MKT 665 Module 4 Discussion Example

Reviewed by Portia Lambrick, MBA

This MKT 665 Module 4 Discussion sample asks what makes a brand story authentic and how polish can make it feel false. SNHU MKT 665 (MKT-665) has MS in Marketing students apply authenticity research to their own brand's storytelling. The case is an agency's first video draft for Oil Creek Cutlery Company, a composite Pennsylvania knife maker: an actor playing a craftsman, warm music and the line "a century of tradition in every blade." The post argues the draft would look authentic and feel false, uses research on how craft brands earn sincerity, the dimensions of perceived authenticity and the mocking versions audiences build of insincere stories and asks classmates for examples.

CourseMKT 665 Digital Story Telling and Branding
ModuleModule 4
Paper typegraduate discussion post on what makes a brand story authentic and how authenticity can be lost in digital media
LengthAbout 340 words, 3 pages
FormatAPA 7 student paper
SchoolSouthern New Hampshire University
ProgramMS in Marketing
UpdatedOctober 2026

Free sample paper for MKT 665 Module 4

1

Module Four Discussion

Authentic, or Just Old?

The agency's first draft for Oil Creek is beautifully shot. A bearded actor in a leather apron works at a grinding wheel in slow motion, sparks arcing, piano music swelling, while a narrator says, "A century of tradition in every blade." It ends on the logo and "Since 1919." The marketing manager likes it. I think it would look authentic and feel false, especially to anyone who has seen the real plant.

What this page is doingThe draft.
2

In a study of 26 luxury wineries, Beverland (2005) traced authenticity to sincerity: handcraft, place, uniqueness and evident passion, with the commerce kept quietly in the background. The draft does the reverse: it uses every modern technique to say that the brand is traditional. Morhart et al. (2015) found perceived brand authenticity rests on credibility, integrity, symbolism and continuity. An actor undermines credibility; a slogan about tradition offers continuity without proof.

What this page is doingWhat authenticity is made of.
3

Thompson et al. (2006) described how emotional branding can provoke a doppelganger brand image, mocking versions of a brand's story that spread through popular culture and undercut its authenticity. Viewers who have seen Earl's real video will notice the actor within a day. A parody, "a century of tradition, one guy from casting," is easy to imagine. Knife enthusiasts are an especially unforgiving audience: they will notice that the actor's grip is wrong and that the sparks come from the wrong kind of wheel, and they will say so in the comments within hours of launch.

What this page is doingHow an audience pushes back.
4

Replace the actor with Earl and Dana, who have agreed to appear. Use the real sound of the wheel, no music. Replace "a century of tradition" with specific facts: Earl has worked this wheel for 38 years; the plant's drop hammer was installed in 1919; every knife comes back for free sharpening for life. Let the viewer conclude it is authentic. That is the only conclusion that persuades.

What this page is doingWhat I would change.
5

Where have you seen a brand's story lose its authenticity because it tried too hard to look authentic, and what would you have shown instead?

What this page is doingYour example.
6

References

Beverland, M. B. (2005). Crafting brand authenticity: The case of luxury wines. Journal of Management Studies, 42(5), 1003-1029. https://doi.org/10.1111/j.1467-6486.2005.00530.x

Morhart, F., Malär, L., Guèvremont, A., Girardin, F., & Grohmann, B. (2015). Brand authenticity: An integrative framework and measurement scale. Journal of Consumer Psychology, 25(2), 200-218. https://doi.org/10.1016/j.jcps.2014.11.006

Thompson, C. J., Rindfleisch, A., & Arsel, Z. (2006). Emotional branding and the strategic value of the doppelgänger brand image. Journal of Marketing, 70(1), 50-64. https://doi.org/10.1509/jmkg.70.1.050.qxd

What the MKT 665 Module 4 instructions ask for

The fourth MKT 665 discussion commonly asks you to examine authenticity in brand storytelling: what makes audiences believe a brand story and what makes them doubt it. Expect to evaluate a specific story, ad or draft for your brand and explain your judgment with research. Strong posts identify the specific signals that build or undermine credibility, such as real people, verifiable details, consistency with what the brand does and modest production, recognize that digital audiences can check claims and mock insincerity quickly and propose changes rather than simply calling something inauthentic. They distinguish between a brand's age and its authenticity. Close with a concrete change you would make, since the discussion is about practice as much as theory.

How this MKT 665 Module 4 discussion example is built

The sample judges an agency's first video draft for the composite Oil Creek Cutlery Company: an actor in a leather apron playing a craftsman, warm piano music, slow motion sparks and the line "a century of tradition in every blade." Beverland's study of how wineries crafted authentic stories by showing craft and playing down commercial motives, Morhart and colleagues' four dimensions of perceived brand authenticity and Thompson, Rindfleisch and Arsel's account of the mocking doppelganger images that grow around insincere emotional branding support the argument that the draft would look authentic and feel false. The post proposes using Earl, real sound and specific facts, and asks classmates where they have seen authenticity lost. The post recommends real people, real sound and specific facts in place of the actor and the slogan.

Where the MKT 665 Module 4 rubric puts the points

Grading for the authenticity discussion usually covers a careful evaluation of a specific story, use of research on brand authenticity, attention to how digital audiences respond, concrete suggestions and the replies. Strong posts point to particular elements that build or erode credibility and explain why. Posts lose credit for calling something authentic or fake without reasons, confusing heritage with authenticity, ignoring the risk of public mockery or replying to classmates with general agreement. A reply that finds a checkable detail a classmate's brand could show adds the most. Replies that suggest a specific fix, not just a critique, tend to earn full credit.

MKT 665 Module 4 help: the mistakes that cost points

Choose a specific story, ad or draft and describe what it shows and says. Ask what a skeptical viewer could check, and whether the details hold up. Use research on authenticity to identify which elements build credibility, such as real people and specific facts, and which undermine it, such as actors, stock imagery and superlatives. Consider how an online audience might mock the story if it seems insincere. Then suggest concrete changes. Separate age from authenticity: an old brand can tell a false story, and a new one a true one. Ask classmates for examples, and reply with a detail they could show. Look for the moment where the piece claims a quality rather than showing it; that is where authenticity slips.

Get MKT 665 Module 4 written to your instructions

Paste the MKT 665 Module 4 prompt and the story or draft you are judging. We test it against research on brand authenticity, point out what would ring false to your audience and suggest what to change, ending by asking peers for their own examples. Your first post costs nothing and is returned within a couple of days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.

More MKT 665 papers and related MS in Marketing samples

MKT 665 Module 4 questions, answered

Where can I find a free MKT 665 Module 4 Discussion sample?

The full MKT 665 Module 4 post on this page explains why a polished video with an actor would make a composite knife brand's story feel inauthentic.

What makes a brand story authentic?

Real people, specific and checkable details, consistency between what the brand says and does, a tie to a real place or craft and a modest presentation that does not oversell.

Is an old brand automatically authentic?

No; age helps only if the story is true and consistent with what the brand does now, and an old brand can lose credibility with polished, generic storytelling.

What is a doppelganger brand image?

A set of mocking or critical images and meanings about a brand that spread in popular culture, often when emotional branding seems insincere.

What are the dimensions of brand authenticity?

Research identified four: credibility, integrity, symbolism and continuity, which together shape whether consumers see a brand as genuine.