| Course | MKT 668 Services Marketing |
|---|---|
| Module | Module 8 |
| Paper type | graduate assignment designing a system to measure service quality and customer experience at the points that matter and to act on the results |
| Length | About 1,060 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MS in Marketing |
| Updated | October 2026 |
Free sample paper for MKT 668 Module 8
What Owners Feel at Pickup: A Customer Experience Measurement System for Foothills Dog Lodge
[Student Name]
Southern New Hampshire University
MKT 668: Services Marketing
Customer Experience Measurement Assignment
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
What Owners Feel at Pickup: A Customer Experience Measurement System for Foothills Dog Lodge
Introduction
Foothills Dog Lodge measures its service by one number: the average star rating on review sites, which fell from 4.7 to 4.1 in eighteen months. That number arrives late, comes mostly from the angriest and happiest owners and says nothing about which lodge, which step or which handler. The gaps analysis, the blueprint and the recovery work in earlier modules have shown where the experience is made and lost. This assignment designs a system that measures those points, chooses a headline metric on evidence and makes sure each result leads to action.
What to Measure
The blueprint from Milestone One identified the moments that shape owners' judgment: the first assessment, morning check-in, the dog's day and pickup. The measurement system covers each, plus the relationship as a whole.
Measures across the owner's journey
| Moment | Measure | Method | Frequency |
|---|---|---|---|
| First assessment | Satisfaction with the assessment; intention to book | Text survey after the visit | Every new owner |
| Morning check-in | Wait time at check-in | Timestamp from app scan to leash handoff | Daily |
| The dog's day | Report card completed; incidents per 1,000 dog-days; dogs per handler | Tablet records | Daily |
| Pickup | Satisfaction with the day; "Did you learn how your dog's day went?" | Two-question text survey | After every pickup, one in five owners sampled |
| Whole relationship | Overall satisfaction, value, likelihood to continue, open comment | Online survey of all active owners | Quarterly |
| Outside view | Themes and tone in reviews and complaints | Coding by the operations assistant | Monthly |
| Service standard | Greeting, lobby, pickup explanation | Mystery-owner visit with a real dog | Quarterly at each lodge |
The Pickup Survey
After pickup, a sample of one in five owners receives a text within an hour: "How satisfied are you with Scout's day today?" on a scale of 1 to 10, and "Did you learn how Scout's day went?" yes or no. Two questions take less than a minute, and the second question measures the main gap found in Module 2. Sampling one in five keeps any owner from being asked more than about once a month.
The Relationship Survey
Each quarter all owners active in the past 90 days receive a survey of eight questions: overall satisfaction, satisfaction with care, communication, check-in and pickup, cleanliness and safety, perceived value for the price and likelihood to keep using the lodge, with one open question. The survey is the same each quarter so trends can be compared across lodges and over time.
Choosing the Headline Metric
The owner wanted a promoter score as the headline, because other businesses report one. The evidence counsels caution. Keiningham et al. (2007), using longitudinal data from 21 firms and more than 15,500 interviews in Norway, set out to replicate the claim that the Net Promoter metric was clearly superior in predicting growth and could not do so; other satisfaction measures performed as well. Morgan and Rego (2006) compared six common satisfaction and loyalty metrics against later business performance across many firms and found that average satisfaction scores had the greatest predictive value, with top-two-box satisfaction also useful and the promoter-based measures weaker. The lodge will therefore report average overall satisfaction from the quarterly survey as its headline, with the share of owners who learned how their dog's day went as the second figure. The promoter question can be asked, but it will not run the business.
The quarterly survey's structure follows the logic of the national satisfaction index described by Fornell et al. (1996), in which customers' expectations, their perception of quality and their sense of value for money together shape satisfaction, which then shapes complaints and loyalty. Measuring value and continuing intention alongside satisfaction lets the lodge see whether a fall in satisfaction comes from quality or price. Fornell and colleagues also reported that satisfaction in the United States was lower for services than for goods, a reminder that the lodge competes against owners' general frustration with services, not only against rival lodges.
Operational Measures
Surveys show how owners feel; operational measures show why. The system tracks check-in wait from the app scan to the leash handoff, the share of dogs with a completed report card, the number of dogs per handler by hour and incidents per 1,000 dog-days. These come from the tablet and booking system automatically, so they cost almost nothing to collect.
Targets
Baseline and targets
| Measure | Current | Target in six months | Target in twelve months |
|---|---|---|---|
| Average overall satisfaction (1 to 10) | Not measured; first wave sets baseline | +0.5 over baseline | +1.0 over baseline |
| Owners who learned how the dog's day went | 30% (report card rate) | 75% | 90% |
| Average check-in wait, 7:00 to 7:45 | 11 minutes | 5 minutes | 3 minutes |
| Report cards completed | 30% | 85% | 95% |
| Groups above 15 dogs per handler | 40% of Monday and Friday hours | 10% | 0% |
| Star rating on review sites (out of 5) | 4.1 | 4.3 | 4.5 |
Closing the Loop
Any owner who scores the day at 6 or below, or answers no to the second question, appears on the lodge manager's screen the same day. The manager calls within one business day, listens, fixes what can be fixed and records the reason in one of eight categories. The same categories are used in coding reviews and complaints, so problems can be added up. Each month the operations director reviews the categories across lodges with the four managers, chooses one problem to fix and checks the next month whether it moved.
Responsibilities
The operations assistant runs the surveys and coding. Each lodge manager owns their lodge's closed loop and operational measures. The operations director owns the monthly review and the targets. A one-page dashboard goes to the owner monthly.
Limits
Survey responses come from owners who choose to answer, and satisfied owners may respond less. Mystery visits are few. The system will be reviewed after six months to drop measures no one uses. Scores can also be gamed: a handler who knows the pickup survey counts might ask owners for high marks. The survey therefore comes by text an hour after pickup, from the company rather than the lodge, and handlers are evaluated on the trend across many owners, never on a single response. Finally, the system measures what owners notice; it cannot see a near miss in the play yard that no owner hears about, which is why incident records remain part of the monthly review.
References
Fornell, C., Johnson, M. D., Anderson, E. W., Cha, J., & Bryant, B. E. (1996). The American Customer Satisfaction Index: Nature, purpose, and findings. Journal of Marketing, 60(4), 7-18. https://doi.org/10.1177/002224299606000403
Keiningham, T. L., Cooil, B., Andreassen, T. W., & Aksoy, L. (2007). A longitudinal examination of net promoter and firm revenue growth. Journal of Marketing, 71(3), 39-51. https://doi.org/10.1509/jmkg.71.3.39
Morgan, N. A., & Rego, L. L. (2006). The value of different customer satisfaction and loyalty metrics in predicting business performance. Marketing Science, 25(5), 426-439. https://doi.org/10.1287/mksc.1050.0180
What the MKT 668 Module 8 instructions ask for
The Module 8 assignment in MKT 668 often asks you to design a system for measuring service quality, customer satisfaction or customer experience. Expect to choose what to measure and when, select methods such as transactional and relationship surveys, complaint analysis, mystery shopping and operational metrics, decide on headline metrics, set targets and explain how results will lead to action. A strong assignment ties measures to the points in the journey where experience is made or lost, uses more than one method, justifies its headline metric with evidence rather than fashion, keeps surveys short and closes the loop with customers who report problems. Make sure every low score leads to a call and a recorded reason, so the system drives action.
How this MKT 668 Module 8 customer experience measurement assignment example is built
The sample designs measurement for the composite Foothills Dog Lodge, which has tracked only its online star rating. It adds a two-question text survey after each pickup, a quarterly relationship survey of active owners, monthly coding of complaints and reviews, a quarterly mystery-owner visit at each lodge and operational measures tied to the blueprint's fail points, such as check-in wait and report card completion. It chooses average satisfaction as the headline metric rather than a promoter score, sets targets and requires a call to every owner who gives a low score within one business day. Keiningham and colleagues, Morgan and Rego and Fornell and colleagues support the choices. It closes with the limits of the system and a date to review which measures are actually used.
Where the MKT 668 Module 8 rubric puts the points
Measurement assignments in MKT 668 are generally graded on measures tied to the customer journey, a sound mix of methods, a justified headline metric, well-designed survey questions, operational measures linked to service failures, targets, a closed-loop process and use of research. Excellent work explains what each measure will be used to decide. Submissions lose credit for relying on one score, long surveys that customers will not finish, metrics adopted because they are popular, measures no one owns or results that are reported but never acted on. Systems that tie each measure to a fail point on the blueprint earn the most credit.
MKT 668 Module 8 help: the mistakes that cost points
List the moments in your customer journey where experience is made or lost, using your blueprint if you have one. For each, choose a way to measure it: a short survey right after, an operational metric or observation. Add a periodic relationship survey that asks about the whole service. Choose a headline metric and justify it with research on which metrics predict loyalty and performance. Keep questions few and neutral. Set targets from a baseline. Then describe the loop: who reads results, how quickly unhappy customers are contacted and how patterns lead to changes. Keep the pickup survey to two or three questions; owners collecting a dog will not answer ten.
Get MKT 668 Module 8 written to your instructions
Share the MKT 668 Module 8 directions and the service you are measuring. We choose measures for each point in the journey, design surveys and operational metrics, set targets and a closed loop for acting on results and support each choice with research on satisfaction and loyalty metrics. The first measurement paper is free and arrives within about two days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More MKT 668 papers and related MS in Marketing samples
- MKT 668 Module 1 Discussion: What Makes a Service Different
- MKT 668 Module 2 Service Quality Gaps Assignment: Service Quality Gaps Analysis
- MKT 668 Module 3 Milestone One: Service Blueprint and Customer Journey
- MKT 668 Module 4 Discussion: The Servicescape and Physical Evidence
- MKT 668 Module 5 Service Recovery Assignment: Service Failure and Recovery
- MKT 668 Module 6 Milestone Two: Pricing and Managing Demand and Capacity
- MKT 668 Module 7 Discussion: Front-Line Employees and Service Climate
- MKT 668 Module 9 Discussion: Self-Service Technology in Services
- MKT 668 Module 10 Final Project: Services Marketing Plan
- MKT 555 Module 5 Content Evaluation Assignment: Constructing and Evaluating Social Media Content
- ACC 646 Module 2 Fraud Tree Assignment: Sorting the Schemes a Tip Uncovered
- MKT 665 Module 5 Story Development Assignment: Developing a Brand Story for Video
- HRM 630 Module 3 Discussion: Who the Customers Really Are
MKT 668 Module 8 questions, answered
Where can I find a free MKT 668 Module 8 customer experience measurement sample?
This page has the complete MKT 668 Module 8 assignment, designing a measurement system for a composite dog daycare with surveys, operational metrics and a closed loop.
How do you measure customer experience in a service?
With short surveys right after key moments, periodic surveys about the whole relationship, analysis of complaints and reviews, observation and operational metrics tied to the steps where service fails.
Is Net Promoter Score the best customer metric?
Research has questioned it: one study could not replicate claims of its superiority, and another found average satisfaction predicted business performance better.
What is a closed-loop feedback system?
A process in which customers who report a problem are contacted promptly, the issue is resolved and patterns in feedback lead to changes in the service.
What is the American Customer Satisfaction Index?
A national, survey-based measure of customer satisfaction for firms and industries, built on a model linking expectations, perceived quality and value to satisfaction and loyalty.