| Course | OL 630 Entrepreneurship and Small Business Management |
|---|---|
| Module | Module 3 |
| Paper type | graduate milestone presenting a business concept, target market, market size estimate and competitive analysis for a new venture |
| Length | About 1,070 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MS Organizational Leadership |
| Updated | October 2026 |
Free sample paper for OL 630 Module 3
The Curbside Tread Co. Concept and Its Market
[Student Name]
Southern New Hampshire University
OL 630: Entrepreneurship and Small Business Management
Milestone One: Business Concept and Market Analysis
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
The Curbside Tread Co. Concept and Its Market
Introduction
Curbside Tread Co. will install tires where customers' vehicles already are: on fleet lots and in household driveways around Columbus, Ohio. Module 2's customer discovery shifted the concept toward fleets, which valued time more, clustered vehicles in one place and bought repeatedly. This milestone sets out the concept, defines target segments, estimates reachable demand, analyzes competitors and positions the business, and lists the assumptions still to be tested.
The Concept
Curbside Tread Co. supplies and installs tires, and performs rotations, balancing and pressure checks, at the customer's location from a fully equipped van. For fleet managers, the value is vehicles back in service the same day without a driver sitting at a shop. For households, it is a free Saturday morning. Tires are sourced from two regional distributors with next-morning delivery, so the business carries little inventory.
Target Segments
The primary segment is fleets of 5 to 60 vehicles: last-mile delivery contractors, landscapers, HVAC and plumbing companies and property managers within the I-270 outer belt and nearby suburbs. The secondary segment is households in four suburbs with high shares of dual-earner families and newer vehicles, served on set route days.
Reachable Demand
Year 2 reachable demand estimate
| Segment | Potential customers in area | Share winnable by year 2 | Tires per customer per year | Tires per year |
|---|---|---|---|---|
| Fleets of 5 to 60 vehicles | About 900 businesses | 4% (36 accounts) | 70 | 2,520 |
| Households in four suburbs | About 61,000 households | 0.5% (305 households) | 4 | 1,220 |
| Total | 3,740 |
The fleet count comes from county business pattern data for the relevant industries, adjusted for companies running five or more vans, as checked against the 15 fleet interviews. The share winnable reflects a two-van operation; tires per fleet account come from trial accounts' records. At an average of $165 per tire installed, including tire, labor and fees, year 2 tire revenue would be about $617,000, with rotations and service adding roughly $90,000.
Competitive Analysis
How customers' alternatives compare
| Alternative | Price | Convenience | Speed for fleets | Trust |
|---|---|---|---|---|
| Dealership service departments | High | Low | Slow; half-day or more | High |
| Big-box tire centers | Low | Low | Slow; waits common | Medium |
| Online retailer's local installers | Low tire price | Medium | Booking lag | Varies |
| Two small mobile operators | Medium | High | Limited capacity | Little known |
| Doing nothing until a tire fails | None up front | None | Costly breakdowns | Not applicable |
Curbside's advantage is strongest with fleets, where existing mobile operators lack capacity and every other option takes vans off the road. Against big-box centers on household price, it will not win; it will win only with households who value time.
Positioning
For Columbus fleet managers who lose money every hour a van sits at a shop, Curbside Tread Co. replaces and services tires on their own lot, before the morning route or after the last stop, so vehicles never leave service.
What Planning Can and Cannot Do
Delmar and Shane (2003) tracked 223 Swedish start-ups launched in early 1998 and saw that founders who had put a plan on paper abandoned their ventures less often and moved faster on products and setup, because the plan pushed founders to decide and to break broad aims into tasks. Brinckmann et al. (2010), pooling dozens of small-firm studies, reported that planning was positively related to performance, with a stronger link in small firms already operating than in start-ups and with results that shifted from one setting to another. Hurst and Pugsley (2011) showed that most small businesses intend to offer an existing service to an existing market rather than to innovate or grow large. Curbside fits that description: it delivers a familiar service in a new place. Its plan must therefore rest on execution, price and capacity, not on novelty.
Pricing Logic
Fleet prices are set per vehicle visit rather than per tire, so fleet managers can budget: $25 per tire installed plus the tire at distributor cost plus 22 percent, with rotations and pressure checks billed at $18 per vehicle when done during a tire visit. That puts Curbside's installed price a little above big-box centers and below dealerships, but the comparison fleet managers make is with lost route hours, which several valued at $60 to $100 an hour during interviews. Household pricing is $35 per tire installed plus the tire, reflecting the travel time found in the pilot, with a route-day discount of $5 per tire for customers who accept the neighborhood's set day. The pricing assumes Curbside will rarely compete on tire price alone and will instead compete on time saved.
Why Fleets Will Switch
Fleet managers interviewed described the decision in practical terms. Their current routine is to send a van to a tire shop when a driver reports a problem, or to wait for a tire to fail on the road, which can cost a day's deliveries and a towing bill. What they want is a supplier who checks tread on a schedule, replaces tires before they fail and works around routes. Seven of the fifteen said they would sign an agreement for scheduled visits if the first two months went well, and three said they already pay a mobile mechanic for oil changes on site, which shows the habit of on-site service exists. The decision maker is usually an operations manager or the owner, and the purchase is repeated rather than one-time, which makes each account worth far more over time than a household customer.
Untested Assumptions
Three assumptions remain. Fleet trials have to turn into signed agreements without cutting the quoted rate. The business must be able to win accounts with 30 to 60 vehicles, which may prefer a larger supplier. And distributors' next-morning delivery must hold during spring and fall peaks. Each will be tested before the financial plan in Milestone Three. The first is the most important: a conversion rate below about half would cut year 2 fleet revenue by a third and push break-even into the third year.
Risks in the Market
Two threats stand out. A big-box tire chain or the online retailer could launch its own mobile vans in Columbus, as some have done in other metros; Curbside's defense is the fleet relationships it builds first and the service reliability that a large chain's scheduled vans may not match. And a slowdown in local delivery and construction work would shrink the fleets Curbside depends on. Spreading accounts across delivery, landscaping, trades and property management, so that no single industry exceeds about a third of fleet revenue, limits that risk.
References
Brinckmann, J., Grichnik, D., & Kapsa, D. (2010). Should entrepreneurs plan or just storm the castle? A meta-analysis on contextual factors impacting the business planning-performance relationship in small firms. Journal of Business Venturing, 25(1), 24-40. https://doi.org/10.1016/j.jbusvent.2008.10.007
Delmar, F., & Shane, S. (2003). Does business planning facilitate the development of new ventures? Strategic Management Journal, 24(12), 1165-1185. https://doi.org/10.1002/smj.349
Hurst, E., & Pugsley, B. W. (2011). What do small businesses do? Brookings Papers on Economic Activity, 2011(2), 73-118. https://doi.org/10.1353/eca.2011.0017
What the OL 630 Module 3 instructions ask for
Milestone One of the OL 630 final project asks students to present the business concept and analyze its market. Expect to describe the product or service and the problem it solves, define target customers, estimate the size of the market the business can realistically reach, analyze competitors and explain how the business will position itself. Strong submissions estimate demand from the bottom up, using local data and customer evidence, rather than quoting national industry totals, compare competitors on the dimensions customers care about and state the assumptions still untested. Research on business planning and new venture success can explain why the analysis matters and what it can and cannot tell an entrepreneur.
How this OL 630 Module 3 milestone one example is built
The sample presents Curbside Tread Co., an imagined mobile tire service in Columbus, Ohio, that customer discovery redirected toward commercial fleets. It defines two segments, delivery, landscaping and service fleets of 5 to 60 vehicles and busy households in four suburbs, estimates reachable demand from county business counts, fleet interviews and pilot data and compares five competitor types: dealerships, big-box tire centers, an online tire retailer's local installer network and two small mobile operators. A positioning statement emphasizes vans back on the road without leaving the lot. The paper draws on Delmar and Shane's study of business planning in Swedish ventures, Brinckmann and colleagues' meta-analysis on when planning helps and Hurst and Pugsley's evidence that most small businesses offer existing services to existing markets.
Where the OL 630 Module 3 rubric puts the points
OL 630 Milestone One is typically graded on a clear business concept and value proposition, well-defined target segments, a credible bottom-up market estimate, a competitive analysis organized around what customers value, a defensible positioning statement, acknowledgment of untested assumptions and use of research. The strongest OL 630 first milestones make the reader believe a specific customer will choose this business over a named alternative. Marks are lost for top-down market sizes drawn from national totals, for claiming there is no competition, for target markets as broad as "everyone with a car," for ignoring customer evidence already gathered or for hiding the assumptions that still need testing.
OL 630 Module 3 help: the mistakes that cost points
State the concept in two sentences: who the customer is, what problem you solve and why they will choose you. Define segments narrowly enough to reach. Estimate reachable demand from the bottom up: number of potential customers in your area, the share you can realistically win and how much each buys a year, using local data and your own customer evidence. List every alternative customers use today, including doing nothing, and compare them on price, convenience, speed and trust. Write a positioning statement. List the assumptions still untested and how you will test them. Use research on planning and new ventures to frame what the analysis can and cannot predict.
Get OL 630 Module 3 written to your instructions
Share the OL 630 Milestone One guidelines and your venture idea with any customer evidence you have. We write the business concept and value proposition, define target segments, estimate reachable demand from the bottom up, analyze competitors and set out positioning and open assumptions, supported by entrepreneurship research. The first OL 630 milestone is free and ready in roughly two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More OL 630 papers and related MS Organizational Leadership samples
- OL 630 Module 1 Discussion: Opportunity Recognition
- OL 630 Module 2 Customer Discovery Assignment: Testing a Business Idea
- OL 630 Module 4 Discussion: Hiring and HR in a Small Business
- OL 630 Module 5 Milestone Two: Marketing, Operations and Management Plan
- OL 630 Module 6 Discussion: Founder Traits and Persistence
- OL 630 Module 7 Milestone Three: Financial Plan and Funding
- OL 630 Module 8 Discussion: Business Failure and Closure
- OL 630 Module 9 Final Project: Business Plan
- OL 630 Module 10 Discussion: Entrepreneurial Exit
- MKT 668 Module 6 Milestone Two: Pricing and Managing Demand and Capacity
- ACC 620 Module 5 Pension Assignment: Cost and Funded Status of a Frozen Plan
- OL 600 Module 2 External Environment Assignment: External Environment and Labor Market Analysis
- MKT 620 Module 7 Discussion: Decision Shortcuts and Procrastination
OL 630 Module 3 questions, answered
Where can I find a free OL 630 Module 3 Milestone One sample?
The full OL 630 Milestone One is on this page: the business concept, market estimate and competitive analysis for a mobile tire service.
What is a bottom-up market estimate?
An estimate built from the number of reachable customers, the share a business can win and what each buys, rather than from national industry totals.
Does writing a business plan help new ventures?
A study of Swedish ventures found business planning reduced the chance of disbanding and sped up product development and organizing, though planning's value varies by context.
How do you analyze competitors for a small business?
List every alternative customers use, including doing nothing, and compare them on the things customers care about, such as price, convenience, speed and trust.
What is a positioning statement?
A short statement of which customers a business serves, what need it meets and why it is the better choice than named alternatives.