| Course | MKT 668 Services Marketing |
|---|---|
| Module | Module 6 |
| Paper type | graduate milestone analyzing a service's demand pattern and capacity and setting prices, packages and booking rules to balance them fairly |
| Length | About 1,000 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MS in Marketing |
| Updated | October 2026 |
Free sample paper for MKT 668 Module 6
Empty Tuesdays, Sold-Out Holidays: Pricing and Capacity at Foothills Dog Lodge
[Student Name]
Southern New Hampshire University
MKT 668: Services Marketing
Milestone Two: Pricing and Capacity Plan
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Empty Tuesdays, Sold-Out Holidays: Pricing and Capacity at Foothills Dog Lodge
Introduction
Foothills Dog Lodge has two problems that are really one. On Tuesdays, Wednesdays and Thursdays, its four lodges fill only about half their daycare spaces. In the weeks around Thanksgiving, Christmas, spring break and the Fourth of July, boarding is sold out two months ahead and families are turned away. A space left empty on a Tuesday cannot be saved for Christmas, so the business must shape when people come and set capacity to match. This milestone analyzes the pattern, defines capacity, proposes prices and rules and checks them for revenue and fairness.
Demand Pattern
Average daycare use by day, past twelve months, all four lodges
| Day | Spaces available | Average dogs | Use |
|---|---|---|---|
| Monday | 360 | 316 | 88% |
| Tuesday | 360 | 192 | 53% |
| Wednesday | 360 | 184 | 51% |
| Thursday | 360 | 189 | 53% |
| Friday | 360 | 318 | 88% |
Boarding, with 220 kennel suites across the lodges, averaged 61 percent occupancy over the year but was full for about 38 nights, around the main holidays. The booking system recorded about 340 boarding requests turned away last year. Owners who work hybrid schedules explain the daycare pattern: most are home Tuesday through Thursday and in the office on Mondays and Fridays.
What Capacity Really Is
Each lodge has floor space for about 120 dogs in daycare. But the true limit is handlers. The company's policy, which the Module 2 analysis found was being broken, is 15 dogs per handler. On Mondays and Fridays, staffing shortages push groups to 18 dogs, which affects safety and the report cards owners want. Capacity in this plan is therefore set at 90 daycare dogs per lodge per day, six handlers' worth, with a seventh handler scheduled on Mondays and Fridays. The figures above use 90 per lodge.
Shifting Weekday Demand
The plan introduces a Midweek Ten package: ten daycare days usable Tuesday through Thursday for $300, against the standard $38 a day. Kimes and Wirtz (2003), asking restaurant customers in Singapore, Sweden and the United States about different demand-based prices, found time-of-day pricing and two-for-one coupons were seen as fair while charging more for a better table was seen as somewhat unfair, and that presenting price differences as discounts made them feel fairer. The Midweek Ten is presented as a saving on quiet days, never as a surcharge on busy ones, and it is fenced by day, so it cannot be used on Mondays or Fridays.
A risk is that owners already coming midweek at $38 switch to the package. About 40 percent of midweek dogs come on single-day passes. The projection assumes they switch, losing about $8 per day, and that the package draws enough new midweek visits to more than cover the loss.
Selling Holidays in Advance
Xie and Shugan (2001) showed that selling ahead of consumption can raise a provider's profit when buyers are uncertain about their future needs and capacity is limited, and that the advance price and the rules for what happens if plans change both matter. Holiday boarding fits: families plan trips months ahead but their plans can shift. The plan opens holiday booking on September 1 for Thanksgiving and Christmas and on February 1 for spring and summer holidays, with a 30 percent deposit refundable until 21 days before the stay and a three-night minimum on peak nights. A waitlist takes over when a holiday fills, with automatic offers when cancellations come in.
The holiday price rises from $62 to $70 a night on the 38 peak nights only. Customers are told plainly why: holiday nights require extra staff paid at holiday rates.
Fairness
Bolton et al. (2003) found that consumers typically believe a business's prices are well above a fair level, underestimating its costs and attributing price differences to profit, and that explaining costs helped only modestly. The plan therefore avoids changes that look like profit-taking. The weekday package is a saving, holiday rates are tied to a visible reason and regular customers who have boarded at least three times in the past year are offered first booking on holidays, a week before others.
Projected Effect
First-year projection
| Change | Assumption | Added revenue |
|---|---|---|
| Midweek Ten package | 75 added midweek dogs per day across the lodges at $30, less $8 a day on the 75 regulars who switch | $257,000 |
| Holiday rate on 38 peak nights | 220 suites at 98% occupancy, $8 more per night | $65,000 |
| Waitlist recovering turned-away requests | 140 of 340 requests filled through cancellations, average 4 nights | $37,000 |
| Shoulder nights from three-night minimum | Added nights around holidays | $51,000 |
| Total | $410,000 |
Against this, the seventh Monday and Friday handler and holiday staffing cost about $118,000 a year, leaving a net gain of roughly $292,000. The largest figure, the Midweek Ten, is also the least certain, so the plan will test the package at the Nampa lodge for eight weeks before offering it at all four.
Effects on Service and Staff
Filling midweek play yards adds handler hours on days that are currently quiet, which helps part-time handlers who want more stable schedules. The plan holds the 15-dog ratio on every day, including busy ones, so added revenue does not come at the expense of safety. Holidays bring different pressures: long stays, anxious dogs and staff who would rather be with their own families. The plan pays holiday rates to boarding staff and caps any handler at five consecutive holiday shifts. It also adds a short daily photo update for every boarding guest on peak nights, a small cost that answers the question owners ask most from a beach or a relative's house: is my dog all right? Better-rested staff and steady updates protect the lodge's rating at the very time most new customers try it.
Conclusion
Foothills does not have too little demand or too little space. It has demand on the wrong days and a capacity limit set in the wrong place. The plan moves demand to the quiet days with a fair saving, sells the scarce holiday nights ahead with clear rules and keeps capacity tied to the handlers who make each day safe.
References
Bolton, L. E., Warlop, L., & Alba, J. W. (2003). Consumer perceptions of price (un)fairness. Journal of Consumer Research, 29(4), 474-491. https://doi.org/10.1086/346244
Kimes, S. E., & Wirtz, J. (2003). Has revenue management become acceptable? Findings from an international study on the perceived fairness of rate fences. Journal of Service Research, 6(2), 125-135. https://doi.org/10.1177/1094670503257038
Xie, J., & Shugan, S. M. (2001). Electronic tickets, smart cards, and online prepayments: When and how to advance sell. Marketing Science, 20(3), 219-243. https://doi.org/10.1287/mksc.20.3.219.9765
What the MKT 668 Module 6 instructions ask for
Milestone Two in MKT 668 often asks you to develop pricing and demand management for your service. Expect to analyze patterns of demand over time, define capacity and its limits, and propose strategies to shift or shape demand, such as off-peak pricing, packages, reservations and waitlists, alongside ways to adjust capacity. A strong milestone uses data to show the mismatch, defines capacity by the true constraint rather than the obvious one, frames price differences so customers find them fair, estimates the effect on revenue and use and considers how the changes affect service quality and employees. Check every pricing change for fairness as customers will see it, not only for revenue.
How this MKT 668 Module 6 milestone two example is built
The sample examines the composite Foothills Dog Lodge's demand pattern: daycare fills 52 percent of its spaces Tuesday to Thursday and 88 percent on Mondays and Fridays, while holiday boarding sells out eight weeks ahead and about 340 requests a year are turned away. It defines capacity by handler ratios rather than floor space, proposes a midweek package of ten days at $300, holiday boarding sold from September with a deposit and a three-night minimum and a waitlist, and projects about $410,000 in added yearly revenue. Kimes and Wirtz on fairness of demand-based pricing, Xie and Shugan on advance selling and Bolton, Warlop and Alba on perceived price fairness support it. A projection of added revenue and staffing costs closes the analysis.
Where the MKT 668 Module 6 rubric puts the points
The second MKT 668 milestone is commonly graded on an evidence-based analysis of demand and capacity, a correct definition of the binding capacity constraint, strategies that shift demand and adjust capacity, pricing that customers will see as fair, revenue estimates with stated assumptions, attention to quality and staff and use of research. High-scoring submissions present demand data in tables and show the arithmetic. Submissions lose credit for discounting without a reason, raising peak prices with no thought to fairness, ignoring the staff needed to serve added demand or giving projections with no assumptions. Holding service quality steady while capacity is filled shows sound judgment.
MKT 668 Module 6 help: the mistakes that cost points
Gather demand data by hour, day and season, and calculate use as a share of capacity. Identify the true limit on capacity, which in many services is staff rather than space. Then look for ways to move demand from peaks to valleys, such as off-peak prices framed as savings, packages, reservations and deposits, and ways to adjust capacity, such as part-time shifts. Check each idea for fairness from the customer's point of view and for its effect on quality. Estimate revenue with clear assumptions and show the arithmetic. Note the risks, including customers who were paying full price switching to a discount. Present weekday prices as savings rather than surcharges on busy days.
Get MKT 668 Module 6 written to your instructions
Send the MKT 668 Milestone Two brief and your service's demand pattern. We analyze demand and capacity, design prices, packages and booking rules that balance them, project revenue and test each change for fairness with pricing research. The first pricing milestone is prepared free; plan on about two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More MKT 668 papers and related MS in Marketing samples
- MKT 668 Module 1 Discussion: What Makes a Service Different
- MKT 668 Module 2 Service Quality Gaps Assignment: Service Quality Gaps Analysis
- MKT 668 Module 3 Milestone One: Service Blueprint and Customer Journey
- MKT 668 Module 4 Discussion: The Servicescape and Physical Evidence
- MKT 668 Module 5 Service Recovery Assignment: Service Failure and Recovery
- MKT 668 Module 7 Discussion: Front-Line Employees and Service Climate
- MKT 668 Module 8 Customer Experience Measurement Assignment: Measuring Service Quality and Customer Experience
- MKT 668 Module 9 Discussion: Self-Service Technology in Services
- MKT 668 Module 10 Final Project: Services Marketing Plan
- FIN 685 Module 5 Commodity Hedging Assignment: Hedge Ratios, Basis and Margin Calls
- MGT 510 Module 4 Leadership and Culture Assignment: What Leaders Watch, Reward and Repeat
- ACC 610 Module 2 Codification Research Assignment: Principal or Agent for Spraying Services
- FIN 700 Module 4 Discussion: Is 9.4 Percent the Right Hurdle?
MKT 668 Module 6 questions, answered
Where can I find a free MKT 668 Module 6 Milestone Two sample?
The complete MKT 668 Milestone Two on this page analyzes a composite dog daycare's demand and capacity and sets fair prices, packages and booking rules.
How do service businesses manage demand and capacity?
By shifting demand with prices, packages and reservations and adjusting capacity with staffing, so that unused capacity in quiet periods and turned-away customers at peaks are both reduced.
Is demand-based pricing seen as unfair?
It depends on the form; research found time-based pricing and discounts were seen as fair while some other price differences were seen as unfair, and framing prices as discounts helped.
Why do customers think prices are unfair?
Research found customers tend to believe prices are well above fair levels, underestimating costs and inflation and attributing price differences to profit.
When should a service sell in advance?
Advance selling pays when buyers are uncertain about their future needs and capacity is limited, as with holiday travel or boarding.