| Course | MKT 665 Digital Story Telling and Branding |
|---|---|
| Module | Module 5 |
| Paper type | graduate assignment developing one brand story into a structured script or storyboard for digital video, with the reasoning behind each choice |
| Length | About 1,000 words, 6 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MS in Marketing |
| Updated | October 2026 |
Free sample paper for MKT 665 Module 5
Ninety Seconds at the Grinding Wheel: Developing the Anchor Story for Oil Creek Cutlery
[Student Name]
Southern New Hampshire University
MKT 665: Digital Story Telling and Branding
Story Development Assignment
[Instructor Name]
[Date]
The organization, setting and figures below are a composite written as a model document. No real employer, client, colleague or patient is described.
Ninety Seconds at the Grinding Wheel: Developing the Anchor Story for Oil Creek Cutlery
Introduction
The brand narrative from Milestone One centers on people in a small town who have given decades to grinding blades and who still sharpen every knife they sell. This assignment develops the one story that will anchor the campaign, a 90-second video called "The Wheel." It shows the story's structure, the script and storyboard, the production choices and the shorter versions, and explains each with research on how stories persuade and spread.
The Beat Outline
Beat outline for "The Wheel"
| Beat | Seconds | What happens |
|---|---|---|
| Opening | 0 to 10 | Sound of a grinding wheel in near darkness; sparks; Earl's hands guiding a blade |
| Character | 10 to 25 | Earl, 38 years at this wheel, checks the edge against the light |
| Challenge | 25 to 40 | He finds a tiny chip; he frowns, shakes his head and starts again |
| Turn | 40 to 60 | He calls Dana over; she takes the blade while he watches, his hand near hers |
| Resolution | 60 to 80 | The finished knife slices a tomato paper-thin; Earl nods once |
| Coda | 80 to 90 | A worn 1962 paring knife arrives in a padded envelope with a note: "My grandmother's. Can you?" On screen: "We still sharpen every knife we've ever made. Oil Creek Cutlery, Titusville, Pennsylvania." |
Why the Structure Works
Van Laer et al. (2014), integrating two decades of research on narrative transportation, found that stories draw audiences in through identifiable characters, imaginable plots and verisimilitude, and that transportation leads to changes in beliefs, attitudes and intentions consistent with the story. "The Wheel" gives viewers one character to follow, a small and visible problem in the chipped edge, and a world, the plant, that is plainly real. Green and Brock (2000) found that more transported readers held beliefs more consistent with a story and found fewer false notes in it. Every detail is true, so there are none to find: Earl's years, the wheel, Dana's apprenticeship, the returned knife.
The challenge is deliberately small. A knife company story could reach for drama, but a chipped edge that the craftsman will not accept says more about care than any narrator could. The turn, Earl handing the blade to Dana, carries the theme of continuity without stating it.
Sound, Words and Music
The video has no music. The sound of the wheel, the ring of steel and the quiet of the plant carry the mood, and music would signal that the brand is trying to make viewers feel something. Earl speaks one line, unscripted in the final take: "Not good enough. Again." Dana says nothing. The only text on screen is the closing line.
Where the Brand Appears
Tellis et al. (2019), who analyzed which video ads people passed along on several platforms, found that content heavy with information was shared less, that ads stirring warm or inspiring feelings were shared more and that prominent brand placement, early or persistent, reduced sharing, while videos of moderate length were shared most. "The Wheel" keeps the brand out of the first 80 seconds, uses warmth and inspiration rather than information and runs about a minute and a half. The brand appears once, at the end, attached to the promise that makes the story matter: free sharpening for life.
Storyboard Notes
The opening uses a tight shot of the wheel in a darkened bay, lit by sparks. The character beat moves to Earl's face in profile, with the plant's 1919 drop hammer visible behind him. The challenge is a close-up of the edge against a window. The turn widens to show both Earl and Dana at the wheel. The resolution is a single overhead shot of the tomato. The coda moves to the mail room, where a staff member opens the envelope and reads the note. All footage is shot in the plant during normal work, with Earl and Dana paid for their time and both approving the final cut.
Versions for Each Platform
Versions
| Version | Length | Platform | What it keeps |
|---|---|---|---|
| Full story | 90 seconds | Website, video platform, email | All beats |
| Short | 30 seconds | Social feeds | Challenge, turn, resolution, closing line |
| Micro | 15 seconds | Short-video apps | Chipped edge, Dana finishing it, the tomato, closing line |
| Still series | Images | Instagram, catalog | Earl, Dana, the 1962 knife with its note |
Every version keeps the turning point, Earl handing the blade to Dana, because it carries the theme of the whole campaign.
Testing Before Launch
Before the video is finalized, the team will show a rough cut to three groups of eight cooks from the target audience, recruited from the survey panel used in Milestone One. Each viewer will be asked to retell the story in their own words, to say what they believe about the company afterward and to rate how much they would like to share it. The test has two purposes. First, it checks that the turn is understood: if viewers do not notice that Earl hands the blade to Dana, or think she is simply another worker, the scene needs a clearer shot of his hand withdrawing. Second, it checks for false notes: any detail viewers describe as staged will be reshot or cut. The team will also show the rough cut to Earl and Dana and to three long-time grinders, since the people in the plant are the first and harshest judges of whether the video looks like their work.
Why Not a Longer Film
The agency proposed a four-minute documentary. It would allow more of the town and more voices, but the research on sharing favors moderate length, and the target cooks watch most video on their phones. A longer film can come later, once the short story has found its audience and the company knows which details viewers care about most.
Risks
The video could be read as nostalgia rather than a living craft; Dana's presence is the answer. Earl or Dana could later leave the company; the agreement allows the video to remain in use with their consent and gives either the right to ask for its removal.
References
Green, M. C., & Brock, T. C. (2000). The role of transportation in the persuasiveness of public narratives. Journal of Personality and Social Psychology, 79(5), 701-721. https://doi.org/10.1037/0022-3514.79.5.701
Tellis, G. J., MacInnis, D. J., Tirunillai, S., & Zhang, Y. (2019). What drives virality (sharing) of online digital content? The critical role of information, emotion, and brand prominence. Journal of Marketing, 83(4), 1-20. https://doi.org/10.1177/0022242919841034
Van Laer, T., de Ruyter, K., Visconti, L. M., & Wetzels, M. (2014). The extended transportation-imagery model: A meta-analysis of the antecedents and consequences of consumers' narrative transportation. Journal of Consumer Research, 40(5), 797-817. https://doi.org/10.1086/673383
What the MKT 665 Module 5 instructions ask for
The Module 5 assignment in MKT 665 usually asks you to develop one brand story in detail, often as a script, storyboard or story outline for video or another digital format. Expect to show the story's structure, characters, setting and turning point, the words or narration, the visual and sound choices and where and how the brand appears, along with the reasoning behind each decision. A strong assignment keeps the story small and specific, opens in a way that holds attention in the first seconds, builds to a change the audience feels, places the brand where it supports rather than interrupts the story and plans versions for different platforms without losing the core. Plan shorter versions for each platform without losing the turning point of the story.
How this MKT 665 Module 5 story development assignment example is built
The sample develops "The Wheel," a 90-second video for the composite Oil Creek Cutlery Company. It opens on the sound of a grinding wheel and Earl's hands, introduces a small challenge when a chef's knife shows a tiny chip in its edge, turns as Earl calls Dana over to finish it while he watches and resolves with a tomato sliced paper-thin and a worn 1962 paring knife arriving in the mail for free sharpening. There is no music, little narration and the brand name appears only at the end. Van Laer and colleagues on transportation, Green and Brock on absorption and Tellis and colleagues on video sharing support the choices, and 15- and 30-second cuts are planned. Cut-downs for social feeds and short-video apps keep the moment Earl hands the blade to Dana.
Where the MKT 665 Module 5 rubric puts the points
Story development assignments in MKT 665 are typically graded on a clear narrative structure, vivid and specific characters and setting, a turning point that creates change, script or storyboard quality, deliberate choices about voice, sound and brand placement, platform versions and the evidence behind each decision. Top submissions show the script or storyboard and explain why each element is there. Submissions lose marks for stories that list features, scripts with no turning point, brand logos interrupting the opening, music chosen to manufacture emotion the story does not earn or a single long cut for every platform. Graders look for a clear reason behind every production choice, including what was left out.
MKT 665 Module 5 help: the mistakes that cost points
Choose one story from your narrative and keep it small: one character, one place, one moment of change. Write a beat outline first: opening, challenge, turn, resolution. Then draft the script or storyboard shot by shot, with sound and any words. Decide where the brand appears and why. Plan the first three seconds carefully, since many viewers decide then. Use research on narrative transportation and on video sharing to explain your choices. Plan shorter versions that keep the turning point. Get consent from anyone real who appears, and note it. Show the story to a few people unfamiliar with the brand and ask them to retell it.
Get MKT 665 Module 5 written to your instructions
Share the MKT 665 Module 5 directions and your brand narrative. We develop one story into a script and storyboard, explain its structure, voice, sound and brand placement with research on narrative and video, and plan cut-downs for each platform. We draft your first story development paper free; expect it two days after you send the brief. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More MKT 665 papers and related MS in Marketing samples
- MKT 665 Module 1 Discussion: Why Stories Persuade
- MKT 665 Module 2 Brand Story Audit Assignment: Brand Story Audit
- MKT 665 Module 3 Milestone One: Brand Narrative and Target Audience
- MKT 665 Module 4 Discussion: Brand Authenticity in Digital Storytelling
- MKT 665 Module 6 Milestone Two: Storytelling Content Plan Across Channels
- MKT 665 Module 7 Discussion: Customers' Stories and Brand Communities
- MKT 665 Module 8 Story Measurement Assignment: Measuring a Storytelling Campaign
- MKT 665 Module 9 Discussion: Honesty in Origin Claims and Brand Stories
- MKT 665 Module 10 Final Project: Digital Storytelling Campaign
- MKT 610 Module 1 Discussion: The Role of Promotion in the Marketing Mix
- ACC 692 Module 6 Milestone Two: Rights, Warnings and Evidence That Will Hold
- MKT 555 Module 9 Discussion: Responding to Negative Comments
- FIN 610 Module 6 Milestone Two: Receivables and Payables Policy
MKT 665 Module 5 questions, answered
Where can I find a free MKT 665 Module 5 story development sample?
This page has the complete MKT 665 Module 5 assignment: a 90-second script and storyboard for a composite knife maker's anchor story, with reasoning.
How should a brand story video be structured?
With an opening that holds attention, a small challenge, a turning point and a resolution that shows change, keeping to one character and moment.
Where should the brand appear in a story video?
Research on video sharing found prominent early branding reduced sharing, so many story videos keep the brand light until the end.
What draws viewers into a story?
Identifiable characters, imaginable events, a believable world and an audience willing to be absorbed, according to research on narrative transportation.
How long should a brand story video be?
Long enough to complete a small story, often 60 to 120 seconds for the main version, with shorter cuts that keep the turning point for platforms with brief attention.