutting machine is the first step toward replacing the cutters. The post uses Oreg's dimensions of dispositional resistance, including emotional reaction to imposed change and routine seeking, Herscovitch and Meyer's three forms of commitment to change and Higgs and Rowland's evidence that leaders who build others' capacity outperform those who drive change themselves. It recommends making him lead trainer and the person who decides which patterns the machine cuts, and asks how classmates have turned a resister into a leader. It also admits the plan should have explained the machine to the cutters before it arrived.

Where the MGT 701 Module 9 rubric puts the points

Change leadership discussions are typically assessed on the depth of the analysis of resistance, use of research, the quality and practicality of the recommended response, attention to the people involved and engagement with peers. Strong posts separate the content of a concern from the emotion around it, use research to interpret both and propose a response that gives the person a real role. Posts drop points when they treat pushback as an obstacle to flatten, wave away concerns that have merit, prescribe nothing beyond extra meetings or answer classmates with simple applause. A note on what the leader would do if the response failed shows realism. Distinguishing a reasonable concern from a dispositional reaction shows careful analysis.

MGT 701 Module 9 help: the mistakes that cost points

Describe a specific moment of resistance in your capstone organization, including what the person said and why it matters. Separate the concern itself, which may be reasonable, from the emotional reaction to how the change arrived. Use research on resistance and commitment to interpret both. Then propose a response that addresses the concern and gives the person a meaningful role, and say what you would do if it did not work. Close by asking classmates how they have turned someone who resisted a change into someone who helped lead it. Say what you would do differently next time, since that shows you learned from the moment.

Get MGT 701 Module 9 written to your instructions

Paste the MGT 701 Module 9 prompt and the resistance or leadership challenge in your capstone. We interpret it with research on resistance, commitment and change leadership and recommend a response, finishing with a question for peers. You pay nothing for that first resistance post, which normally takes two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More MGT 701 papers and related MS in Management samples

MGT 701 Module 9 questions, answered

Where can I find a free MGT 701 Module 9 Discussion sample?

This page carries the complete MGT 701 Module 9 post: a senior craftsman's resistance to a new machine and how leaders can respond.

Why do employees resist change?

Reasons include real concerns about jobs or quality and dispositional factors such as preference for routine and strong emotional reactions to changes imposed on them.

What are the three forms of commitment to change?

Affective commitment based on belief in the change, continuance commitment based on the cost of not supporting it and normative commitment based on a sense of obligation.

Should leaders work around resisters?

Often not; resisters may hold valuable knowledge, and giving them a meaningful role can turn their concern into support.

What leader behaviors support successful change?

Research suggests framing the change and building others' capacity to carry it out tend to work better than leaders driving change mainly through their own actions.