| Course | MKT 665 Digital Story Telling and Branding |
|---|---|
| Module | Module 1 |
| Paper type | graduate discussion post on why narratives persuade and what a brand story must contain to work |
| Length | About 400 words, 3 pages |
| Format | APA 7 student paper |
| School | Southern New Hampshire University |
| Program | MS in Marketing |
| Updated | October 2026 |
Free sample paper for MKT 665 Module 1
Module One Discussion
Why a Grinder's Hands Sell More Than a Spec Sheet
For this course I will follow Oil Creek Cutlery Company, a composite knife maker in Titusville, Pennsylvania, the town where the oil industry began. It was founded in 1919, employs 140 people and sells about $26 million a year of forged kitchen knives, most through hardware stores, department stores and its own catalog. Its customers skew older; many first used its knives in a parent's or grandparent's kitchen. Its catalog's main line is "quality cutlery since 1919."
Last spring, an employee's daughter filmed her father's coworker Earl, a grinder with 38 years at the plant, finishing the edge on a chef's knife and then slicing a tomato so thin it curled. She posted the two-minute clip without music or a logo. It has been shared about 9,000 times, and the company's phone line got calls from people asking where to buy "Earl's knife." No catalog line has done that.
Green and Brock (2000) found that people absorbed in a narrative, a state they called transportation, held beliefs more consistent with the story, judged its characters more favorably and noticed fewer false notes than less-absorbed readers. Earl's video transports viewers: the sound of the wheel, his hands, the tomato. The catalog line asks them to believe a claim.
Woodside et al. (2008) argued that consumers think and remember in stories and use brands as props or characters in the stories they tell about themselves. People sharing Earl's video were telling a story about valuing real craft. Van Laer et al. (2014), in a meta-analysis of research on narrative transportation, found that identifiable characters, a plot with imaginable events and verisimilitude, a sense that the story could be real, helped draw audiences in. The video has all three, and the brand did not even make it. Nothing in it is claimed; everything is shown. Viewers can see the steel change under the wheel and judge the edge for themselves on the tomato, which is a kind of proof no slogan can offer. Earl never says a word about quality, and he does not need to.
The company has the material for a story: a town with history, people with decades at their benches and a knife with a visible edge. What it lacks is the telling.
What true, specific detail in your organization could carry its story, the way Earl's hands carry this one?
References
Green, M. C., & Brock, T. C. (2000). The role of transportation in the persuasiveness of public narratives. Journal of Personality and Social Psychology, 79(5), 701-721. https://doi.org/10.1037/0022-3514.79.5.701
Van Laer, T., de Ruyter, K., Visconti, L. M., & Wetzels, M. (2014). The extended transportation-imagery model: A meta-analysis of the antecedents and consequences of consumers' narrative transportation. Journal of Consumer Research, 40(5), 797-817. https://doi.org/10.1086/673383
Woodside, A. G., Sood, S., & Miller, K. E. (2008). When consumers and brands talk: Storytelling theory and research in psychology and marketing. Psychology & Marketing, 25(2), 97-145. https://doi.org/10.1002/mar.20203
What the MKT 665 Module 1 instructions ask for
The first MKT 665 discussion usually asks why storytelling matters in branding and what makes a brand story effective, often while introducing the brand you plan to follow. You will likely describe the brand's current way of presenting itself, identify what kind of story it could tell and explain with research why narrative works differently from factual claims. Strong posts compare a real example of narrative and non-narrative communication for the brand, connect the difference to research on how audiences experience stories and name the specific, checkable details a story could be built from. A brief introduction to the brand, with a figure or two, keeps the focus on the argument. Keep the description of the brand brief so that most of the post explains why one piece works.
How this MKT 665 Module 1 discussion example is built
The sample introduces Oil Creek Cutlery Company, a composite Titusville, Pennsylvania, maker of forged kitchen knives founded in 1919, with 140 employees and $26 million in sales, whose catalog relies on the line "quality cutlery since 1919." A two-minute phone video of a grinder named Earl finishing a chef's knife, posted by an employee's daughter, has been shared about 9,000 times. Green and Brock's research on narrative transportation, Woodside, Sood and Miller on consumers' brand stories and van Laer and colleagues' meta-analysis of what draws audiences into stories explain why the video works. The post asks classmates for a true detail that could carry their brand's story. The post also notes that the company did not make the video, which is itself a lesson.
Where the MKT 665 Module 1 rubric puts the points
The opening MKT 665 discussion is usually marked on understanding of why narratives persuade, how well it is applied to one real brand, the research used, identification of real story material and replies to peers. Strong posts contrast the brand's current claims with a narrative alternative and name details an audience could believe because they can be checked. Posts lose credit for defining storytelling as advertising with feelings, proposing invented stories, citing slogans as stories or replying to classmates with encouragement alone. A reply that spots an untold detail in a classmate's organization is especially helpful. Naming the specific story element that makes a piece work earns more credit than praising it.
MKT 665 Module 1 help: the mistakes that cost points
Pick a brand you can study for the whole course. Describe how it presents itself now, quoting its tagline or a typical post. Then find one piece of communication, from the brand or its customers, that tells a story, and compare the two. Use research on narrative persuasion to explain why the story works differently. Identify true, specific details that could anchor a brand story, such as people, places, problems and moments. Avoid inventing anything. End by asking classmates for one true detail that could carry their brand's story, and reply with a question that helps them find it. Name the element doing the work: a character, a detail, a sound or a turn in events.
Get MKT 665 Module 1 written to your instructions
Share your MKT 665 Module 1 prompt and a sentence about the brand you will follow. We explain why stories move people where claims do not, find the true details your brand's story could rest on and finish by asking classmates about theirs. We write the opening post at no cost, and you have it within a couple of days. The paper above is an original model document written by our desk, not a submitted student paper and not an official Southern New Hampshire University document.
More MKT 665 papers and related MS in Marketing samples
- MKT 665 Module 2 Brand Story Audit Assignment: Brand Story Audit
- MKT 665 Module 3 Milestone One: Brand Narrative and Target Audience
- MKT 665 Module 4 Discussion: Brand Authenticity in Digital Storytelling
- MKT 665 Module 5 Story Development Assignment: Developing a Brand Story for Video
- MKT 665 Module 6 Milestone Two: Storytelling Content Plan Across Channels
- MKT 665 Module 7 Discussion: Customers' Stories and Brand Communities
- MKT 665 Module 8 Story Measurement Assignment: Measuring a Storytelling Campaign
- MKT 665 Module 9 Discussion: Honesty in Origin Claims and Brand Stories
- MKT 665 Module 10 Final Project: Digital Storytelling Campaign
- CSR 610 Module 7 Discussion: A Technician Who Reports Altered Records
- FIN 691 Module 8 Acquisition Modeling Assignment: Four Practices a Year at Six Times EBITDA
- MKT 660 Module 9 Discussion: Ethics of Nonprofit Storytelling and Imagery
- MGT 510 Module 2 Culture Assessment Assignment: Artifacts, Values and What No One Says
MKT 665 Module 1 questions, answered
Where can I find a free MKT 665 Module 1 Discussion sample?
The complete MKT 665 Module 1 post appears on this page: why a craftsman's short video sold a composite knife brand better than its slogan.
Why do stories persuade better than facts?
When people are absorbed in a story, they tend to accept its beliefs, warm to its characters and notice fewer weaknesses, an experience researchers call narrative transportation.
What makes a brand story effective?
True, specific details, a character the audience can identify with, a problem or challenge, a vivid setting and a structure that draws the audience in.
What is narrative transportation?
The experience of being absorbed into a story's world, involving imagery, emotion and focused attention, which makes the story's message more persuasive.
Is a slogan a brand story?
No; a slogan states a claim, while a story shows characters, events and change that let the audience reach the conclusion themselves.