MKT 668 Module 1 Discussion Example

Reviewed by Portia Lambrick, MBA

This MKT 668 Module 1 Discussion sample asks how the traits of a service change the way it has to be marketed. SNHU MKT 668 (MKT-668) opens the MS in Marketing course on services marketing with this question. The business is Foothills Dog Lodge, a composite dog daycare and boarding company with four locations near Boise, Idaho, whose owner wants to market daycare the way a pet food brand markets kibble. The post explains why that misses the point: no one can inspect a day of care in advance, dog and handler produce it together, quality varies by handler and an empty Tuesday space is lost for good. It ends by asking classmates which trait troubles their service most.

CourseMKT 668 Services Marketing
ModuleModule 1
Paper typegraduate discussion post on how the traits of a service change the way it must be marketed, applied to one service business
LengthAbout 360 words, 3 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMS in Marketing
UpdatedOctober 2026

Free sample paper for MKT 668 Module 1

1

Module One Discussion

Why a Day of Dog Care Cannot Be Sold Like a Bag of Kibble

Foothills Dog Lodge runs four lodges around Boise: daycare at $38 a day, boarding at $62 a night and grooming. Its rating has slid from 4.7 to 4.1, and its weekday play yards sit half empty. The owner wants to market daycare like a bag of kibble, with a new logo and a coupon for a free first day. I think that treats a service as if it were a product on a shelf.

What this page is doingThe owner's idea.
2

An owner cannot inspect a day of care before buying it; she sees a lobby and a smiling desk clerk and judges the rest at pickup. Her dog and the handler produce the day together, so a nervous dog has a different day from a confident one. Quality varies with the handler on shift and the play group. And a space unused on Tuesday is gone for good.

Zeithaml et al. (1985) set the services literature's list of problems arising from these traits beside what service suppliers they surveyed actually reported, and found the two did not always agree, which is a useful warning against treating the four traits as a checklist. Lovelock and Gummesson (2004) went further and argued that what unites services is that customers buy access or temporary use rather than ownership. That fits the lodge exactly: owners rent a safe place and a trusted person for their dog by the day. Vargo and Lusch (2004) argued that value is created with the customer rather than delivered to them. An owner who arrives at 7:20 with a dog who skipped breakfast and has no vaccination record on file is part of how the day turns out.

What this page is doingWhat is different here.
3

A coupon brings in first-time dogs but tells owners nothing about what they cannot see. The money would do more if it went to showing the day: photos and a short report card at pickup, a free half-day assessment so owners and handlers meet before the first visit, and a weekday price that fills Tuesdays.

What this page is doingWhat that means for the plan.
4

Which trait causes the most trouble in a service you use or work in?

What this page is doingYour service.
5

References

Lovelock, C., & Gummesson, E. (2004). Whither services marketing? In search of a new paradigm and fresh perspectives. Journal of Service Research, 7(1), 20-41. https://doi.org/10.1177/1094670504266131

Vargo, S. L., & Lusch, R. F. (2004). Evolving to a new dominant logic for marketing. Journal of Marketing, 68(1), 1-17. https://doi.org/10.1509/jmkg.68.1.1.24036

Zeithaml, V. A., Parasuraman, A., & Berry, L. L. (1985). Problems and strategies in services marketing. Journal of Marketing, 49(2), 33-46. https://doi.org/10.1177/002224298504900203

What the MKT 668 Module 1 instructions ask for

The opening discussion in MKT 668 usually asks you to explain what sets services apart from goods and how those differences affect marketing, often using a service business you know. Expect to apply the traditional characteristics, intangibility, inseparability of production and consumption, variability and perishability, or a newer view of services, to a specific case. Strong posts show concretely how each trait creates a marketing problem in that business, suggest how the business might respond and recognize the debate about whether the four traits really separate services from goods. They choose a service with real stakes for the customer, which makes the problems easy to see. Introduce the service you will follow with a figure or two so classmates can picture it.

How this MKT 668 Module 1 discussion example is built

The sample introduces Foothills Dog Lodge, a composite company with four lodges near Boise, Idaho, offering daycare at $38 a day, boarding at $62 a night and grooming. The owner wants to market daycare the way pet food brands market kibble, with coupons and a refreshed logo. The post explains why that misses the point, walking through what an owner cannot see before buying, how dog and handler produce the day together, why one handler's day differs from another's and why an empty Tuesday space is gone for good. Zeithaml, Parasuraman and Berry, Lovelock and Gummesson and Vargo and Lusch support the argument. The post closes by asking peers which trait shapes their own service most.

Where the MKT 668 Module 1 rubric puts the points

The first MKT 668 discussion is often graded on an accurate explanation of how services differ, application to a specific business, insight into the marketing problems those differences create, use of services research and engagement with classmates. Top posts move from definitions to consequences, showing what each trait means for promotion, pricing or delivery. Posts lose credit for listing the four traits without applying them, choosing a service so simple the traits barely matter, ignoring the employees who deliver the service or replying with brief agreement. The best replies identify a trait a classmate's service handles well and explain how. Linking each trait to a concrete marketing choice shows applied understanding.

MKT 668 Module 1 help: the mistakes that cost points

Pick a service you know well, ideally one where the customer cares a great deal about the result. For each trait, describe what the customer experiences and what problem it creates for the business: how do people judge quality before buying, who produces the service with them, why does it vary and what happens to unused capacity? Then suggest one response to each problem. Mention the newer view that services offer access rather than ownership, or that value is created with the customer, if it helps. End by inviting classmates to say which trait causes the most trouble in a service they use. Ask what a customer cannot see before buying, and plan how to show it.

Get MKT 668 Module 1 written to your instructions

Post your MKT 668 Module 1 prompt and the service you plan to study. We show how its traits shape the marketing problem, apply services research to your case and finish with a question for peers. Your first discussion post is written free, typically within two days of your request. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More MKT 668 papers and related MS in Marketing samples

MKT 668 Module 1 questions, answered

Where can I find a free MKT 668 Module 1 Discussion sample?

The full MKT 668 Module 1 post on this page explains how the traits of a service shape marketing at a composite dog daycare and boarding company.

What are the four characteristics of services?

Intangibility, inseparability of production and consumption, heterogeneity or variability and perishability, which together make services harder to evaluate, standardize and store than goods.

Why can't services be stored?

A service is produced when it is used, so capacity left unused at a given time, like an empty daycare space on a Tuesday, cannot be saved and sold later.

Is the four-characteristic view of services still accepted?

It is debated; some scholars argue services are better defined as access or temporary use without ownership, and others that all exchange involves service.

How do services marketers make quality visible?

Through physical evidence, such as facilities, staff appearance and reports, plus guarantees, reviews and trial offers that reduce the customer's uncertainty.